Skip to main content

2016 | OriginalPaper | Buchkapitel

15. A Multi-objective Dual-Resource Shop Scheduling Model Considering the Differences Between Operational Efficiency

verfasst von : Weizhong Wang, Jialian Wang, Chencheng Ma, Zhenqiang Bao, Richao Yin

Erschienen in: Proceedings of the 2015 Chinese Intelligent Systems Conference

Verlag: Springer Berlin Heidelberg

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

Multiple resource constraints exist widely in the actual job shop under the complicate manufacturing environment, so a multi-objective dual-resource shop scheduling model considering the differences between operational efficiency is established, which contains two resource constraints: the machines and workers. An improved SPEA2 is proposed for the model which achieves three goals: the shortest completion time, the lowest cost and the minimum total tardiness. Since the evolutionary operation in the traditional algorithm for single-resource model has not been able to meet requirements of the model in this paper, the chromosome coding, chromosome decoding, initialization of the population, crossover operation and mutation operation are especially improved so that the machines and workers can be assigned to the process reasonably. Finally, the feasibility and efficiency of the model are proved by the simulation experiment.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Xu J, Xu X, Xie SQ (2011) Recent developments in Dual Resource Constrained (DRC) system research [J]. Eur J Oper Res 215:309–318CrossRef Xu J, Xu X, Xie SQ (2011) Recent developments in Dual Resource Constrained (DRC) system research [J]. Eur J Oper Res 215:309–318CrossRef
2.
Zurück zum Zitat Quangyong J, Jianying Z (2006) Study of fuzzy scheduling problems with dual resource and multi process routes [J]. Mech Sci Technol 25(12):1424–1427 Quangyong J, Jianying Z (2006) Study of fuzzy scheduling problems with dual resource and multi process routes [J]. Mech Sci Technol 25(12):1424–1427
3.
Zurück zum Zitat Zamiska JR, Mohamad Jaber Y, Kher Hemant V (2007) Worker deployment in dual resource constrained systems with a task-type factor [J]. Eur J Oper Res 177(3):1507–1519CrossRefMATH Zamiska JR, Mohamad Jaber Y, Kher Hemant V (2007) Worker deployment in dual resource constrained systems with a task-type factor [J]. Eur J Oper Res 177(3):1507–1519CrossRefMATH
4.
Zurück zum Zitat Scholz-Reiter B, Heger J, Hildebrandt T (2010) Analysis of priority rule-based scheduling in dual-resource-constrained shop-floor scenarios [J]. Mach Learn Syst Eng 68:269–281MathSciNet Scholz-Reiter B, Heger J, Hildebrandt T (2010) Analysis of priority rule-based scheduling in dual-resource-constrained shop-floor scenarios [J]. Mach Learn Syst Eng 68:269–281MathSciNet
5.
Zurück zum Zitat Melnyk SA, Ragatz G (1996) Information and scheduling in a dual resource constrained job shop [J]. Int J Prod Res 10(34):2783–2802MATH Melnyk SA, Ragatz G (1996) Information and scheduling in a dual resource constrained job shop [J]. Int J Prod Res 10(34):2783–2802MATH
6.
Zurück zum Zitat Jingyao L, Shudong S, Yuan H, Ning W (2011) Solving dual resource constrained job-shop scheduling problem (DRCJSP) based on hybrid ant colony algorithm with self-adaptive parameters [J]. J Northw Polytech Univ 29(1):54–61 Jingyao L, Shudong S, Yuan H, Ning W (2011) Solving dual resource constrained job-shop scheduling problem (DRCJSP) based on hybrid ant colony algorithm with self-adaptive parameters [J]. J Northw Polytech Univ 29(1):54–61
7.
