Skip to main content
Erschienen in: Geotechnical and Geological Engineering 2/2018

09.10.2017 | Original paper

Examining Feasibility of Developing a Rock Mass Classification for Hard Rock TBM Application Using Non-linear Regression, Regression Tree and Generic Programming

verfasst von: A. Salimi, J. Rostami, C. Moormann, J. Hassanpour

Erschienen in: Geotechnical and Geological Engineering | Ausgabe 2/2018

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

Geotechnical and geological parameters have the greatest impact on the performance of hard rock tunnel boring machines (TBMs). This includes the rock and rock mass properties that affect the rate of penetration (ROP) as well as the machine utilization that is heavily dependent on ground support type and related machine downtime and delays. However, despite the widespread use of TBMs and established track records, accurate estimation of machine performance is still a challenge, especially in complex geological conditions. The past studies have tried to use rock mass classification systems for improving the accuracy of the machine performance prediction. Rock mass classifications has been primarily developed for design of ground support, and as such, have not offered a good fit for estimation of TBM performance. This paper will review performance of a hard rock TBM in a 12.24 km long tunnel and offers analysis of field performance data to evaluate the relationship between various lithological units and TBM operation. The results of statistical analysis of the initial 5.83 km long tunnel indicate strong relationships between geomechanical parameters and TBM performance parameters. Site specific models, including Non-linear regression analysis (NLRA), Classification and regression tree (CART), and Genetic Programming (GP) have been used for analysis of a TBM performance relative to the ground condition data. The current study has looked at the possibility of developing a new rock mass classification system for TBM application by using the above noted analysis. Preliminary results indicate that CART can be used for offering a proper rating scheme for a rock mass classification system that can be used for TBM applications.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literatur
Zurück zum Zitat Aeberli U, Wanner WJ (1978) On the influence of discontinuities at the application of tunneling machines. In: Proceedings of the 3rd international congress IAEG, Madrid, p 7–14 Aeberli U, Wanner WJ (1978) On the influence of discontinuities at the application of tunneling machines. In: Proceedings of the 3rd international congress IAEG, Madrid, p 7–14
Zurück zum Zitat Alber M (1996) Prediction of penetration, utilization for hard rock TBMs. In: Proceedings of the international conference of Eurock ‘96, Balkema, Rotterdam, p 721–725 Alber M (1996) Prediction of penetration, utilization for hard rock TBMs. In: Proceedings of the international conference of Eurock ‘96, Balkema, Rotterdam, p 721–725
Zurück zum Zitat Alber M (2000) Advance rates of hard rock TBMs and their effects on project economics. Tunn Undergr Space Technol 15(1):55–64CrossRef Alber M (2000) Advance rates of hard rock TBMs and their effects on project economics. Tunn Undergr Space Technol 15(1):55–64CrossRef
Zurück zum Zitat Alvarez Grima M, Bruines PA, Verhoef PNW (2000) Modeling tunnel boring machine performance by neuro-fuzzy method. Int J Tunn Undergr Space Technol 15:259–269CrossRef Alvarez Grima M, Bruines PA, Verhoef PNW (2000) Modeling tunnel boring machine performance by neuro-fuzzy method. Int J Tunn Undergr Space Technol 15:259–269CrossRef
Zurück zum Zitat Armaghani DJ, Tonnizam Mohamad E, Sundaram Narayanasamy M, Narita N, Yagiz S (2017) Development of hybrid intelligent models for predicting TBM penetration rate in hard rock condition. Int J Tunn Undergr Space Technol 63:29–43CrossRef Armaghani DJ, Tonnizam Mohamad E, Sundaram Narayanasamy M, Narita N, Yagiz S (2017) Development of hybrid intelligent models for predicting TBM penetration rate in hard rock condition. Int J Tunn Undergr Space Technol 63:29–43CrossRef
