Skip to main content
Erschienen in: Neural Computing and Applications 7-8/2014

01.12.2014 | Original Article

An artificial intelligence approach for fuzzy possibilistic-stochastic multi-objective logistics network design

verfasst von: Behnam Vahdani, Saleh Dehbari, Mahdi Naderi-Beni, Esmaeil Zeinali Kh

Erschienen in: Neural Computing and Applications | Ausgabe 7-8/2014

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

In this paper, a logistics network is investigated which includes multi-suppliers, collection centers, transfer stations, treatment stations, and products. For this purpose, a multi-objective mathematical programming model is proposed that minimizes the total costs including the fixed costs for opening facilities and transportation costs between facilities, minimizes the distance between each waste-generating facilities and transfer stations, maximizing the distance between treatment and disposal stations and customer zones, and maximizes the sum of the reliability of coverage for the potential facilities which will be open. In order to make the results of this paper more realistic, a case study in the iron and steel industry has been investigated. Besides, a new solution approach is proposed by combining fuzzy possibilistic programming, stochastic programming, and fuzzy multi-objective programming. Moreover, an imperialist competitive algorithm is proposed to obtain near optimal solution in comparison with other evolutionary algorithms. Finally, computational experiments are provided to demonstrate the applicability and suitability of the proposed model and solution approaches.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Atashpas-Gargari E, Lucas C (2007) Colonial competitive algorithm. Congress on Evolutionary Computation, CEC, Piscataway Atashpas-Gargari E, Lucas C (2007) Colonial competitive algorithm. Congress on Evolutionary Computation, CEC, Piscataway
2.
Zurück zum Zitat Chiu MC, Teng LW (2013) Sustainable product and supply chain design decisions under uncertainties. Int J Precis Eng Manuf 14(11):1953–1960CrossRef Chiu MC, Teng LW (2013) Sustainable product and supply chain design decisions under uncertainties. Int J Precis Eng Manuf 14(11):1953–1960CrossRef
3.
Zurück zum Zitat Guide VDR Jr, Wassenhove LNV (2009) The evolution of closed-loop supply chain research. Oper Res 57(1):10–18CrossRefMATH Guide VDR Jr, Wassenhove LNV (2009) The evolution of closed-loop supply chain research. Oper Res 57(1):10–18CrossRefMATH
4.
Zurück zum Zitat Hong X, Wang Z, Wang D, Zhang H (2013) Decision models of closed-loop supply chain with remanufacturing under hybrid dual-channel collection. Int J Adv Manuf Technol 68(5–8):1851–1865CrossRef Hong X, Wang Z, Wang D, Zhang H (2013) Decision models of closed-loop supply chain with remanufacturing under hybrid dual-channel collection. Int J Adv Manuf Technol 68(5–8):1851–1865CrossRef
5.
Zurück zum Zitat Jimenez M, Arenas M, Bilbao A, Rodriguez MV (2007) Linear programming with fuzzy parameters: an interactive method resolution. Eur J Oper Res 177:1599–1609CrossRefMATHMathSciNet Jimenez M, Arenas M, Bilbao A, Rodriguez MV (2007) Linear programming with fuzzy parameters: an interactive method resolution. Eur J Oper Res 177:1599–1609CrossRefMATHMathSciNet
6.
Zurück zum Zitat Kim Y (2013) Facility location for a hybrid manufacturing/remanufacturing system with carbon costs. Graduate theses and dissertations. Paper 13329 Kim Y (2013) Facility location for a hybrid manufacturing/remanufacturing system with carbon costs. Graduate theses and dissertations. Paper 13329
7.
Zurück zum Zitat Lai YJ, Hwang CL (1992) A new approach to some possibilistic linear programming problems. Fuzzy Sets Syst 49:121–133CrossRefMathSciNet Lai YJ, Hwang CL (1992) A new approach to some possibilistic linear programming problems. Fuzzy Sets Syst 49:121–133CrossRefMathSciNet
8.
