Skip to main content

2019 | OriginalPaper | Buchkapitel

41. Towards Automated Analysis of Ambiguity in Modular Construction Contract Documents (A Qualitative & Quantitative Study)

verfasst von : Ali Azghandi Roshnavand, Mazdak Nik-Bakht, Sang H. Han

Erschienen in: Advances in Informatics and Computing in Civil and Construction Engineering

Verlag: Springer International Publishing

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

Modular coordination in building construction has become increasingly popular, particularly in Northern Europe and North America. Modular construction in Canada gained considerable attention over the last decade due to its positive impact on project constraints, safety, and preventing construction and demolition waste. However, the modular construction industry still adopts the same administrative procedures designed for the conventional construction industry even though the features of modular and conventional construction are different in terms of construction processes and methods. Due to this trend, ambiguities in administrative documents are widely occurred and are one of the main causes to generate conflict, disputes, and claims between owners and modular suppliers as general contractors. As a first step in the on-going research to overcome this challenge, the research team focuses on investigating the contents and structures of the current contracts, which are one of major confusion sources in modular construction, in order to mitigate and/or eliminate the ambiguities in the contracts based on the considering the features of modular construction processes and methods. In this respect, this paper presents a conceptual framework, which is: (1) to classify the major ambiguities in conventional and modular construction contracts; (2) to identify the similarities and differences between Canadian contract documents and benchmark countries. We use text mining to find top terms, including terms with high TF in each document, and high TF-IDF terms, which specifically occur in one document and not others then, we detect manually the three standard contracts and compare them with the output of literature review to identify the major issues that are common.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Frederick L.P.: Issues in Manufactured Home Construction Litigation. In: 9th Annual Construction Law Institute, Montana (2013) Frederick L.P.: Issues in Manufactured Home Construction Litigation. In: 9th Annual Construction Law Institute, Montana (2013)
2.
Zurück zum Zitat Mayra, D.L.T.: A review and analysis of modular construction practices (1994) [Online] Mayra, D.L.T.: A review and analysis of modular construction practices (1994) [Online]
3.
Zurück zum Zitat Zhang, X., Skitmore, M., Peng, Y.: Exploring the challenges to industrialized residential building in China. Habitat International 41, 176–184 (2014)CrossRef Zhang, X., Skitmore, M., Peng, Y.: Exploring the challenges to industrialized residential building in China. Habitat International 41, 176–184 (2014)CrossRef
4.
Zurück zum Zitat Kamar, A.M., Hamid, Z.A., Azman, N.A.: Industrialized building system (IBS): revisiting issues of definition and classification. Int. J. Emerg. Sci. 120–132 (2011) Kamar, A.M., Hamid, Z.A., Azman, N.A.: Industrialized building system (IBS): revisiting issues of definition and classification. Int. J. Emerg. Sci. 120–132 (2011)
5.
Zurück zum Zitat University, C.: Challenges and opportunities for modular construction in Canada. Concordia University, Montreal (2015) University, C.: Challenges and opportunities for modular construction in Canada. Concordia University, Montreal (2015)
6.
Zurück zum Zitat Carriker, M.L.S.: Factors affecting large scale modular construction projects. Associated Schools of Construction, p. 8 (2014) Carriker, M.L.S.: Factors affecting large scale modular construction projects. Associated Schools of Construction, p. 8 (2014)