Zurück zum Zitat Barton N (2000) TBM tunneling in jointed and faulted rock. Balkema, Brookfield Barton N (2000) TBM tunneling in jointed and faulted rock. Balkema, Brookfield
Zurück zum Zitat Bieniawski ZT (1973) Engineering classification of jointed rock masses. Trans S Afr Inst Civ Eng 15:335–344 Bieniawski ZT (1973) Engineering classification of jointed rock masses. Trans S Afr Inst Civ Eng 15:335–344
Zurück zum Zitat Bieniawski ZT (1989) Engineering rock mass classifications. Wiley, New York, p 251 Bieniawski ZT (1989) Engineering rock mass classifications. Wiley, New York, p 251
Zurück zum Zitat Blindheim OT, Bruland A (1998) Boreability testing. Norwegian TBM tunneling. Norwegian Tunnelling Society, Oslo Blindheim OT, Bruland A (1998) Boreability testing. Norwegian TBM tunneling. Norwegian Tunnelling Society, Oslo
Zurück zum Zitat Breiman L, Friedman JH, Olshen RA, Stone CJ (1984) Classification and Regression Trees. Chapman and Hall/CRC Breiman L, Friedman JH, Olshen RA, Stone CJ (1984) Classification and Regression Trees. Chapman and Hall/CRC
Zurück zum Zitat Bruland A (1998) Hard rock tunnel boring. Ph.D. thesis, Norwegian University of Science and Technology, Trondheim Bruland A (1998) Hard rock tunnel boring. Ph.D. thesis, Norwegian University of Science and Technology, Trondheim
Zurück zum Zitat Cassinelli F, Cina S, Innaurato N, Mancini R, Sampaolo A (1982) Power consumption and metal wear in tunnel-boring machines: analysis of tunnel boring operation in hard rock. In: Tunnelling ‘82, London, Inst Min Metall, p 73–81 Cassinelli F, Cina S, Innaurato N, Mancini R, Sampaolo A (1982) Power consumption and metal wear in tunnel-boring machines: analysis of tunnel boring operation in hard rock. In: Tunnelling ‘82, London, Inst Min Metall, p 73–81
Zurück zum Zitat Cramer NL (1985) A representation for the adaptive generation of simple sequential programs. In: Grefenstette JJ (ed) Proceedings of the first international conference on genetic algorithms and their applications. Erlbaum Cramer NL (1985) A representation for the adaptive generation of simple sequential programs. In: Grefenstette JJ (ed) Proceedings of the first international conference on genetic algorithms and their applications. Erlbaum
Zurück zum Zitat Davis JC (2002) Statistics and data analysis in geology, 3rd edn. Wiley, New York p, p 638 Davis JC (2002) Statistics and data analysis in geology, 3rd edn. Wiley, New York p, p 638
Zurück zum Zitat Delisio A, Zhao J (2014) A new model for TBM performance in blocky rock conditions. Int J Tunn Undergr Space Technol 43:440–452CrossRef Delisio A, Zhao J (2014) A new model for TBM performance in blocky rock conditions. Int J Tunn Undergr Space Technol 43:440–452CrossRef
Zurück zum Zitat Faradonbeh RS, Salimi A, Monjezi M, Ebrahimabadi A, Moormann C (2017) Roadheader performance prediction using genetic programming (GP) and gene expression programming (GEP) techniques. Int J Environ Earth Sci. doi:10.1007/s12665-017-6920-2 Faradonbeh RS, Salimi A, Monjezi M, Ebrahimabadi A, Moormann C (2017) Roadheader performance prediction using genetic programming (GP) and gene expression programming (GEP) techniques. Int J Environ Earth Sci. doi:10.​1007/​s12665-017-6920-2
Zurück zum Zitat Fattahi H, Babanouri N (2017) Applying optimized support vector regression models for prediction of tunnel boring machine performance. Int J Geotech Geol Eng. doi:10.1007/s10706-017-0238-4 Fattahi H, Babanouri N (2017) Applying optimized support vector regression models for prediction of tunnel boring machine performance. Int J Geotech Geol Eng. doi:10.​1007/​s10706-017-0238-4
Zurück zum Zitat Gholamnejad J, Tayarani N (2010) Application of artificial neural networks to the prediction of tunnel boring machine penetration rate. Min Sci Technol (China) 20(5):727–733CrossRef Gholamnejad J, Tayarani N (2010) Application of artificial neural networks to the prediction of tunnel boring machine penetration rate. Min Sci Technol (China) 20(5):727–733CrossRef