Zurück zum Zitat Lee JE, Chung KY, Lee KD, Gen M (2013) A multi-objective hybrid genetic algorithm to minimize the total cost and delivery tardiness in a reverse logistics. Multimed Tools Appl. doi:10.1007/s11042-013-1594-6 Lee JE, Chung KY, Lee KD, Gen M (2013) A multi-objective hybrid genetic algorithm to minimize the total cost and delivery tardiness in a reverse logistics. Multimed Tools Appl. doi:10.​1007/​s11042-013-1594-6
9.
Zurück zum Zitat Leung Y (1988) Spatial analysis and planning under imprecision (Studies in Regional Science and Urban Economics). Elsevier, Amsterdam Leung Y (1988) Spatial analysis and planning under imprecision (Studies in Regional Science and Urban Economics). Elsevier, Amsterdam
11.
Zurück zum Zitat Liu L, Huang GH, Liu Y, Fuller GA, Zeng GM (2003) A fuzzy-stochastic robust programming model for regional air quality management under uncertainty. Eng Optim 35(2):177–199CrossRefMathSciNet Liu L, Huang GH, Liu Y, Fuller GA, Zeng GM (2003) A fuzzy-stochastic robust programming model for regional air quality management under uncertainty. Eng Optim 35(2):177–199CrossRefMathSciNet
12.
Zurück zum Zitat Mehrbod M, Tu N, Miao L, Wenjing D (2012) Interactive fuzzy goal programming for a multi-objective closed-loop logistics network. Ann Oper Res 201(1):367–381CrossRefMATHMathSciNet Mehrbod M, Tu N, Miao L, Wenjing D (2012) Interactive fuzzy goal programming for a multi-objective closed-loop logistics network. Ann Oper Res 201(1):367–381CrossRefMATHMathSciNet
13.
Zurück zum Zitat Mohammadi M, Jolai F, Rostami H (2011) An M/M/c queue model for hub covering location problem. Math Comput Model 54:2623–2638CrossRefMATHMathSciNet Mohammadi M, Jolai F, Rostami H (2011) An M/M/c queue model for hub covering location problem. Math Comput Model 54:2623–2638CrossRefMATHMathSciNet
14.
Zurück zum Zitat Mousavi SM, Vahdani B, Tavakkoli-Moghaddam R, Hashemi H (2014) Location of cross-docking centers and vehicle routing scheduling under uncertainty: a fuzzy possibilistic–stochastic programming model. Appl Math Model 38(7–8):2249–2264CrossRefMathSciNet Mousavi SM, Vahdani B, Tavakkoli-Moghaddam R, Hashemi H (2014) Location of cross-docking centers and vehicle routing scheduling under uncertainty: a fuzzy possibilistic–stochastic programming model. Appl Math Model 38(7–8):2249–2264CrossRefMathSciNet
15.
Zurück zum Zitat Pishvaee MS, Torabi SA (2010) A possibilistic programming approach for closed-loop supply chain network design under uncertainty. Fuzzy Sets Syst 161:2668–2683CrossRefMATHMathSciNet Pishvaee MS, Torabi SA (2010) A possibilistic programming approach for closed-loop supply chain network design under uncertainty. Fuzzy Sets Syst 161:2668–2683CrossRefMATHMathSciNet
16.
Zurück zum Zitat Sabzevari Zadeh A, Sahraeian R, Homayouni SM (2014) A dynamic multi-commodity inventory and facility location problem in steel supply chain network design. Int J Adv Manuf Technoly 70(5–8):1267–1282CrossRef Sabzevari Zadeh A, Sahraeian R, Homayouni SM (2014) A dynamic multi-commodity inventory and facility location problem in steel supply chain network design. Int J Adv Manuf Technoly 70(5–8):1267–1282CrossRef
17.
Zurück zum Zitat Soleimani H, Seyyed-Esfahani M, Akbarpour Shirazi M (2013) Designing and planning a multi-echelon multi-period multi-product closed-loop supply chain utilizing genetic algorithm. The International Journal of Advanced Manufacturing Technology 68(1–4):917–931CrossRef Soleimani H, Seyyed-Esfahani M, Akbarpour Shirazi M (2013) Designing and planning a multi-echelon multi-period multi-product closed-loop supply chain utilizing genetic algorithm. The International Journal of Advanced Manufacturing Technology 68(1–4):917–931CrossRef
18.
Zurück zum Zitat Soleimani H, Seyyed-Esfahani M, Akbarpour Shirazi M (2013) A new multi-criteria scenario-based solution approach for stochastic forward/reverse supply chain network design. Ann Oper Res. doi:10.1007/s10479-013-1435-z Soleimani H, Seyyed-Esfahani M, Akbarpour Shirazi M (2013) A new multi-criteria scenario-based solution approach for stochastic forward/reverse supply chain network design. Ann Oper Res. doi:10.​1007/​s10479-013-1435-z
