Skip to main content
Erschienen in:
Buchtitelbild

2021 | OriginalPaper | Buchkapitel

1. Introduction

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

This chapter introduces the history, operational objectives and practical challenges of the NERC’s Reliability Coordinator(s) responsible for the Western Interconnection. It provides an overview on both creation process and implementation experience of the West-wide System Model (WSM), advanced EMS applications and other real-time analytical tools running with the WSM and using real-time measurements. The metrics of the WSM improvements and advanced EMS Network Applications performance in reality are covered in the chapter.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literatur
5.
Zurück zum Zitat Zhang, H., & Wangen, B. (2012, July 22–26). Implementation of a full western bulk system operational model for reliability monitoring. Proceedings of IEEE PES General Meeting. Zhang, H., & Wangen, B. (2012, July 22–26). Implementation of a full western bulk system operational model for reliability monitoring. Proceedings of IEEE PES General Meeting.
6.
Zurück zum Zitat Wangen, B., & Zhang, H. (2012, July 22–26). Monitoring for post-contingency system operating limit exceedance in the Western Interconnection. Proceedings of IEEE PES General Meeting. Wangen, B., & Zhang, H. (2012, July 22–26). Monitoring for post-contingency system operating limit exceedance in the Western Interconnection. Proceedings of IEEE PES General Meeting.
8.
Zurück zum Zitat Zhang, H., Vaiman, M. et al. (2019, August 5–8). Implementing the Real-Tune voltage stability analysis tool on a large scale system model for IROL assessment in the Western Interconnection. Proceedings of IEEE PES General Meeting. Zhang, H., Vaiman, M. et al. (2019, August 5–8). Implementing the Real-Tune voltage stability analysis tool on a large scale system model for IROL assessment in the Western Interconnection. Proceedings of IEEE PES General Meeting.
9.
Zurück zum Zitat Mahmoudi, M., Kincic, S., Zhang, H., & Tomsovic, K. (2017). Implementation and testing of remedial action schemes for Real-Time transient stability studies. PES General Meeting. Mahmoudi, M., Kincic, S., Zhang, H., & Tomsovic, K. (2017). Implementation and testing of remedial action schemes for Real-Time transient stability studies. PES General Meeting.
10.
Zurück zum Zitat Mahmoudi, M., Kincic, S., Zhang, H., & Tomsovic, K. (2018). Model enhancements for Real-time transient stability assessment in western interconnection. T&D conference 2018 Denver, CO Mahmoudi, M., Kincic, S., Zhang, H., & Tomsovic, K. (2018). Model enhancements for Real-time transient stability assessment in western interconnection. T&D conference 2018 Denver, CO
Metadaten
Titel
Introduction
verfasst von
Hongming Zhang
Copyright-Jahr
2021
DOI
https://doi.org/10.1007/978-3-030-44544-7_1