Zurück zum Zitat Gong QM, Zhao J (2009) Development of a rock mass characteristics model for TBM penetration rate prediction. Int J Rock Mech Min Sci 46(1):8–18CrossRef Gong QM, Zhao J (2009) Development of a rock mass characteristics model for TBM penetration rate prediction. Int J Rock Mech Min Sci 46(1):8–18CrossRef
Zurück zum Zitat Gong QM, Zhao J, Jiao YY (2005) Numerical modeling of the effects of joint orientation on rock fragmentation by TBM cutters. Tunn Undergr Space Technol 20:183–191CrossRef Gong QM, Zhao J, Jiao YY (2005) Numerical modeling of the effects of joint orientation on rock fragmentation by TBM cutters. Tunn Undergr Space Technol 20:183–191CrossRef
Zurück zum Zitat Gong QM, Jiao YY, Zhao J (2006) Numerical simulation of influence of joint spacing on rock fragmentation by TBM cutters. Int J Tunnell Undergr Space Technol 21(1):46–55CrossRef Gong QM, Jiao YY, Zhao J (2006) Numerical simulation of influence of joint spacing on rock fragmentation by TBM cutters. Int J Tunnell Undergr Space Technol 21(1):46–55CrossRef
Zurück zum Zitat Hassanpour J, Rostami J, Khamehchiyan M, Bruland A (2009) Developing new equations for TBM performance prediction in carbonate-argillaceous rocks: a case history of Nowsood water conveyance tunnel. Geomech Geoeng Int J 4:287–297CrossRef Hassanpour J, Rostami J, Khamehchiyan M, Bruland A (2009) Developing new equations for TBM performance prediction in carbonate-argillaceous rocks: a case history of Nowsood water conveyance tunnel. Geomech Geoeng Int J 4:287–297CrossRef
Zurück zum Zitat Hassanpour J, Rostami J, Zhao J (2011) A new hard rock TBM performance prediction model for project planning. Tunn Undergr Space Technol 26:595–603CrossRef Hassanpour J, Rostami J, Zhao J (2011) A new hard rock TBM performance prediction model for project planning. Tunn Undergr Space Technol 26:595–603CrossRef
Zurück zum Zitat Innaurato N, Rondena E, Zaninetti A (1991) Forecasting and effective TBM performance in a rapid excavation of tunnel in Italy. In: Proceedings of the 7th international congress on rock mechanics ISRM. Balkema, Rotterdam. Aachen, Germany, p 1009–1014 Innaurato N, Rondena E, Zaninetti A (1991) Forecasting and effective TBM performance in a rapid excavation of tunnel in Italy. In: Proceedings of the 7th international congress on rock mechanics ISRM. Balkema, Rotterdam. Aachen, Germany, p 1009–1014
Zurück zum Zitat Jain P (2014) Evaluation of engineering geological and geotechnical properties for the performance of a tunnel boring machine in Deccan traps rocks—a case study From Mumbai, India. Ph.D. thesis, Indian Institute of Technology Bombay, India (Unpublished) Jain P (2014) Evaluation of engineering geological and geotechnical properties for the performance of a tunnel boring machine in Deccan traps rocks—a case study From Mumbai, India. Ph.D. thesis, Indian Institute of Technology Bombay, India (Unpublished)
Zurück zum Zitat Jain P, Naithani AK, Singh TN (2014) Performance characteristics of tunnel boring machine in basalt and pyroclastic rocks of Deccan traps—a case study. Int J Rock Mech Geotech Eng 6:36–47CrossRef Jain P, Naithani AK, Singh TN (2014) Performance characteristics of tunnel boring machine in basalt and pyroclastic rocks of Deccan traps—a case study. Int J Rock Mech Geotech Eng 6:36–47CrossRef
Zurück zum Zitat Khademi Hamidi J, Shahriar K, Rezai B, Rostami J (2010) Performance prediction of hard rock TBM using Rock Mass Rating (RMR) system. Tunn Undergr Space Technol 25(4):333–345CrossRef Khademi Hamidi J, Shahriar K, Rezai B, Rostami J (2010) Performance prediction of hard rock TBM using Rock Mass Rating (RMR) system. Tunn Undergr Space Technol 25(4):333–345CrossRef
Zurück zum Zitat Koza JR (1992) Genetic programming: on the programming of computers by means of natural selection. MIT Press, Cambridge Koza JR (1992) Genetic programming: on the programming of computers by means of natural selection. MIT Press, Cambridge