Zurück zum Zitat Yinghui D, Hongyan C, Renyuan F, Juan F (2009) The algorithm research on dual-resource and multi-objective job shop scheduling [J]. Mech Des Manuf 12:15–17 Yinghui D, Hongyan C, Renyuan F, Juan F (2009) The algorithm research on dual-resource and multi-objective job shop scheduling [J]. Mech Des Manuf 12:15–17
8.
Zurück zum Zitat Di L, Liyang X, Tianzhong S, Ze T (2006) Scheduling optimization based on hybrid genetic-tabu search algorithm for dual-resource constrained job shop [J]. J Northe Univ (Natural Science) 27(8):895–898 Di L, Liyang X, Tianzhong S, Ze T (2006) Scheduling optimization based on hybrid genetic-tabu search algorithm for dual-resource constrained job shop [J]. J Northe Univ (Natural Science) 27(8):895–898
9.
Zurück zum Zitat Zuhong L, Qingxin C, Ning M, Jiayu L (2013) Dual-resource near-optimal configuration method of manufacturing systems with production capability constraints [J]. Comput Integ Manufact Syst 19(6):1263–1271 Zuhong L, Qingxin C, Ning M, Jiayu L (2013) Dual-resource near-optimal configuration method of manufacturing systems with production capability constraints [J]. Comput Integ Manufact Syst 19(6):1263–1271
10.
Zurück zum Zitat Hoda E, Vishvas P, Imed Ben A (2000) Scheduling of manufacturing systems under dual-resource constraints using genetic algorithms [J]. J Manuf Syst 19(3):186–201CrossRef Hoda E, Vishvas P, Imed Ben A (2000) Scheduling of manufacturing systems under dual-resource constraints using genetic algorithms [J]. J Manuf Syst 19(3):186–201CrossRef
11.
Zurück zum Zitat Binghai Z, Shuyu J, Ping H, Lifeng X (2008) Scheduling algorithm of flexible production system based on dual resource [J]. Huanan Ligong Daxue Xuebao/J South China Univ Technol (Natural Science) 36(4):45–49 Binghai Z, Shuyu J, Ping H, Lifeng X (2008) Scheduling algorithm of flexible production system based on dual resource [J]. Huanan Ligong Daxue Xuebao/J South China Univ Technol (Natural Science) 36(4):45–49
12.
Zurück zum Zitat Xi C, Quanke P, Ningsheng W (2003) Intelligent optimization of bi-objective job-shop scheduling using genetic algorithms [J]. Mech Sci Technol 22(3):398–401 Xi C, Quanke P, Ningsheng W (2003) Intelligent optimization of bi-objective job-shop scheduling using genetic algorithms [J]. Mech Sci Technol 22(3):398–401
13.
Zurück zum Zitat Xiaoxia L, Gangyi C, Liyang X (2009) Research on bi-objective scheduling optimization for DRC Job Shop [J]. Mod Mach Tool Autom Manuf Techn 10:107–112 Xiaoxia L, Gangyi C, Liyang X (2009) Research on bi-objective scheduling optimization for DRC Job Shop [J]. Mod Mach Tool Autom Manuf Techn 10:107–112
14.
Zurück zum Zitat Huiyuan R, Lili J, Xiaoying X, Heping P (2009) Algorithm based on efficiency algorithm for dual-resource constrained job-shop scheduling [J]. Mech Electr Eng Technol 38(6):67–68 Huiyuan R, Lili J, Xiaoying X, Heping P (2009) Algorithm based on efficiency algorithm for dual-resource constrained job-shop scheduling [J]. Mech Electr Eng Technol 38(6):67–68
15.
Zurück zum Zitat Chaoyong Z, Yunqing R, Peigeng L (2004) POX crossover operation-based GA for job-shop scheduling problems [J]. China Mech Eng 15(23):2149–2153 Chaoyong Z, Yunqing R, Peigeng L (2004) POX crossover operation-based GA for job-shop scheduling problems [J]. China Mech Eng 15(23):2149–2153
Metadaten
Titel
A Multi-objective Dual-Resource Shop Scheduling Model Considering the Differences Between Operational Efficiency
verfasst von
Weizhong Wang
Jialian Wang
Chencheng Ma
Zhenqiang Bao
Richao Yin
Copyright-Jahr
2016
Verlag
Springer Berlin Heidelberg
DOI
https://doi.org/10.1007/978-3-662-48386-2_15