7.
Zurück zum Zitat NIBS_OSCC.: National Institute of Building Sciences(NIBS) 2015 annual report. MBI, Virginia (2015) NIBS_OSCC.: National Institute of Building Sciences(NIBS) 2015 annual report. MBI, Virginia (2015)
8.
Zurück zum Zitat Smith, R.E., Rice, T.: PERMANENT modular construction, Utah: Modular Building Institute Foundations, 2015 Smith, R.E., Rice, T.: PERMANENT modular construction, Utah: Modular Building Institute Foundations, 2015
9.
Zurück zum Zitat Azhar, S., Lukkad, M.Y., Ahmad, I.: Modular v. stick-built construction: identification of critical decision-making factors. In: 48th ASC Annual International Conference Proceedings, Florida, 2012 Azhar, S., Lukkad, M.Y., Ahmad, I.: Modular v. stick-built construction: identification of critical decision-making factors. In: 48th ASC Annual International Conference Proceedings, Florida, 2012
10.
Zurück zum Zitat S. R. E.: Permanent modular construction. Modular Building Institute Foundations, Utah, 2015 S. R. E.: Permanent modular construction. Modular Building Institute Foundations, Utah, 2015
11.
Zurück zum Zitat Harvey, C.: Factors that influence the adoption of modular construction in Western Canada. Royal Roads University, Victoria, British Columbia, Canada (2016) Harvey, C.: Factors that influence the adoption of modular construction in Western Canada. Royal Roads University, Victoria, British Columbia, Canada (2016)
12.
Zurück zum Zitat Larsson, J., Eriksson, P.E., Olofsson, T.: Industrialized construction in the Swedish infrastructure sector: core elements and barriers. Constr. Manage. Econ. 83–96 (2014)CrossRef Larsson, J., Eriksson, P.E., Olofsson, T.: Industrialized construction in the Swedish infrastructure sector: core elements and barriers. Constr. Manage. Econ. 83–96 (2014)CrossRef
13.
Zurück zum Zitat Eriksson, P.E., Olander, S., Szentes, H., Widén, K.: Managing short-term efficiency and long-term development through industrialized construction. Constr. Manage. Econ. 97–108 (2014)CrossRef Eriksson, P.E., Olander, S., Szentes, H., Widén, K.: Managing short-term efficiency and long-term development through industrialized construction. Constr. Manage. Econ. 97–108 (2014)CrossRef
14.
Zurück zum Zitat Čuš-Babič, N., Rebolj, D., Nekrep-Perc, M., Podbreznik, P.: Supply-chain transparency within industrialized construction projects. Comput. Ind. 345–353 (2014)CrossRef Čuš-Babič, N., Rebolj, D., Nekrep-Perc, M., Podbreznik, P.: Supply-chain transparency within industrialized construction projects. Comput. Ind. 345–353 (2014)CrossRef
15.
Zurück zum Zitat Molavi, J., Barral, D.L.: A construction procurement method to achieve sustainability in modular construction. Procedia Eng. 145, 1362–1369 (2016)CrossRef Molavi, J., Barral, D.L.: A construction procurement method to achieve sustainability in modular construction. Procedia Eng. 145, 1362–1369 (2016)CrossRef
16.
Zurück zum Zitat Rausch, C., Nahangi, M., Perreault, M., Haas, C.T., West, J.: Optimum assembly planning for modular construction components. ASCE 14 (2016) Rausch, C., Nahangi, M., Perreault, M., Haas, C.T., West, J.: Optimum assembly planning for modular construction components. ASCE 14 (2016)
17.
Zurück zum Zitat Marc, D.Z.L.Z.B.: Key considerations before integrating modular construction: adaptation to the traditional French construction processes. Researchgate 13 (2015) Marc, D.Z.L.Z.B.: Key considerations before integrating modular construction: adaptation to the traditional French construction processes. Researchgate 13 (2015)
18.
Zurück zum Zitat O’Connor, J.T., O’Brien, W.J., Choi, J.O.: Industrial project execution planning: modularization versus stick-built. Am. Soc. Civil Eng. 1–13 (2015) O’Connor, J.T., O’Brien, W.J., Choi, J.O.: Industrial project execution planning: modularization versus stick-built. Am. Soc. Civil Eng. 1–13 (2015)