Zurück zum Zitat Lislerud A (1988) Hard rock tunnel boring: prognosis and cost. Tunn Undergr Space Technol 3(1):9–17CrossRef Lislerud A (1988) Hard rock tunnel boring: prognosis and cost. Tunn Undergr Space Technol 3(1):9–17CrossRef
Zurück zum Zitat Mahdevari S, Shahriar K, Yagiz S, Akbarpour Shirazi M (2014) A support vector regression model for predicting tunnel boring machine penetration rates. Int J Rock Mech Min Sci 72:214–229 Mahdevari S, Shahriar K, Yagiz S, Akbarpour Shirazi M (2014) A support vector regression model for predicting tunnel boring machine penetration rates. Int J Rock Mech Min Sci 72:214–229
Zurück zum Zitat Nelson PP (1983) Tunnel boring machine performance in sedimentary rock. Ph.D. thesis, Cornell University, Ithaca, NY Nelson PP (1983) Tunnel boring machine performance in sedimentary rock. Ph.D. thesis, Cornell University, Ithaca, NY
Zurück zum Zitat Nelson P, O’Rourke TD, Kulhawy FH (1983) Factors affecting TBM penetration rates in sedimentary rocks. In: Proceedings, 24th US symposium on rock mechanics, Texas A&M, College Station, TX, p 227–237 Nelson P, O’Rourke TD, Kulhawy FH (1983) Factors affecting TBM penetration rates in sedimentary rocks. In: Proceedings, 24th US symposium on rock mechanics, Texas A&M, College Station, TX, p 227–237
Zurück zum Zitat Ramezanzadeh A (2005) Performance analysis and development of new models for performance prediction of hard rock TBMs in rock mass. Ph.D. thesis, INSA, Lyon, France Ramezanzadeh A (2005) Performance analysis and development of new models for performance prediction of hard rock TBMs in rock mass. Ph.D. thesis, INSA, Lyon, France
Zurück zum Zitat Rostami J (1997) Development of a force estimation model for rock fragmentation with disc cutters through theoretical modeling and physical measurement of crushed zone pressure. Ph.D. thesis, Colorado School of Mines, Golden, Colorado, USA Rostami J (1997) Development of a force estimation model for rock fragmentation with disc cutters through theoretical modeling and physical measurement of crushed zone pressure. Ph.D. thesis, Colorado School of Mines, Golden, Colorado, USA
Zurück zum Zitat Rostami J, Ozdemir L, Nilsen B (1996) Comparison between CSM and NTH hard rock TBM performance prediction models. In: Proceedings, the annual conference of the institution of shaft drilling technology (ISDT), Las Vegas Rostami J, Ozdemir L, Nilsen B (1996) Comparison between CSM and NTH hard rock TBM performance prediction models. In: Proceedings, the annual conference of the institution of shaft drilling technology (ISDT), Las Vegas
Zurück zum Zitat Salimi A, Faradonbeh RS, Monjezi M, Moormann C (2016a) TBM performance estimation using a classification and regression tree (CART) technique. Int J Bull Eng Geol Environ. doi:10.1007/s10064-016-0969-0 Salimi A, Faradonbeh RS, Monjezi M, Moormann C (2016a) TBM performance estimation using a classification and regression tree (CART) technique. Int J Bull Eng Geol Environ. doi:10.​1007/​s10064-016-0969-0
Zurück zum Zitat Salimi A, Rostami J, Moormann C, Delisio A (2016b) Application of non-linear regression analysis and artificial intelligence algorithms for performance prediction of hard rock TBMs. Int J Tunn Undergr Space Technol 58:236–246CrossRef Salimi A, Rostami J, Moormann C, Delisio A (2016b) Application of non-linear regression analysis and artificial intelligence algorithms for performance prediction of hard rock TBMs. Int J Tunn Undergr Space Technol 58:236–246CrossRef
Zurück zum Zitat Sapigni M, Berti M, Behtaz E, Busillo A, Cardone G (2002) TBM performance estimation using rock mass classification. Int J Rock Mech Min Sci 39:771–788CrossRef Sapigni M, Berti M, Behtaz E, Busillo A, Cardone G (2002) TBM performance estimation using rock mass classification. Int J Rock Mech Min Sci 39:771–788CrossRef
Zurück zum Zitat Sharma LK, Singh TN (2017) Regression based models for the prediction of unconfined compressive strength of artificially structured soil. Int J Eng Comput. doi:10.1007/s00366-017-0528-8 Sharma LK, Singh TN (2017) Regression based models for the prediction of unconfined compressive strength of artificially structured soil. Int J Eng Comput. doi:10.​1007/​s00366-017-0528-8
