2008 | OriginalPaper | Buchkapitel
Project Assets Ontology (PAO) to Support Gap Analysis for Organization Process Improvement Based on CMMI v.1.2
verfasst von : Suwanit Rungratri, Sasiporn Usanavasin
Erschienen in: Making Globally Distributed Software Development a Success Story
Verlag: Springer Berlin Heidelberg
Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.
Wählen Sie Textabschnitte aus um mit Künstlicher Intelligenz passenden Patente zu finden. powered by
Markieren Sie Textabschnitte, um KI-gestützt weitere passende Inhalte zu finden. powered by
In this paper, we introduce an ontology called
Project Assets Ontology
(
PAO
) that describe concepts of CMMI Maturity and Capability levels, Generic and Specific Goals, Generic and Specific Practices including concepts of Typical Work Products (an organization’s project assets) of 22 Process Areas that may be produced in a software development project based on CMMI v.1.2 model. This ontology can be used to enable a CMMI Maturity/Capability assessment tool for automatic generation of metadata description that describe an organization’s project work products. With the support of PAO and the generated metadata descriptions, the tool can automatically perform a preliminary CMMI gap analysis, which can lead to time and cost reductions in assessing the CMMI Maturity/Capability level of the organization.