2016 | OriginalPaper | Buchkapitel
15 Years of GTC Operation at Aldel: Long-Term Assessment of GTC Performance
verfasst von : Anita Folkers, Jan de Weerdt, Peter Klut, Erik Dupon, Edo Engel
Erschienen in: Light Metals 2014
Verlag: Springer International Publishing
Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.
Wählen Sie Textabschnitte aus um mit Künstlicher Intelligenz passenden Patente zu finden. powered by
Markieren Sie Textabschnitte, um KI-gestützt weitere passende Inhalte zu finden. powered by
In 1998, a new Gas Treatment Center (GTC) was taken into operation at the ALDEL Aluminum Smelter located in Delfzijl, the Netherlands. This GTC was designed and built by Danieli Corus (former Hoogovens Technical Services) according to the Pleno IV design. This year, the GTC at ALDEL is operating successfully and reliably for 15 years, which is the reason for looking back at the past performance. In this article, the design and operation as well as the performance and availability of this GTC over the past 15 years will be discussed.