Skip to main content

2023 | OriginalPaper | Buchkapitel

Improvement in Productivity of Assembly Line by Cycle Time Reduction: A Case Study

verfasst von : Devanshi Vaghela, Hari Vasudevan, Rajendra Khavekar

Erschienen in: Proceedings of International Conference on Intelligent Manufacturing and Automation

Verlag: Springer Nature Singapore

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

This study was undertaken in a biomedical equipment manufacturing organization, situated in Mumbai, so as to improve the assembly process using various ways to reduce cycle time as well as by applying other productivity-oriented methodologies. The primary motive was to generate a lean solution and calculate the value added to the overall production. Installation of automated tools in order to enhance the cycle time reduction of subassemblies, gathering individual worker efficiency data, and usage of jigs in photometer assemblies was involved in the study. After this study, total cycle time was reduced from 52 h per machine to 43.3 h per machine approximately. The organization achieved a saving of Rs. 3.2 LPA and also more number of machines were delivered to the markets per year.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Giridhar Kamath B, Pai R, Hebbar S, Rao V (2013) Process improvement in manufacturing industries: a system dynamics perspective. Int J Mech Prod Eng 1(4):33–36 Giridhar Kamath B, Pai R, Hebbar S, Rao V (2013) Process improvement in manufacturing industries: a system dynamics perspective. Int J Mech Prod Eng 1(4):33–36
2.
Zurück zum Zitat Angelini C (2019) Regression analysis. Encyclop Bioinform Comput Biol 1:722–730 Angelini C (2019) Regression analysis. Encyclop Bioinform Comput Biol 1:722–730
3.
Zurück zum Zitat Kumar V, Dip Gill K (2018) Photometry: colorimeter and spectrophotometer, basic concepts in clinical biochemistry: a practical guide Kumar V, Dip Gill K (2018) Photometry: colorimeter and spectrophotometer, basic concepts in clinical biochemistry: a practical guide
4.
Zurück zum Zitat Christopher M (1998) Logistics and supply chain management: strategies for reducing cost and improving service, 2nd edn. Financial Times Prentice-Hall, United Kingdom Christopher M (1998) Logistics and supply chain management: strategies for reducing cost and improving service, 2nd edn. Financial Times Prentice-Hall, United Kingdom
5.
Zurück zum Zitat Kalyanasundaram H, Amuthuselvan D, Chidambara Raja S, Sundarraja S (2012) Improving productivity of manufacturing division using lean concepts and development of material gravity feeder—a case study. Int J Lean Think 3(2):117–134 Kalyanasundaram H, Amuthuselvan D, Chidambara Raja S, Sundarraja S (2012) Improving productivity of manufacturing division using lean concepts and development of material gravity feeder—a case study. Int J Lean Think 3(2):117–134
6.
Zurück zum Zitat Kulkarni PP, Kshire SS, Chandratre KV (2014) Productivity Improvement through lean deployment and work study methods. Int J Res Eng Technol 3(2):429–434 Kulkarni PP, Kshire SS, Chandratre KV (2014) Productivity Improvement through lean deployment and work study methods. Int J Res Eng Technol 3(2):429–434
7.
Zurück zum Zitat Kaur M, Kiran R (2008) Indian manufacturing sector: growth and productivity under the new policy regime. Int Rev Bus Res Pap 4(2):136–150 Kaur M, Kiran R (2008) Indian manufacturing sector: growth and productivity under the new policy regime. Int Rev Bus Res Pap 4(2):136–150
8.
Zurück zum Zitat Vasudevan H, Khavekar R, Syed N (2020) Productivity improvement in blow molding process through energy savings. Lecture Notes in Mechanical Engineering, Springer Singapore, pp 167–176 Vasudevan H, Khavekar R, Syed N (2020) Productivity improvement in blow molding process through energy savings. Lecture Notes in Mechanical Engineering, Springer Singapore, pp 167–176
9.
Zurück zum Zitat Singh S, Singh S (2016) Productivity improvement: implementation and analysis of clustering technique in manufacturing of timing gearbox cover. Manage Sci Lett 6:315–324CrossRef Singh S, Singh S (2016) Productivity improvement: implementation and analysis of clustering technique in manufacturing of timing gearbox cover. Manage Sci Lett 6:315–324CrossRef
10.
Zurück zum Zitat Sheth JN, Sisodia RS (2002) Marketing productivity: issues and analysis. J Bus Res 55(5):349–362CrossRef Sheth JN, Sisodia RS (2002) Marketing productivity: issues and analysis. J Bus Res 55(5):349–362CrossRef
Metadaten
Titel
Improvement in Productivity of Assembly Line by Cycle Time Reduction: A Case Study
verfasst von
Devanshi Vaghela
Hari Vasudevan
Rajendra Khavekar
Copyright-Jahr
2023
Verlag
Springer Nature Singapore
DOI
https://doi.org/10.1007/978-981-19-7971-2_4

    Premium Partner