Skip to main content
Erschienen in: The International Journal of Life Cycle Assessment 8/2015

01.08.2015 | LCI METHODOLOGY AND DATABASES

Life cycle inventory processes of the integrated steel plant (ISP) in Krakow, Poland—coke production, a case study

verfasst von: Boguslaw Bieda, Katarzyna Grzesik, Dariusz Sala, Bartłomiej Gaweł

Erschienen in: The International Journal of Life Cycle Assessment | Ausgabe 8/2015

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

Purpose

The goal of this paper is to describe the life cycle inventory (LCI) approach to the cokemaking process in the Integrated Steel Plant’s Coke Oven Battery (ISPCOB) in Kraków, Poland. The system boundaries were labeled as gate-to-gate, covering the full chain process of coke production. The background input and output data from the coke production process (CPP) has been inventoried.

Methods

The functional unit (FU) was produced of 1 Mg of the coke in ISPCOB. The following inputs and outputs have been taken into account in the LCI study: product (coke), all intermediate products, by-products, and emissions. Raw fuel mining and means of external transportation of natural gas, manufacture of downstream products, their use, end of life, and infrastructure were not included. Time coverage is 2004, because since 2005, robust inventory data coverage of full ISP coke processes are lacking. Data used for inventory calculation are affected by uncertainty.

Results and discussion

With regard to 1 Mg of coke produced in ISPCOB in 2004, the consumption of coke coal and coke oven gas amounted to 1.35 Mg and 195 m3, respectively. The main materials, fuels, and energy used for the coke production were electric energy, steam, air, heat, and industrial water. Emissions of SO2, NO2, CO, CO2, NH3, aliphatic hydrocarbons, HCN, H2S, CS2, benzene, xylene, toluene, phenol, pyridine, dust, tar matters, Cr, Cd, Cu, Pb, Ni, and Mn have been considered.

Conclusions

The data for the LCI have been based on the year 2004. Uncertainty assessment in LCI is discussed. The purpose of this study is to help ISP authorities to solve environmental and technical aspects, as well as to train steel industry people in the field of life cycle assessment. Finally, presented LCI study for ISPCOB can serve as a representative data for LCA analysis of coke production in coke plants.

Recommendations

The impact assessment phase aims to present more understandable results from the inventory analysis, and life cycle impact assessment (LCIA) will be the direction for future research.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literatur
Zurück zum Zitat Barella S, Bondi E, Di Cecca C, Ciuffini AF, Gruttadauria A, Mapelli C, Mombelli D (2014) New perspective in steelmaking activity to increase competitiveness and reduce environmental impact. La Metallurgia Italiana n.11-12:31–40 Barella S, Bondi E, Di Cecca C, Ciuffini AF, Gruttadauria A, Mapelli C, Mombelli D (2014) New perspective in steelmaking activity to increase competitiveness and reduce environmental impact. La Metallurgia Italiana n.11-12:31–40
Zurück zum Zitat Bieda B (2011) Life cycle inventory of energy production in ArcelorMittal steel power plant Poland S.A. in Krakow, Poland. Int J Life Cycle Assess 16:503–511CrossRef Bieda B (2011) Life cycle inventory of energy production in ArcelorMittal steel power plant Poland S.A. in Krakow, Poland. Int J Life Cycle Assess 16:503–511CrossRef
Zurück zum Zitat Bieda B (2012a) Life cycle inventory processes of the ArcelorMittal Poland (AMP) S. A. in Kraków, Poland – basic oxygen furnace steel production: a case study. Int J Life Cycle Assess 17(4):463–470CrossRef Bieda B (2012a) Life cycle inventory processes of the ArcelorMittal Poland (AMP) S. A. in Kraków, Poland – basic oxygen furnace steel production: a case study. Int J Life Cycle Assess 17(4):463–470CrossRef
Zurück zum Zitat Bieda B (2012b) Life cycle inventory processes of the Mittal Steel Poland (MSP) S. A. in Krakow – blast furnace pig iron production – a case study. Int J Life Cycle Assess 17(6):787–794CrossRef Bieda B (2012b) Life cycle inventory processes of the Mittal Steel Poland (MSP) S. A. in Krakow – blast furnace pig iron production – a case study. Int J Life Cycle Assess 17(6):787–794CrossRef
Zurück zum Zitat Bieda B, Tadeusiewicz R (2005) Optimal schemes of groundwater monitoring for prevention of contaminated water intrusion in the Ispat Polska Stal S.A. in Krakow, Poland. Water resources management III, third international conference on Water resources management, eds. M. de Conçeicao Cunha, C. A. Brebbia. Southampton, Boston, WIT Press, 2005 (WIT Transactions on Ecology and the Environment. Vol. 80:69–77 Bieda B, Tadeusiewicz R (2005) Optimal schemes of groundwater monitoring for prevention of contaminated water intrusion in the Ispat Polska Stal S.A. in Krakow, Poland. Water resources management III, third international conference on Water resources management, eds. M. de Conçeicao Cunha, C. A. Brebbia. Southampton, Boston, WIT Press, 2005 (WIT Transactions on Ecology and the Environment. Vol. 80:69–77
Zurück zum Zitat Burchart-Korol D (2013) Life cycle assessment of steel production in Poland: a case study. J Clean Prod 54:235–243CrossRef Burchart-Korol D (2013) Life cycle assessment of steel production in Poland: a case study. J Clean Prod 54:235–243CrossRef
Zurück zum Zitat Clavreul J, Guyonnet D, Tonini D, Christensen TH (2013) Stochastic and epistemic uncertainty propagation in LCA. Int J Life Cycle Assess 18(7):1393–1403CrossRef Clavreul J, Guyonnet D, Tonini D, Christensen TH (2013) Stochastic and epistemic uncertainty propagation in LCA. Int J Life Cycle Assess 18(7):1393–1403CrossRef
Zurück zum Zitat Commission E (2009) Integrated pollution prevention and control. Draft reference document on best available techniques for the production of iron and steel. Institute for Prospective Technological Studies, Seville Commission E (2009) Integrated pollution prevention and control. Draft reference document on best available techniques for the production of iron and steel. Institute for Prospective Technological Studies, Seville
