Skip to main content
Erschienen in: Journal of Combinatorial Optimization 4/2015

01.11.2015

Supply chain scheduling problem in the hospital with periodic working time on a single machine

verfasst von: Jing Fan, Xiwen Lu

Erschienen in: Journal of Combinatorial Optimization | Ausgabe 4/2015

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

The warehouse of a hospital is responsible for wrapping medical materials into packages by a baler and dispatching packages to the departments of the hospital periodically to guarantee the requirements of patients. The manager of the warehouse wants to efficiently utilize the wrapping machine and reduce the times of distributions to decrease logistics cost. If we regard the baler as a single machine and medical materials as jobs, the problem can be summarized as a supply chain scheduling problem integrated with production and delivery. Owing to periodic working time of workers, the machine can be viewed as having periodic maintenance. Because the wrapping interruption of medical materials is not allowed in the hospital, processing of any job is nonresumable. All wrapped packages are dispatched before workers are off duty. This means that each delivery batch is delivered just before each maintenance. Our goal is to minimize sum of the total delivery time and the total delivery cost. We show that the problem is strongly NP-hard and provide a \(2\)-approximation algorithm. Moreover, we propose a branch-and-bound algorithm. Finally we present computational results for some instances generated randomly. Numerical simulation results show that the approximation algorithm performs efficiently.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literatur
Zurück zum Zitat Adiri I, Bruno J, Frostig E, Rinnooy Kan AHG (1989) Single machine flow-time scheduling with a single breakdown. Acta Inf 26:679–696MATHMathSciNetCrossRef Adiri I, Bruno J, Frostig E, Rinnooy Kan AHG (1989) Single machine flow-time scheduling with a single breakdown. Acta Inf 26:679–696MATHMathSciNetCrossRef
Zurück zum Zitat Akturk M, Ghosh J, Gunes E (2003) Scheduling with tool changes to minimize total completion time: a study of heuristics and their performance. Nav Res Log 50:15–30MATHMathSciNetCrossRef Akturk M, Ghosh J, Gunes E (2003) Scheduling with tool changes to minimize total completion time: a study of heuristics and their performance. Nav Res Log 50:15–30MATHMathSciNetCrossRef
Zurück zum Zitat Akturk M, Ghosh J, Gunes E (2004) Scheduling with tool changes to minimize total completion time: basic results and SPT performance. Eur J Oper Res 157:784–790MATHMathSciNetCrossRef Akturk M, Ghosh J, Gunes E (2004) Scheduling with tool changes to minimize total completion time: basic results and SPT performance. Eur J Oper Res 157:784–790MATHMathSciNetCrossRef
Zurück zum Zitat Breit J (2007) Improved approximation for non-preemptive single machine flow-time scheduling with an availability constraint. Eur J Oper Res 183:516–524MATHCrossRef Breit J (2007) Improved approximation for non-preemptive single machine flow-time scheduling with an availability constraint. Eur J Oper Res 183:516–524MATHCrossRef
Zurück zum Zitat Cao M, Zhou H, Kang L (2013) Comparison of domestic and foreign hospital logistics system. China High-Tech Enterp 23:162–163 Cao M, Zhou H, Kang L (2013) Comparison of domestic and foreign hospital logistics system. China High-Tech Enterp 23:162–163
Zurück zum Zitat Chen W (2006) Minimizing total flow time in the single-machine scheduling problem with periodic maintenance. J Oper Res Soc 57:410–415MATHCrossRef Chen W (2006) Minimizing total flow time in the single-machine scheduling problem with periodic maintenance. J Oper Res Soc 57:410–415MATHCrossRef
Zurück zum Zitat Chen W (2007) Minimizing total flow time and maximum tardiness with periodic maintenance. J Qual Maint Eng 13:293–303CrossRef Chen W (2007) Minimizing total flow time and maximum tardiness with periodic maintenance. J Qual Maint Eng 13:293–303CrossRef
Zurück zum Zitat Chen Z (2010) Integrated production and outbound distribution scheduling: review and extensions. Oper Res 58:130–148MATHCrossRef Chen Z (2010) Integrated production and outbound distribution scheduling: review and extensions. Oper Res 58:130–148MATHCrossRef
Zurück zum Zitat Deng W, Wang M, Jiang X (2011) Discussion on logistics management of medical consumables. Chin J Med Instrum 35:389–391 Deng W, Wang M, Jiang X (2011) Discussion on logistics management of medical consumables. Chin J Med Instrum 35:389–391
Zurück zum Zitat DeScioli D (2005) Differentiating the hospital supply chain for enhanced performance. The degree thesis of Massachusetts Institute of Technology DeScioli D (2005) Differentiating the hospital supply chain for enhanced performance. The degree thesis of Massachusetts Institute of Technology
Zurück zum Zitat Fan J, Lu X, Liu P (2015) Integrated scheduling of production and delivery on a single machine with availability constraint. Theor Comput Sci 562:581–589MATHMathSciNetCrossRef Fan J, Lu X, Liu P (2015) Integrated scheduling of production and delivery on a single machine with availability constraint. Theor Comput Sci 562:581–589MATHMathSciNetCrossRef
Zurück zum Zitat Hadidi L, Al-Turki U, Rahim A (2012) Integrated models in production planning and scheduling, maintenance and quality: a review. Int J Ind Syst Eng 10:21–50 Hadidi L, Al-Turki U, Rahim A (2012) Integrated models in production planning and scheduling, maintenance and quality: a review. Int J Ind Syst Eng 10:21–50
Zurück zum Zitat Hu G, Yuan L (2011) Study on inventory control in hospital logistics warehouses. Log Technol 30:150–152 Hu G, Yuan L (2011) Study on inventory control in hospital logistics warehouses. Log Technol 30:150–152
Zurück zum Zitat Kacem I (2009) Approximation algorithms for the makespan minimization with positive tails on a single machine with a fixed non-availablity interval. J Comb Optim 17:117–133MATHMathSciNetCrossRef Kacem I (2009) Approximation algorithms for the makespan minimization with positive tails on a single machine with a fixed non-availablity interval. J Comb Optim 17:117–133MATHMathSciNetCrossRef
Zurück zum Zitat Kachwee M, Hartmann D (2013) Hospital supply chain management and optimisation. In: Proceedings of 2013 SAIIE Kachwee M, Hartmann D (2013) Hospital supply chain management and optimisation. In: Proceedings of 2013 SAIIE
Zurück zum Zitat Lee C (1996) Machine scheduling with an availability constraint. J Glob Optim 9:363–382CrossRef Lee C (1996) Machine scheduling with an availability constraint. J Glob Optim 9:363–382CrossRef
Zurück zum Zitat Liu Y, Zhang P (2009) Ways to promote the development of hospital logistics under new medical reform. China Med Equip 10:1–3 Liu Y, Zhang P (2009) Ways to promote the development of hospital logistics under new medical reform. China Med Equip 10:1–3
Zurück zum Zitat Ma Y, Chu C, Zuo C (2010) A survey of scheduling with deterministic machine availability constraints. Comput Ind Eng 58:199–211CrossRef Ma Y, Chu C, Zuo C (2010) A survey of scheduling with deterministic machine availability constraints. Comput Ind Eng 58:199–211CrossRef
Zurück zum Zitat Qi X (2007) A note on worst-case performance of heuristics for maintenance scheduling problems. Discret Appl Math 155:416–422MATHCrossRef Qi X (2007) A note on worst-case performance of heuristics for maintenance scheduling problems. Discret Appl Math 155:416–422MATHCrossRef
Zurück zum Zitat Qi X, Chen T, Tu F (1999) Scheduling the maintenance on a single machine. J Oper Res Soc 50:1071–1078MATHCrossRef Qi X, Chen T, Tu F (1999) Scheduling the maintenance on a single machine. J Oper Res Soc 50:1071–1078MATHCrossRef
Zurück zum Zitat Sadfi C, Penz B, Rapine C, Blazewicz J, Formanowicz P (2005) An improved approximation algorithm for the single machine total completion time scheduling problem with availability constraints. Eur J Oper Res 161:3–10MATHMathSciNetCrossRef Sadfi C, Penz B, Rapine C, Blazewicz J, Formanowicz P (2005) An improved approximation algorithm for the single machine total completion time scheduling problem with availability constraints. Eur J Oper Res 161:3–10MATHMathSciNetCrossRef
Zurück zum Zitat Wang X, Cheng T (2007) Machine scheduling with an availability constraint and job delivery coordination. Nav Res Log 54:11–20MATHCrossRef Wang X, Cheng T (2007) Machine scheduling with an availability constraint and job delivery coordination. Nav Res Log 54:11–20MATHCrossRef
Zurück zum Zitat Wang X, Wang X, Wang H, Liu D (2012) Management of Consumable logistics in hospitals. Sci Manag 33:123–124MATH Wang X, Wang X, Wang H, Liu D (2012) Management of Consumable logistics in hospitals. Sci Manag 33:123–124MATH
Zurück zum Zitat Wang Y (2011) Management of Chinese medicine logistics. Guide China Med 9:371–373 Wang Y (2011) Management of Chinese medicine logistics. Guide China Med 9:371–373
Zurück zum Zitat Xu D, Xiong S (2012) Minimizing total flow time in the single-machine scheduling problem with periodic maintenance. J Oper Res Soc 63:567CrossRef Xu D, Xiong S (2012) Minimizing total flow time in the single-machine scheduling problem with periodic maintenance. J Oper Res Soc 63:567CrossRef
Metadaten
Titel
Supply chain scheduling problem in the hospital with periodic working time on a single machine
verfasst von
Jing Fan
Xiwen Lu
Publikationsdatum
01.11.2015
Verlag
Springer US
Erschienen in
Journal of Combinatorial Optimization / Ausgabe 4/2015
Print ISSN: 1382-6905
Elektronische ISSN: 1573-2886
DOI
https://doi.org/10.1007/s10878-015-9857-y

Weitere Artikel der Ausgabe 4/2015

Journal of Combinatorial Optimization 4/2015 Zur Ausgabe

Editorial

Preface