Skip to main content
Erschienen in: Fuzzy Optimization and Decision Making 1/2019

06.02.2018

Uncertain mean-variance model for dynamic project portfolio selection problem with divisibility

verfasst von: Xingmei Li, Yaxian Wang, Qingyou Yan, Xinchao Zhao

Erschienen in: Fuzzy Optimization and Decision Making | Ausgabe 1/2019

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

The project portfolio selection problem considering divisibility is a new research problem rising in recent years. However, two deficiencies are discovered in current divisible project portfolio selection research, one is that researchers always ignore the already started exiting projects when selecting a project portfolio, and the other is that the project parameters are all considered as exact values which are not consistent with practice situation. Under this circumstance, the paper first discusses the dynamic project portfolio selection problem with project divisibility. Meanwhile, due to the lack of correlative historical data, some project parameters are given by experts’ estimates and are treated as uncertain variables. Therefore, a mean-variance mixed integer nonlinear optimal selection model is first developed in this paper to deal with the uncertain dynamic project portfolio selection problem with divisibility. For the convenience of computations, an equivalent mixed integer linear programming representation is proposed. Numerical examples with two scenarios are presented to shed light on the characteristics of the proposed model.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literatur
Zurück zum Zitat Allahverdi, A., Ng, C. T., Cheng, T. C. E., & Kovalyov, M. Y. (2008). A survey of scheduling problems with setup times or costs. European Journal of Operational Research, 187(3), 985–1032.MathSciNetMATHCrossRef Allahverdi, A., Ng, C. T., Cheng, T. C. E., & Kovalyov, M. Y. (2008). A survey of scheduling problems with setup times or costs. European Journal of Operational Research, 187(3), 985–1032.MathSciNetMATHCrossRef
Zurück zum Zitat Baker, H. K. (2011). Capital budgeting valuation: Financial analysis for today’s investment projects. Hoboken, NJ: Wiley.CrossRef Baker, H. K. (2011). Capital budgeting valuation: Financial analysis for today’s investment projects. Hoboken, NJ: Wiley.CrossRef
Zurück zum Zitat Belenky, A. S. (2012). A boolean programming problem of choosing an optimal portfolio of projects and optimal schedules for them by reinvesting within the portfolio the profit from project implementation. Applied Mathematics Letters, 25(10), 1279–1284.MathSciNetMATHCrossRef Belenky, A. S. (2012). A boolean programming problem of choosing an optimal portfolio of projects and optimal schedules for them by reinvesting within the portfolio the profit from project implementation. Applied Mathematics Letters, 25(10), 1279–1284.MathSciNetMATHCrossRef
Zurück zum Zitat Cui, X. T., Zheng, X. J., Zhu, S. S., & Sun, X. L. (2013). Convex relaxations and MIQCQP reformulations for a class of cardinality-constrained portfolio selection problems. Journal of Global Optimization, 56(4), 1409–1423.MathSciNetMATHCrossRef Cui, X. T., Zheng, X. J., Zhu, S. S., & Sun, X. L. (2013). Convex relaxations and MIQCQP reformulations for a class of cardinality-constrained portfolio selection problems. Journal of Global Optimization, 56(4), 1409–1423.MathSciNetMATHCrossRef
Zurück zum Zitat Ding, S., & Gao, Y. (2014). The (\(\sigma \), S) policy for uncertain multi-product newsboy problem. Expert Systems with Applications, 41(8), 3769–3776.CrossRef Ding, S., & Gao, Y. (2014). The (\(\sigma \), S) policy for uncertain multi-product newsboy problem. Expert Systems with Applications, 41(8), 3769–3776.CrossRef