Zurück zum Zitat DECC (2010) Coal trade and production statistics. Digest of UK energy statistics. Department of Energy and Climate Change, London DECC (2010) Coal trade and production statistics. Digest of UK energy statistics. Department of Energy and Climate Change, London
Zurück zum Zitat Finnveden G, Hauschild MZ, Ekvall T, Guinée J, Heijungs R, Hellweg S, Koehler A, Pennington D, Suh S (2009) Recent development in life cycle assessment. J Environ Manag 91(1):1–21CrossRef Finnveden G, Hauschild MZ, Ekvall T, Guinée J, Heijungs R, Hellweg S, Koehler A, Pennington D, Suh S (2009) Recent development in life cycle assessment. J Environ Manag 91(1):1–21CrossRef
Zurück zum Zitat Hunkeler D, Rebitzer G (2005) Editorial: the future of life cycle assessment. Int J Life Cycle Assess 10(5):305–307CrossRef Hunkeler D, Rebitzer G (2005) Editorial: the future of life cycle assessment. Int J Life Cycle Assess 10(5):305–307CrossRef
Zurück zum Zitat Iosif A-M, Hanrot F, Birat J-P, Ablitzer D (2010) Physicochemical modelling of classical steelmaking route for life cycle inventory analysis. Int J Life Cycle Assess 15:304–310CrossRef Iosif A-M, Hanrot F, Birat J-P, Ablitzer D (2010) Physicochemical modelling of classical steelmaking route for life cycle inventory analysis. Int J Life Cycle Assess 15:304–310CrossRef
Zurück zum Zitat ISO 14040 (2006) Environmental management – life cycle assessment – principles and framework. International Organization for Standarization, Geneva ISO 14040 (2006) Environmental management – life cycle assessment – principles and framework. International Organization for Standarization, Geneva
Zurück zum Zitat ISO 14041 (2006) Environmental management – life cycle assessment – goal and scope definition and inventory analysis. International Organization for Standarization, Geneva ISO 14041 (2006) Environmental management – life cycle assessment – goal and scope definition and inventory analysis. International Organization for Standarization, Geneva
Zurück zum Zitat ISO 14044 (2006) Environmental management – life cycle assessment – requirements and guidelines. International Organization for Standarization, Geneva ISO 14044 (2006) Environmental management – life cycle assessment – requirements and guidelines. International Organization for Standarization, Geneva
Zurück zum Zitat Jarno L (2005) Rola Jastrzębskiej Spółki Węglowej S.A. w tworzeniu Grupy Węglowo-Koksowej. POLITYKA ENERGETYCZNA 8(Zeszyt specjalny):613–621, Polish Jarno L (2005) Rola Jastrzębskiej Spółki Węglowej S.A. w tworzeniu Grupy Węglowo-Koksowej. POLITYKA ENERGETYCZNA 8(Zeszyt specjalny):613–621, Polish
Zurück zum Zitat Kim YM, Park D, Lee DS, Park JM (2007) Instability of biological nitrogen removal in a cokes wastewater treatment facility during summer. J Hazard Mater 141:27–32CrossRef Kim YM, Park D, Lee DS, Park JM (2007) Instability of biological nitrogen removal in a cokes wastewater treatment facility during summer. J Hazard Mater 141:27–32CrossRef
Zurück zum Zitat Kim YM, Park D, Jeon CO, Lee DS, Park JM (2008) Effect of HRT on the biological pre-denitrifaction process for simultaneous removal of toxic pollutants from cokes wastewater. Bioresour Technol 99:8824–8832CrossRef Kim YM, Park D, Jeon CO, Lee DS, Park JM (2008) Effect of HRT on the biological pre-denitrifaction process for simultaneous removal of toxic pollutants from cokes wastewater. Bioresour Technol 99:8824–8832CrossRef