19.
Zurück zum Zitat Soyster AL (1973) Convex programming with set-inclusive constraints: applications to inexact linear programming. Oper Res 21:1154–1157CrossRefMATHMathSciNet Soyster AL (1973) Convex programming with set-inclusive constraints: applications to inexact linear programming. Oper Res 21:1154–1157CrossRefMATHMathSciNet
20.
Zurück zum Zitat Torabi SA, Hassini E (2008) An interactive possibilistic programming approach for multiple objective supply chain master planning. Fuzzy Sets Syst 159:193–214CrossRefMATHMathSciNet Torabi SA, Hassini E (2008) An interactive possibilistic programming approach for multiple objective supply chain master planning. Fuzzy Sets Syst 159:193–214CrossRefMATHMathSciNet
21.
Zurück zum Zitat Vahdani B, Razmi J, Tavakkoli-Moghaddam R (2012) Fuzzy possibilistic modeling for closed loop recycling collection networks. Environ Model Assess 17(6):623–637CrossRef Vahdani B, Razmi J, Tavakkoli-Moghaddam R (2012) Fuzzy possibilistic modeling for closed loop recycling collection networks. Environ Model Assess 17(6):623–637CrossRef
22.
Zurück zum Zitat Vahdani B, Tavakkoli-Moghaddam R, Jolai F, Baboli A (2012) Reliable design of a closed loop supply chain network under uncertainty: an interval fuzzy possibilistic chance-constrained model. Eng Optim. doi:10.1080/0305215X.2012.704029 Vahdani B, Tavakkoli-Moghaddam R, Jolai F, Baboli A (2012) Reliable design of a closed loop supply chain network under uncertainty: an interval fuzzy possibilistic chance-constrained model. Eng Optim. doi:10.​1080/​0305215X.​2012.​704029
23.
Zurück zum Zitat Vahdani B, Tavakkoli-Moghaddam R, Modarres M, Baboli A (2012) Reliable design of a forward/reverse logistics network under uncertainty: a robust-M/M/c queuing model. Transp Res Part E 48(6):1152–1168CrossRef Vahdani B, Tavakkoli-Moghaddam R, Modarres M, Baboli A (2012) Reliable design of a forward/reverse logistics network under uncertainty: a robust-M/M/c queuing model. Transp Res Part E 48(6):1152–1168CrossRef
24.
Zurück zum Zitat Wang HF, Hsu HW (2012) A possibilistic approach to the modeling and resolution of uncertain closed-loop logistics. Fuzzy Optim Decis Making 11(2):177–208CrossRefMATHMathSciNet Wang HF, Hsu HW (2012) A possibilistic approach to the modeling and resolution of uncertain closed-loop logistics. Fuzzy Optim Decis Making 11(2):177–208CrossRefMATHMathSciNet
25.
Zurück zum Zitat Wang J, Shu YF (2007) A possibilistic decision model for new product supply chain design. Euro J Oper Res 177:1044–1061 Wang J, Shu YF (2007) A possibilistic decision model for new product supply chain design. Euro J Oper Res 177:1044–1061
27.
Zurück zum Zitat Zhang Y, Song S, Zhang H, Wu C, Yin W (2012) A hybrid genetic algorithm for two-stage multi-item inventory system with stochastic demand. Neural Comput Appl 21(6):1087–1098CrossRef Zhang Y, Song S, Zhang H, Wu C, Yin W (2012) A hybrid genetic algorithm for two-stage multi-item inventory system with stochastic demand. Neural Comput Appl 21(6):1087–1098CrossRef
28.
Zurück zum Zitat Zhou XC, Zhao ZX, Zhou KJ, He CH (2012) Remanufacturing closed-loop supply chain network design based on genetic particle swarm optimization algorithm. J Cent South Univ 19(2):482–487CrossRef Zhou XC, Zhao ZX, Zhou KJ, He CH (2012) Remanufacturing closed-loop supply chain network design based on genetic particle swarm optimization algorithm. J Cent South Univ 19(2):482–487CrossRef
Metadaten
Titel
An artificial intelligence approach for fuzzy possibilistic-stochastic multi-objective logistics network design
verfasst von
Behnam Vahdani
Saleh Dehbari
Mahdi Naderi-Beni
Esmaeil Zeinali Kh
Publikationsdatum
01.12.2014
Verlag
Springer London
Erschienen in
Neural Computing and Applications / Ausgabe 7-8/2014
Print ISSN: 0941-0643
Elektronische ISSN: 1433-3058
DOI
https://doi.org/10.1007/s00521-014-1679-9

Weitere Artikel der Ausgabe 7-8/2014

Neural Computing and Applications 7-8/2014 Zur Ausgabe

Premium Partner