Impacts of risk attitude and outside option on compensation contracts under different information structures

verfasst von: Zhihua Chen, Yanfei Lan, Ruiqing Zhao

Erschienen in: Fuzzy Optimization and Decision Making | Ausgabe 1/2018

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

We consider an agency problem where a firm (she) hires a manager (he) who has related managerial expertise to implement a new project. The manager’s managerial expertise is his private information and characterized as an uncertain variable. The revenue brought about by the project in the future is also assumed to be uncertain. In light of these challenges, this paper investigates the impacts of the manager’s risk attitude and the type-and-effort dependent outside option on the optimal compensation contracts under different information structures. Through developing the manager’s decision criterion based on his risk attitude instead of the expected-utility-maximization criterion, we find that, if the manager is conservative and the outside option’s revenue uncertainty is sufficiently high, the optimal commission rate will be distorted upwards under asymmetric managerial expertise information compared with that under symmetric managerial expertise information. Our analysis also confirms that the existence of a type-and-effort dependent outside option distorts up the compensation structure tailored at a fixed outside option. We further show that, comparing with the setting of a fixed outside option when the manager is aggressive, the presence of a type-and-effort dependent outside option results in a surprising phenomenon that the manager’s private information makes no distortion of the firm’s profit.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Anhänge
Nur mit Berechtigung zugänglich
Literatur
Zurück zum Zitat Bergmann, R., & Friedl, G. (2008). Controlling innovative projects with moral hazard and asymmetric information. Research Policy, 37(9), 1504–1514.CrossRef Bergmann, R., & Friedl, G. (2008). Controlling innovative projects with moral hazard and asymmetric information. Research Policy, 37(9), 1504–1514.CrossRef
Zurück zum Zitat Chao, R. O., Lichtendahl, K. C., & Grushka-Cockayne, Y. (2014). Incentives in a stage-gate process. Production and Operations Management, 23(8), 1286–1298.CrossRef Chao, R. O., Lichtendahl, K. C., & Grushka-Cockayne, Y. (2014). Incentives in a stage-gate process. Production and Operations Management, 23(8), 1286–1298.CrossRef
Zurück zum Zitat Dutta, S. (2003). Capital budgeting and managerial compensation: Incentive and retention effects. The Accounting Review, 78(1), 71–93.CrossRef Dutta, S. (2003). Capital budgeting and managerial compensation: Incentive and retention effects. The Accounting Review, 78(1), 71–93.CrossRef
Zurück zum Zitat Dutta, S. (2008). Managerial expertise, private information, and pay-performance sensitivity. Management Science, 54(3), 429–442.CrossRef Dutta, S. (2008). Managerial expertise, private information, and pay-performance sensitivity. Management Science, 54(3), 429–442.CrossRef
Zurück zum Zitat Ellsberg, D. (1961). Risk, ambiguity, and the savage axioms. Quarterly Journal of Economics, 75(4), 643–669.CrossRefMATH Ellsberg, D. (1961). Risk, ambiguity, and the savage axioms. Quarterly Journal of Economics, 75(4), 643–669.CrossRefMATH
Zurück zum Zitat Goldmanis, M., & Ray, K. (2014). Sorting effects of performance pay. Management Science, 61(2), 335–353.CrossRef Goldmanis, M., & Ray, K. (2014). Sorting effects of performance pay. Management Science, 61(2), 335–353.CrossRef
Zurück zum Zitat He, Z., Li, S., Wei, B., & Yu, J. (2013). Uncertainty, risk, and incentives: Theory and evidence. Management Science, 60(1), 206–226.CrossRef He, Z., Li, S., Wei, B., & Yu, J. (2013). Uncertainty, risk, and incentives: Theory and evidence. Management Science, 60(1), 206–226.CrossRef
Zurück zum Zitat Holmstrom, B., & Milgrom, P. (1987). Aggregation and linearity in the provision of intertemporal incentives. Econometrica, 55(2), 303–328.MathSciNetCrossRefMATH Holmstrom, B., & Milgrom, P. (1987). Aggregation and linearity in the provision of intertemporal incentives. Econometrica, 55(2), 303–328.MathSciNetCrossRefMATH
Zurück zum Zitat Huang, K. W. (2010). A parametric curve analysis for the risk-return tradeoff in an agency problem. Working paper, National University of Singapore. Huang, K. W. (2010). A parametric curve analysis for the risk-return tradeoff in an agency problem. Working paper, National University of Singapore.
Zurück zum Zitat Lan, Y., Zhao, R., & Tang, W. (2014). A fuzzy supply chain contract problem with pricing and warranty. Journal of Intelligent & Fuzzy Systems, 26(3), 1527–1538.MathSciNetMATH Lan, Y., Zhao, R., & Tang, W. (2014). A fuzzy supply chain contract problem with pricing and warranty. Journal of Intelligent & Fuzzy Systems, 26(3), 1527–1538.MathSciNetMATH