Zurück zum Zitat Klejnowski K, Łusiak T, Morel J, Olczak C, Sobolewski A, Ściążko M, Tatara T (2005) The Best Available Techniques (BAT) Guidelines for the coking industry. The Ministry of Environment. Warszawa, December 2005. (Polish: NAJLEPSZE DOSTĘPNE TECHNIKI (BAT) WYTYCZNE DLA BRANŻY KOKSOWNICZEJ (2005) Ministerstwo Środowiska Warszawa, grudzień 2005) Klejnowski K, Łusiak T, Morel J, Olczak C, Sobolewski A, Ściążko M, Tatara T (2005) The Best Available Techniques (BAT) Guidelines for the coking industry. The Ministry of Environment. Warszawa, December 2005. (Polish: NAJLEPSZE DOSTĘPNE TECHNIKI (BAT) WYTYCZNE DLA BRANŻY KOKSOWNICZEJ (2005) Ministerstwo Środowiska Warszawa, grudzień 2005)
Zurück zum Zitat Klüppel HJ (1998) ISO 14041: environmental management – life cycle assessment – goal and scope definition - inventory analysis. Int J Life Cycle Assess 3(6):301CrossRef Klüppel HJ (1998) ISO 14041: environmental management – life cycle assessment – goal and scope definition - inventory analysis. Int J Life Cycle Assess 3(6):301CrossRef
Zurück zum Zitat Kosyrczyk L, Świeboda B, Lewandowski L (2012) Co nowego w chińskim koksownictwie (2012). KARBO 4:216–221 Kosyrczyk L, Świeboda B, Lewandowski L (2012) Co nowego w chińskim koksownictwie (2012). KARBO 4:216–221
Zurück zum Zitat Kulczycka J, Henclik (2009) Ocena wpływu cyklu życia procesów wytwórczych na Wydziałach Surowcowych i Wytwarzania Stali Huty ArcelorMittal Poland SA, Oddział w Krakowie, Polish Akademy of Sciences, Krakow (in Polish) Kulczycka J, Henclik (2009) Ocena wpływu cyklu życia procesów wytwórczych na Wydziałach Surowcowych i Wytwarzania Stali Huty ArcelorMittal Poland SA, Oddział w Krakowie, Polish Akademy of Sciences, Krakow (in Polish)
Zurück zum Zitat Kulczycka J, Kurczewski P, Kasprzak J, Lewandowska A, Lewicki R, Witczak A, Witczak J (2011) The polish centre for life cycle assssment-the centre for life cycle assessment in Poland. Int J Life Cycle Assess 16:442–444CrossRef Kulczycka J, Kurczewski P, Kasprzak J, Lewandowska A, Lewicki R, Witczak A, Witczak J (2011) The polish centre for life cycle assssment-the centre for life cycle assessment in Poland. Int J Life Cycle Assess 16:442–444CrossRef
Zurück zum Zitat Kumar MS, Vaidya AN, Shivaraman N, Bal AS (2003) Performance evaluation of a full-scale coke oven waste water treatment plant in an integrated steel plant. Ind J Environ Health 45:29–38 Kumar MS, Vaidya AN, Shivaraman N, Bal AS (2003) Performance evaluation of a full-scale coke oven waste water treatment plant in an integrated steel plant. Ind J Environ Health 45:29–38
Zurück zum Zitat Lindfors LG, Christiansen K, Hoffman L, Virtanen Y, Juntilla V, Hanssen OJ, Rønning A, Ekvall T, Finnvenden G (1995) Nordic guidelines on life-cycle assessment, Nird 1995: 20, Nordic Council of Ministers, Copenhagen Marañόn E, Vázquez I, Rodríguez J, Castrillόn L, Fernández Y, Lόpez H (2008) Treatment of coke wastewater in a sequential batch reactor (SBR) at pilot plant scale. Bioresour Technol 99:4192–4198 Lindfors LG, Christiansen K, Hoffman L, Virtanen Y, Juntilla V, Hanssen OJ, Rønning A, Ekvall T, Finnvenden G (1995) Nordic guidelines on life-cycle assessment, Nird 1995: 20, Nordic Council of Ministers, Copenhagen Marañόn E, Vázquez I, Rodríguez J, Castrillόn L, Fernández Y, Lόpez H (2008) Treatment of coke wastewater in a sequential batch reactor (SBR) at pilot plant scale. Bioresour Technol 99:4192–4198
Zurück zum Zitat Marañόn E, Vázquez I, Rodríguez J, Castrillόn L, Fernández Y, Lόpez H (2008) Treatment of coke wastewater in a sequential batch reactor (SBR) at pilot plant scale. Bioresour Technol 99:4192–4198CrossRef Marañόn E, Vázquez I, Rodríguez J, Castrillόn L, Fernández Y, Lόpez H (2008) Treatment of coke wastewater in a sequential batch reactor (SBR) at pilot plant scale. Bioresour Technol 99:4192–4198CrossRef
Zurück zum Zitat Mazur M, Gruszczyński S, Bergier T, Bogacki M, Grzesik K, Oleniacz R, Szczygłowski P, Wszołek T, Wszołek W, Ciesielka W, Litwa P, Kłaczyński M (2006) Wniosek o wydanie pozwolenia zintegrowanego dla Instalacji Mittal Steel Poland S.A. Oddział w Krakowie – Streszczenie (w języku niespecjalistycznym), Kraków, 2006 (in Polish) Mazur M, Gruszczyński S, Bergier T, Bogacki M, Grzesik K, Oleniacz R, Szczygłowski P, Wszołek T, Wszołek W, Ciesielka W, Litwa P, Kłaczyński M (2006) Wniosek o wydanie pozwolenia zintegrowanego dla Instalacji Mittal Steel Poland S.A. Oddział w Krakowie – Streszczenie (w języku niespecjalistycznym), Kraków, 2006 (in Polish)
Zurück zum Zitat McKenna RC, Norman JB (2010) Spatial modeling of industrial heat loads and recovery potentials in the UK. Energy Policy 38(10):5878–5891CrossRef McKenna RC, Norman JB (2010) Spatial modeling of industrial heat loads and recovery potentials in the UK. Energy Policy 38(10):5878–5891CrossRef
Zurück zum Zitat Ministry of Industry and Information Technology of P.R. China (2010) Program of promoting the implementation of coke dry quenching technology in iron & steel industry nd coking industry Ministry of Industry and Information Technology of P.R. China (2010) Program of promoting the implementation of coke dry quenching technology in iron & steel industry nd coking industry
Zurück zum Zitat Mittal Steel Poland (2007) Environmental Impact Report (in Polish) Mittal Steel Poland (2007) Environmental Impact Report (in Polish)
Zurück zum Zitat Nichol L (2012) Advancing cleaner coke production Nichol L (2012) Advancing cleaner coke production
Zurück zum Zitat Park D, Lee DS, Kim YM, Park JM (2007) Bioaugmentation of cyanide-degrading microorganisms in a full-scale Cowes wastewater treatment facility. Bioresour Technol 99:2092–2096CrossRef Park D, Lee DS, Kim YM, Park JM (2007) Bioaugmentation of cyanide-degrading microorganisms in a full-scale Cowes wastewater treatment facility. Bioresour Technol 99:2092–2096CrossRef
Zurück zum Zitat PE International (2010) GaBi 4.4 Software and databases, Leinfelden-echterdingen, Germany PE International (2010) GaBi 4.4 Software and databases, Leinfelden-echterdingen, Germany
Zurück zum Zitat Polenske KR, McMichael FC (2002) A Chinese cokemaking process-flow model for energy and environmental analyses. Energy Policy 30:865–883CrossRef Polenske KR, McMichael FC (2002) A Chinese cokemaking process-flow model for energy and environmental analyses. Energy Policy 30:865–883CrossRef
Zurück zum Zitat Sonnemann G. Castells F, Schumacher M (2004) Integrated life-cycle and risk assessment for industrial processes. Lewis Publishers. A CRC Press Company Sonnemann G. Castells F, Schumacher M (2004) Integrated life-cycle and risk assessment for industrial processes. Lewis Publishers. A CRC Press Company
Zurück zum Zitat Staib C, Lant P (2007) Thiocyanate degradation during activated sludge treatment of coke-ovens wastewater. Biochem Eng J 34:122–130CrossRef Staib C, Lant P (2007) Thiocyanate degradation during activated sludge treatment of coke-ovens wastewater. Biochem Eng J 34:122–130CrossRef
Zurück zum Zitat Udo de Haes HA, Heijungs R, Suh S, Huppes G (2004) Three strategies to overcome the limitations of life-cycle assessment. J Ind Ecol 8(3):19–32CrossRef Udo de Haes HA, Heijungs R, Suh S, Huppes G (2004) Three strategies to overcome the limitations of life-cycle assessment. J Ind Ecol 8(3):19–32CrossRef
