Skip to main content
Erschienen in: Rock Mechanics and Rock Engineering 4/2020

16.11.2019 | Original Paper

Design of the Key Bearing Layer and Secondary Mining Technology for Previously Mined Areas of Small Coal Mines

verfasst von: Rui Wu, P. H. S. W. Kulatilake, Hao Luo, Kui Zhao

Erschienen in: Rock Mechanics and Rock Engineering | Ausgabe 4/2020

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

In many underground coal-mine fields, where small scale coal mining had been performed, the available resources were not extracted fully. To extract the remaining coal, it is necessary to perform secondary mining. In this paper, a novel secondary mining technology is suggested incorporating a novel concept of building a key bearing layer (KBL) through backfilling in the previously mined areas to increase the extraction ratio, prolong the mine life, and avoid undesirable impacts on the limited coal resources and ecological environment. To analyze the influence of previously mined areas of small coal mines on the secondary mining, two new methods of determining the thickness of the KBL, choosing of the backfilling material, the slice backfilling method, ABAQUS finite-element analysis, field monitoring of displacement, and secondary mining technology were implemented. The results show that a minimum thickness of 5 m is required for the KBL in B909 panel of Pingshuo No. 2 underground coal mine to ensure stability of both the roof and coal walls during the secondary mining process. Ruimi-backfilling material was used to construct the cutting layer and KBL with different compressive strengths in the previously mined areas to carry out the slice backfilling, which met the mining requirements of the normal coal seam with reduced cost. Numerical simulation results showed that, when the secondary mining face was 20 m away from the previously mined areas, the secondary mining stress overlapped with the stress which was there from the previously mined areas to result in roof collapses. When the secondary mining face approached the previously mined areas, the roof of the goaf had a large area of collapse, which was beneficial to the stability of the KBL. It was possible to use the field-monitored displacements to validate the numerical-modeling results. The proposed novel secondary mining technology with backfilling in the previously mined areas of small coal mines turned out to be a safe, high-yielding and efficient mining method.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literatur
Zurück zum Zitat Huo BJ, Hou SZ (2006) Some ideas on increasing recovery (in Chinese). Min Eng 4:4–6 Huo BJ, Hou SZ (2006) Some ideas on increasing recovery (in Chinese). Min Eng 4:4–6
Zurück zum Zitat Jiang BY, Wang LG, Lu YL, Sun XK, Gan J (2016) Ground pressure and overlying strata structure for a repeated mining face of residual coal after room and pillar mining. Int J Min Sci Technol 26:645–652CrossRef Jiang BY, Wang LG, Lu YL, Sun XK, Gan J (2016) Ground pressure and overlying strata structure for a repeated mining face of residual coal after room and pillar mining. Int J Min Sci Technol 26:645–652CrossRef
Zurück zum Zitat Jin G, Wang LG, Zhang JH, Hu MJ, Duan N (2015) Roadway layout for recycling residual coal pillar in room-and-pillar mining of thick coal seam. Int J Min Sci Technol 25:729–734CrossRef Jin G, Wang LG, Zhang JH, Hu MJ, Duan N (2015) Roadway layout for recycling residual coal pillar in room-and-pillar mining of thick coal seam. Int J Min Sci Technol 25:729–734CrossRef
Zurück zum Zitat Li JX, Wang LG, Feng MS (2005) Research on wide strip skip-mining (in Chinese). J Liaoning Technol Univ 24:42–44CrossRef Li JX, Wang LG, Feng MS (2005) Research on wide strip skip-mining (in Chinese). J Liaoning Technol Univ 24:42–44CrossRef
Zurück zum Zitat Liu HW (2004) Mechanics of materials (II), 4th edn. Higher Education Press, Beijing Liu HW (2004) Mechanics of materials (II), 4th edn. Higher Education Press, Beijing
Zurück zum Zitat Liu QS, Feng GM, Jia KJ, Lian XL (2010) The application of filling technology by grouting in dealing with fallen waste rocks from gobs of small mines (in Chinese). China Coal 36:66–68 Liu QS, Feng GM, Jia KJ, Lian XL (2010) The application of filling technology by grouting in dealing with fallen waste rocks from gobs of small mines (in Chinese). China Coal 36:66–68
Zurück zum Zitat Liu C, Gong PL, Wang K, Zhang XQ, Liu YD (2015) Roof stability for repeated mining workface passing through abandoned parallel gateway. J China Coal Soc 40:314–322 Liu C, Gong PL, Wang K, Zhang XQ, Liu YD (2015) Roof stability for repeated mining workface passing through abandoned parallel gateway. J China Coal Soc 40:314–322
Zurück zum Zitat Qi G (2009) