​Due to a varying product demand (changing product mix) and different production speeds, bottlenecks may shift between the stages. In that case, a simultaneous lot-sizing and scheduling of these stages is recommendable. Hence, an improved version of the General Lot-Sizing and Scheduling Problem for Multiple production Stages (GLSPMS) was developed. Moreover, several reformulation techniques were applied to this model to solve it exactly. Besides, a new meta-heuristic which combines the principles of Variable Neighborhood Decomposition Search (VNDS) and Exchange was implemented to find good solutions, even for a real-world problem case. Finally, further model extensions, e.g., for scarce setup resources, were proposed.

Inhaltsverzeichnis

Frontmatter
Chapter 1. Introduction
Abstract
Since the financial crisis in 2009, the global economy has begun growing steadily again. Especially in the emerging markets of Brazil, India, and China, there have been high growth rates in the last few years. As illustrated in Table 1.1, the forecasts (marked with an asterisk) still assume a positive trend in future years.
Florian Seeanner
Chapter 2. Production planning in the consumer packaged goods industry
Abstract
Chapter 1 presented the motivation for the focus of this thesis, which is production planning in the consumer packaged goods industry—more specifically, lot-sizing and scheduling. However, this planning cannot be considered separately, as will be shown in Section 2.1. In fact, the whole supply chain needs to be regarded in order to adequately develop models and methods (cf. Silver et al., 1998, p. 36).
Florian Seeanner
Chapter 3. Multi-level lot-sizing and scheduling
Abstract
As indicated in Section 2.5, today’s Advanced Planning Systems provide sophisticated planning functionality. However, since APS providers are not willing to disclose the used lot-sizing and scheduling models nor the applied solution methods, the planner can barely know how the results are produced.
Florian Seeanner
Chapter 4. Improvements of the GLSPMS
Abstract
In the previous chapter, it became clear that the General Lot-sizing and Scheduling Problem for Multiple Production Stages (GLSPMS) fits best the requirements for solving the problem of shifting bottlenecks in the consumer goods industry. Unfortunately, the GLSPMS shows a few shortcomings which are pinpointed next in the first section. Afterwards an improved formulation resolving these shortcomings will be given in Section 4.2. Finally, the properties of the improved GLSPMS will be discussed and first computational results will be presented in Sections 4.3 and 4.4, respectively.
Florian Seeanner
Chapter 5. Reformulations of the improved GLSPMS
Abstract
Section 4.2 showed that a standard MIP-solver is not able to solve mid-sized instances of the improved GLSPMS to optimality within 1h of runtime. But as mentioned in Chapter 3, the way of formulating a model has impact on the performance of a solver. Accordingly, this chapter which is based on the results presented by Seeanner and Meyr (2013) will examine, whether it is possible to solve the problem instances exactly by “reformulating” the GLSPMS. Hence, Section 5.1 will first explain some general reformulation techniques, before, in particular, selected approaches for lot-sizing and scheduling models will be introduced in Section 5.2. Afterwards, these approaches will be adapted for the GLSPMS in Sections 5.3 and 5.4, respectively.
Florian Seeanner
Chapter 6. Heuristics for the improved GLSPMS
Abstract
Even though the reformulations presented in Chapter 5 provide slightly improved (dual) lower bounds and thus reduce the computational effort of a standard MIP-solver, it is still not possible to solve mid- and large-sized problem instances exactly.
Florian Seeanner
Chapter 7. Extensions of the improved GLSPMS
Abstract
Chapter 2 illustrated the attributes of a flow line production system which might need to be considered by a simultaneous lot-sizing and scheduling. Indeed, the GLSPMS regards most of these attributes and allows hereby solving different problem settings of the consumer packaged goods industry. Despite, there are some important aspects left which are not included in this model so far.
Florian Seeanner
Chapter 8. Summary and Outlook
Abstract
In the consumer packaged goods industry, usually a large number of final items is produced in a two- or three-stage flow line production system with heterogeneous, parallel production lines at each stage. Due to sequence-dependent setup times and costs a simultaneous lotsizing and scheduling of the bottleneck stage is necessary.
Florian Seeanner
Backmatter
Metadaten
Titel
Multi-Stage Simultaneous Lot-Sizing and Scheduling
verfasst von
Florian Seeanner
Copyright-Jahr
2013
Verlag
Springer Fachmedien Wiesbaden
Electronic ISBN
978-3-658-02089-7
Print ISBN
978-3-658-02088-0
DOI
https://doi.org/10.1007/978-3-658-02089-7

Premium Partner