Zurück zum Zitat Liu, B. (2007). Uncertainty theory (2nd ed.). Berlin: Springer.MATH Liu, B. (2007). Uncertainty theory (2nd ed.). Berlin: Springer.MATH
Zurück zum Zitat Liu, B. (2009). Some research problems in uncertainty theory. Journal of Uncertain Systems, 3(2), 83–94. Liu, B. (2009). Some research problems in uncertainty theory. Journal of Uncertain Systems, 3(2), 83–94.
Zurück zum Zitat Liu, B. (2013). Extreme value theorems of uncertain process with application to insurance risk model. Soft Computing, 17(4), 549–556.CrossRefMATH Liu, B. (2013). Extreme value theorems of uncertain process with application to insurance risk model. Soft Computing, 17(4), 549–556.CrossRefMATH
Zurück zum Zitat Liu, Y., & Ha, M. (2010). Expected value of function of uncertain variables. Journal of Uncertain Systems, 4(3), 181–186. Liu, Y., & Ha, M. (2010). Expected value of function of uncertain variables. Journal of Uncertain Systems, 4(3), 181–186.
Zurück zum Zitat Liu, Y., Chen, X., & Ralescu, D. A. (2015). Uncertain currency model and currency option pricing. International Journal of Intelligent Systems, 30(1), 40–51.CrossRef Liu, Y., Chen, X., & Ralescu, D. A. (2015). Uncertain currency model and currency option pricing. International Journal of Intelligent Systems, 30(1), 40–51.CrossRef
Zurück zum Zitat Manso, G. (2011). Motivating innovation. The Journal of Finance, 66(5), 1823–1860.CrossRef Manso, G. (2011). Motivating innovation. The Journal of Finance, 66(5), 1823–1860.CrossRef
Zurück zum Zitat Mihm, J. (2010). Incentives in new product development projects and the role of target costing. Management Science, 56(8), 1324–1344.CrossRef Mihm, J. (2010). Incentives in new product development projects and the role of target costing. Management Science, 56(8), 1324–1344.CrossRef
Zurück zum Zitat Mu, R., Lan, Y., & Tang, W. (2013). An uncertain contract model for rural migrant workers employment problems. Fuzzy Optimization and Decision Making, 12(1), 29–39.MathSciNetCrossRef Mu, R., Lan, Y., & Tang, W. (2013). An uncertain contract model for rural migrant workers employment problems. Fuzzy Optimization and Decision Making, 12(1), 29–39.MathSciNetCrossRef
Zurück zum Zitat Prendergast, C. (2002). The tenuous trade-off between risk and incentives. Journal of Political Economy, 110(5), 1071–1102.CrossRef Prendergast, C. (2002). The tenuous trade-off between risk and incentives. Journal of Political Economy, 110(5), 1071–1102.CrossRef
Zurück zum Zitat Wu, X., Zhao, R., & Tang, W. (2014). Uncertain agency models with multi-dimensional incomplete information based on confidence level. Fuzzy Optimization and Decision Making, 13(2), 231–258.MathSciNetCrossRef Wu, X., Zhao, R., & Tang, W. (2014). Uncertain agency models with multi-dimensional incomplete information based on confidence level. Fuzzy Optimization and Decision Making, 13(2), 231–258.MathSciNetCrossRef
Zurück zum Zitat Xiao, W., & Xu, Y. (2012). The impact of royalty contract revision in a multistage strategic R&D alliance. Management Science, 58(12), 2251–2271.CrossRef Xiao, W., & Xu, Y. (2012). The impact of royalty contract revision in a multistage strategic R&D alliance. Management Science, 58(12), 2251–2271.CrossRef
Zurück zum Zitat Yang, K., Zhao, R., & Lan, Y. (2014). The impact of risk attitude in new product development under dual information asymmetry. Computers & Industrial Engineering, 76(10), 122–137.CrossRef Yang, K., Zhao, R., & Lan, Y. (2014). The impact of risk attitude in new product development under dual information asymmetry. Computers & Industrial Engineering, 76(10), 122–137.CrossRef
Zurück zum Zitat Yang, K., Zhao, R., & Lan, Y. (2016). Impacts of uncertain project duration and asymmetric risk sensitivity information in project management. International Transactions in Operational Research, 23(4), 749–774.MathSciNetCrossRefMATH Yang, K., Zhao, R., & Lan, Y. (2016). Impacts of uncertain project duration and asymmetric risk sensitivity information in project management. International Transactions in Operational Research, 23(4), 749–774.MathSciNetCrossRefMATH
Metadaten
Titel
Impacts of risk attitude and outside option on compensation contracts under different information structures
verfasst von
Zhihua Chen
Yanfei Lan
Ruiqing Zhao
Publikationsdatum
26.11.2016
Verlag
Springer US
Erschienen in
Fuzzy Optimization and Decision Making / Ausgabe 1/2018
Print ISSN: 1568-4539
Elektronische ISSN: 1573-2908
DOI
https://doi.org/10.1007/s10700-016-9263-7

Weitere Artikel der Ausgabe 1/2018

Fuzzy Optimization and Decision Making 1/2018 Zur Ausgabe