Zurück zum Zitat Eilat, H., Golany, B., & Shtub, A. (2006). Constructing and evaluating balanced portfolios of R&D projects with interactions: A DEA based methodology. European Journal of Operational Research, 172(3), 1018–1039.MATHCrossRef Eilat, H., Golany, B., & Shtub, A. (2006). Constructing and evaluating balanced portfolios of R&D projects with interactions: A DEA based methodology. European Journal of Operational Research, 172(3), 1018–1039.MATHCrossRef
Zurück zum Zitat Gao, Y. (2011). Shortest path problem with uncertain arc lengths. Computers & Mathematics with Applications, 62(6), 2591–2600.MathSciNetMATHCrossRef Gao, Y. (2011). Shortest path problem with uncertain arc lengths. Computers & Mathematics with Applications, 62(6), 2591–2600.MathSciNetMATHCrossRef
Zurück zum Zitat Hillbrandt, P. M. (1974). Economic theory and the construction industry (3rd ed.). New York: Halsted Press.CrossRef Hillbrandt, P. M. (1974). Economic theory and the construction industry (3rd ed.). New York: Halsted Press.CrossRef
Zurück zum Zitat Huang, X. X. (2010). Portfolio analysis: From probabilistic to credibilistic and uncertain approaches. Berlin: Springer.MATHCrossRef Huang, X. X. (2010). Portfolio analysis: From probabilistic to credibilistic and uncertain approaches. Berlin: Springer.MATHCrossRef
Zurück zum Zitat Huang, X. X., Su, X. L., & Zhao, T. Y. (2014). Optimal multinational project adjustment and selection with random parameters. Optimization, 63(10), 1583–1594.MathSciNetMATHCrossRef Huang, X. X., Su, X. L., & Zhao, T. Y. (2014). Optimal multinational project adjustment and selection with random parameters. Optimization, 63(10), 1583–1594.MathSciNetMATHCrossRef
Zurück zum Zitat Huang, X. X., Zhao, T. Y., & Kudratova, S. (2016). Uncertain mean-variance and mean-semivariance models for optimal project selection and scheduling. Knowledge-Based Systems, 93(1), 1–11.CrossRef Huang, X. X., Zhao, T. Y., & Kudratova, S. (2016). Uncertain mean-variance and mean-semivariance models for optimal project selection and scheduling. Knowledge-Based Systems, 93(1), 1–11.CrossRef
Zurück zum Zitat Ke, H., Ma, W. M., & Ma, J. J. (2012). Solving project scheduling problem with the philosophy of fuzzy random programming. Fuzzy Optimization and Decision Making, 11(3), 269–284.MathSciNetMATHCrossRef Ke, H., Ma, W. M., & Ma, J. J. (2012). Solving project scheduling problem with the philosophy of fuzzy random programming. Fuzzy Optimization and Decision Making, 11(3), 269–284.MathSciNetMATHCrossRef
Zurück zum Zitat Li, X. M., Fang, S. C., Guo, X. L., Deng, Z. B., & Qi, J. X. (2016). An extended model for project portfolio selection with project divisibility and interdependency. Journal of Systems Science and Systems Engineering, 25(1), 119–138.CrossRef Li, X. M., Fang, S. C., Guo, X. L., Deng, Z. B., & Qi, J. X. (2016). An extended model for project portfolio selection with project divisibility and interdependency. Journal of Systems Science and Systems Engineering, 25(1), 119–138.CrossRef
Zurück zum Zitat Li, X. M., Fang, S. C., Tian, Y., & Guo, X. L. (2015). Expanded model of the project portfolio selection problem with divisibility, time portfolio factors and cardinality constraints. Journal of the Operational Research Society, 66(7), 1132–1139.CrossRef Li, X. M., Fang, S. C., Tian, Y., & Guo, X. L. (2015). Expanded model of the project portfolio selection problem with divisibility, time portfolio factors and cardinality constraints. Journal of the Operational Research Society, 66(7), 1132–1139.CrossRef
Zurück zum Zitat Liu, B. D. (2007). Uncertainty theory (2nd ed.). Berlin: Springer.MATH Liu, B. D. (2007). Uncertainty theory (2nd ed.). Berlin: Springer.MATH