Zurück zum Zitat Silva S, Almeida J (2003) GPLAB, a genetic programming tool box for MATLAB. In: Proceeding from the Nordic MATLAB conference, Copenhagen, Denmark, pp 273–278 Silva S, Almeida J (2003) GPLAB, a genetic programming tool box for MATLAB. In: Proceeding from the Nordic MATLAB conference, Copenhagen, Denmark, pp 273–278
Zurück zum Zitat Singh R, Kumar Umrao R, Ahmad M, Ansari MK, Sharma LK, Singh TN (2017) Prediction of geomechanical parameters using soft computing and multiple regression approach. Int J Meas 99:108–119CrossRef Singh R, Kumar Umrao R, Ahmad M, Ansari MK, Sharma LK, Singh TN (2017) Prediction of geomechanical parameters using soft computing and multiple regression approach. Int J Meas 99:108–119CrossRef
Zurück zum Zitat Thuro K, Plinninger RJ (2003) Hard rock tunnel boring, cutting, drilling and blasting: rock parameters for excavatability. ISRM 2003-technology roadmap for rock mechanics, South African Institute of Mining and Metallurgy, p 1–7 Thuro K, Plinninger RJ (2003) Hard rock tunnel boring, cutting, drilling and blasting: rock parameters for excavatability. ISRM 2003-technology roadmap for rock mechanics, South African Institute of Mining and Metallurgy, p 1–7
Zurück zum Zitat Tonnizam Mohamad E, Faradonbeh RS, Armaghani DJ, Monjezi M, Abd Majid MZ (2016) An optimized ANN model based on genetic algorithm for predicting ripping production. Int J Neural Comput Appl. doi:10.1007/s00521-016-2359-8 Tonnizam Mohamad E, Faradonbeh RS, Armaghani DJ, Monjezi M, Abd Majid MZ (2016) An optimized ANN model based on genetic algorithm for predicting ripping production. Int J Neural Comput Appl. doi:10.​1007/​s00521-016-2359-8
Zurück zum Zitat von Preinl ZTB, Celada Tamames B, Galera Fernandez JM, Alvarez Hernandez M (2006) Rock masse excavability indicator: new way to selecting the optimum tunnel construction method. Tunn Undergr Space Technol 21(3–4):237CrossRef von Preinl ZTB, Celada Tamames B, Galera Fernandez JM, Alvarez Hernandez M (2006) Rock masse excavability indicator: new way to selecting the optimum tunnel construction method. Tunn Undergr Space Technol 21(3–4):237CrossRef
Zurück zum Zitat Yagiz S (2002) Development of rock fracture and brittleness indices to quantify the effects of rock mass features and toughness in the CSM Model basic penetration for hard rock tunneling machines. Ph.D. thesis, Department of Mining and Earth Systems Engineering, Colorado School of Mines, Golden, Colorado, USA Yagiz S (2002) Development of rock fracture and brittleness indices to quantify the effects of rock mass features and toughness in the CSM Model basic penetration for hard rock tunneling machines. Ph.D. thesis, Department of Mining and Earth Systems Engineering, Colorado School of Mines, Golden, Colorado, USA
Zurück zum Zitat Yagiz S (2008) Utilizing rock mass properties for predicting TBM performance in hard rock condition. Tunn Undergr Space Technol 23(3):326–339CrossRef Yagiz S (2008) Utilizing rock mass properties for predicting TBM performance in hard rock condition. Tunn Undergr Space Technol 23(3):326–339CrossRef
Zurück zum Zitat Yagiz S, Karahan H (2011) Prediction of hard rock TBM penetration rate using particle swarm optimization. Int J Rock Mech Min Sci 48:427–433CrossRef Yagiz S, Karahan H (2011) Prediction of hard rock TBM penetration rate using particle swarm optimization. Int J Rock Mech Min Sci 48:427–433CrossRef
Metadaten
Titel
Examining Feasibility of Developing a Rock Mass Classification for Hard Rock TBM Application Using Non-linear Regression, Regression Tree and Generic Programming
verfasst von
A. Salimi
J. Rostami
C. Moormann
J. Hassanpour
Publikationsdatum
09.10.2017
Verlag
Springer International Publishing
Erschienen in
Geotechnical and Geological Engineering / Ausgabe 2/2018
Print ISSN: 0960-3182
Elektronische ISSN: 1573-1529
DOI
https://doi.org/10.1007/s10706-017-0380-z

Weitere Artikel der Ausgabe 2/2018

Geotechnical and Geological Engineering 2/2018 Zur Ausgabe