Zurück zum Zitat Vasko FJ, Newhart DD, Strauss AD (2005) Coal blending models for optimum cokemaking and blast furnace operation. J Oper Res Soc 56:235–243CrossRef Vasko FJ, Newhart DD, Strauss AD (2005) Coal blending models for optimum cokemaking and blast furnace operation. J Oper Res Soc 56:235–243CrossRef
Zurück zum Zitat Walsh C, Thornley P (2012) The environmental impact and economic feasibility of introducing an Organic Rankine Cycle to recover low grade heat during the production of metallurgical coke. J Clean Prod 34:29–37CrossRef Walsh C, Thornley P (2012) The environmental impact and economic feasibility of introducing an Organic Rankine Cycle to recover low grade heat during the production of metallurgical coke. J Clean Prod 34:29–37CrossRef
Zurück zum Zitat Weidema B, Hischier R (2006) Ecoinvent data v2.2, St. Gallen, Switzerland Weidema B, Hischier R (2006) Ecoinvent data v2.2, St. Gallen, Switzerland
Zurück zum Zitat Więcław-Solny L, Krótki A, Tatarczuk A, Wilk A (2012) Zrozumieć process “Carbon Capturage” – badania procesu wychwytu CO2 ze spalin w Programie Strategicznym. Nowa Energia 2(26):183–184 (in Polish) Więcław-Solny L, Krótki A, Tatarczuk A, Wilk A (2012) Zrozumieć process “Carbon Capturage” – badania procesu wychwytu CO2 ze spalin w Programie Strategicznym. Nowa Energia 2(26):183–184 (in Polish)
Zurück zum Zitat Woo SH, Jean CO, Yun Y-S, Choi H, Lee C-S, Lee DS (2009) On-line estimation of key process variables based on kernel partial least squares in an industrial cokes wastewater treatment plant. J Hazard Mater 161:538–544CrossRef Woo SH, Jean CO, Yun Y-S, Choi H, Lee C-S, Lee DS (2009) On-line estimation of key process variables based on kernel partial least squares in an industrial cokes wastewater treatment plant. J Hazard Mater 161:538–544CrossRef
Zurück zum Zitat World Steel Association (2011) Methodology report – life cycle inventory study for steel products, Brussels, Belgium World Steel Association (2011) Methodology report – life cycle inventory study for steel products, Brussels, Belgium
Zurück zum Zitat Xue B, Ma Z, Geng Y, Heck P, Ren W, Tobias M, Maas A, Jiang P, Puppim de Oliveira JA, Fujita T (2015) A life cycle co-benefits assessment of wind power in China. Renew Sust Energ Rev 41:338–346CrossRef Xue B, Ma Z, Geng Y, Heck P, Ren W, Tobias M, Maas A, Jiang P, Puppim de Oliveira JA, Fujita T (2015) A life cycle co-benefits assessment of wind power in China. Renew Sust Energ Rev 41:338–346CrossRef
Zurück zum Zitat Zhang M, Tay JH, Qian Y, Gu XS (1998) Coke plant wastewater treatment by fixed biofilm system for COD and HN3-N removal. Water Res 32:519–527CrossRef Zhang M, Tay JH, Qian Y, Gu XS (1998) Coke plant wastewater treatment by fixed biofilm system for COD and HN3-N removal. Water Res 32:519–527CrossRef
Zurück zum Zitat Zhou X, Li Y, Zhaob Y, Yueb X (2012) Pilot-scale anaerobic/anoxic/oxic/oxic biofilmprocess treating coking wastewater. Wiley Online Libr. doi:10.1002/jctb.3832 Zhou X, Li Y, Zhaob Y, Yueb X (2012) Pilot-scale anaerobic/anoxic/oxic/oxic biofilmprocess treating coking wastewater. Wiley Online Libr. doi:10.​1002/​jctb.​3832
Metadaten
Titel
Life cycle inventory processes of the integrated steel plant (ISP) in Krakow, Poland—coke production, a case study
verfasst von
Boguslaw Bieda
Katarzyna Grzesik
Dariusz Sala
Bartłomiej Gaweł
Publikationsdatum
01.08.2015
Verlag
Springer Berlin Heidelberg
Erschienen in
The International Journal of Life Cycle Assessment / Ausgabe 8/2015
Print ISSN: 0948-3349
Elektronische ISSN: 1614-7502
DOI
https://doi.org/10.1007/s11367-015-0904-9

Weitere Artikel der Ausgabe 8/2015

The International Journal of Life Cycle Assessment 8/2015 Zur Ausgabe