Zurück zum Zitat Liu, B. D. (2009). Some research problems in uncertainty theory. Journal of Uncertain Systems, 3(1), 3–10. Liu, B. D. (2009). Some research problems in uncertainty theory. Journal of Uncertain Systems, 3(1), 3–10.
Zurück zum Zitat Liu, Y. K., & Liu, B. D. (2003). Fuzzy random variables: A scalar expected value operator. Fuzzy Optimization and Decision Making, 2(2), 143–160.MathSciNetCrossRef Liu, Y. K., & Liu, B. D. (2003). Fuzzy random variables: A scalar expected value operator. Fuzzy Optimization and Decision Making, 2(2), 143–160.MathSciNetCrossRef
Zurück zum Zitat Lorie, J. H., & Savage, L. J. (1955). Three problems in rationing capital. The Journal of Business, 28(4), 229–239.CrossRef Lorie, J. H., & Savage, L. J. (1955). Three problems in rationing capital. The Journal of Business, 28(4), 229–239.CrossRef
Zurück zum Zitat Medaglia, A. L., Hueth, D., Mendieta, J. C., & Sefair, J. A. (2008). A multiobjective model for the selection and timing of public enterprise projects. Socio-Economic Planning Sciences, 42(1), 31–45.CrossRef Medaglia, A. L., Hueth, D., Mendieta, J. C., & Sefair, J. A. (2008). A multiobjective model for the selection and timing of public enterprise projects. Socio-Economic Planning Sciences, 42(1), 31–45.CrossRef
Zurück zum Zitat Ning, Y. F., Liu, J. J., & Yan, L. M. (2013). Uncertain aggregate production planning. Soft Computing, 17(4), 617–624.CrossRef Ning, Y. F., Liu, J. J., & Yan, L. M. (2013). Uncertain aggregate production planning. Soft Computing, 17(4), 617–624.CrossRef
Zurück zum Zitat Pekka, M., Juuso, L., & Ahti, S. (2015). Selecting infrastructure maintenance projects with robust portfolio modeling. Decision Support Systems, 77, 21–30.CrossRef Pekka, M., Juuso, L., & Ahti, S. (2015). Selecting infrastructure maintenance projects with robust portfolio modeling. Decision Support Systems, 77, 21–30.CrossRef
Zurück zum Zitat Takeshi, I., & Hiroaki, I. (2005). One machine scheduling problem with fuzzy random due-dates. Fuzzy Optimization and Decision Making, 4(1), 71–78.MathSciNetMATHCrossRef Takeshi, I., & Hiroaki, I. (2005). One machine scheduling problem with fuzzy random due-dates. Fuzzy Optimization and Decision Making, 4(1), 71–78.MathSciNetMATHCrossRef
Zurück zum Zitat Zhang, Q., Huang, X. X., & Tang, L. (2011). Optimal multinational capital budgeting under uncertainty. Computers & Mathematics with Applications, 62(12), 4557–4567.MathSciNetMATHCrossRef Zhang, Q., Huang, X. X., & Tang, L. (2011). Optimal multinational capital budgeting under uncertainty. Computers & Mathematics with Applications, 62(12), 4557–4567.MathSciNetMATHCrossRef
Zurück zum Zitat Zhang, Q., Huang, X. X., & Zhang, C. (2015). A mean-risk index model for uncertain capital budgeting. Journal of the Operational Research Society, 66(5), 761–770.CrossRef Zhang, Q., Huang, X. X., & Zhang, C. (2015). A mean-risk index model for uncertain capital budgeting. Journal of the Operational Research Society, 66(5), 761–770.CrossRef
Zurück zum Zitat Zhu, G., Bard, J. F., & Yu, G. (2005). Disruption management for resource-constrained project scheduling. Journal of the Operational Research Society, 56(4), 365–381.MATHCrossRef Zhu, G., Bard, J. F., & Yu, G. (2005). Disruption management for resource-constrained project scheduling. Journal of the Operational Research Society, 56(4), 365–381.MATHCrossRef
Metadaten
Titel
Uncertain mean-variance model for dynamic project portfolio selection problem with divisibility
verfasst von
Xingmei Li
Yaxian Wang
Qingyou Yan
Xinchao Zhao
Publikationsdatum
06.02.2018
Verlag
Springer US
Erschienen in
Fuzzy Optimization and Decision Making / Ausgabe 1/2019
Print ISSN: 1568-4539
Elektronische ISSN: 1573-2908
DOI
https://doi.org/10.1007/s10700-018-9283-6

Weitere Artikel der Ausgabe 1/2019

Fuzzy Optimization and Decision Making 1/2019 Zur Ausgabe