19.
Zurück zum Zitat Kamar, K.A.M., Alshawi, M., Hamid, Z.: Barriers to industrialized building system (IBS): the case of Malasyia. In: 9th International Postgraduate Research Conference (IPGRC), BuHu (2009) Kamar, K.A.M., Alshawi, M., Hamid, Z.: Barriers to industrialized building system (IBS): the case of Malasyia. In: 9th International Postgraduate Research Conference (IPGRC), BuHu (2009)
20.
Zurück zum Zitat Kamali, M., Hewage, K.: Development of performance criteria for sustainability evaluation of modular versus conventional construction methods. J. Cleaner Prod. 3592–3606 (2017)CrossRef Kamali, M., Hewage, K.: Development of performance criteria for sustainability evaluation of modular versus conventional construction methods. J. Cleaner Prod. 3592–3606 (2017)CrossRef
21.
Zurück zum Zitat Fateh, M.A.M., Mohammad, M.F., Shukor, A.S.A.: Review in formulating the standard form of contract for Industrialized Building System (IBS) construction approach in Malaysia. MATEC Web of Conferences, p. 7 (2017) Fateh, M.A.M., Mohammad, M.F., Shukor, A.S.A.: Review in formulating the standard form of contract for Industrialized Building System (IBS) construction approach in Malaysia. MATEC Web of Conferences, p. 7 (2017)
22.
Zurück zum Zitat Choi, J.O., O’Connor, J.T., Kim, T.W.: Recipes for cost and schedule successes in industrial modular projects: qualitative comparative analysis. ASCE 9 (2016) Choi, J.O., O’Connor, J.T., Kim, T.W.: Recipes for cost and schedule successes in industrial modular projects: qualitative comparative analysis. ASCE 9 (2016)
23.
Zurück zum Zitat Tap, T.N.A.K.M.M.M.: Critical success factor for industrialized building system process protocol map by lean construction management. J. Civil Environ. Eng. 6 (2016) Tap, T.N.A.K.M.M.M.: Critical success factor for industrialized building system process protocol map by lean construction management. J. Civil Environ. Eng. 6 (2016)
24.
Zurück zum Zitat Shahtari Yasaman, J.N.M., Rausch C., West.: Risk mitigation through tolerance strategies for design in modularization. Researchgate 9 (2015) Shahtari Yasaman, J.N.M., Rausch C., West.: Risk mitigation through tolerance strategies for design in modularization. Researchgate 9 (2015)
25.
Zurück zum Zitat Nik Bakht, M., Kinawy, S.N., El-Diraby, T.E.: News and social media as performance indicators for public involvement in transportation planning: Eglinton Crosstown Project in Toronto, Canada. TRB 94th annual meeting, At Washington, D.C., USA, p. 9 (2015) Nik Bakht, M., Kinawy, S.N., El-Diraby, T.E.: News and social media as performance indicators for public involvement in transportation planning: Eglinton Crosstown Project in Toronto, Canada. TRB 94th annual meeting, At Washington, D.C., USA, p. 9 (2015)
26.
Zurück zum Zitat Musa, M.F., Mohammad, M.F., Yusof, M.R., Ahmad, R.: Industrialised building system modular system (IBSMS) organisational readiness framework. Procedia Soc. Behav. Sci. 222, 83–92 (2016)CrossRef Musa, M.F., Mohammad, M.F., Yusof, M.R., Ahmad, R.: Industrialised building system modular system (IBSMS) organisational readiness framework. Procedia Soc. Behav. Sci. 222, 83–92 (2016)CrossRef
27.
Zurück zum Zitat El-Abidi, K.M.A., Ghazali, F.E.M.: Motivations and limitations of prefabricated building: an overview. Appl. Mech. Mater. 802, 668–675 (2015)CrossRef El-Abidi, K.M.A., Ghazali, F.E.M.: Motivations and limitations of prefabricated building: an overview. Appl. Mech. Mater. 802, 668–675 (2015)CrossRef
Metadaten
Titel
Towards Automated Analysis of Ambiguity in Modular Construction Contract Documents (A Qualitative & Quantitative Study)
verfasst von
Ali Azghandi Roshnavand
Mazdak Nik-Bakht
Sang H. Han
Copyright-Jahr
2019
DOI
https://doi.org/10.1007/978-3-030-00220-6_41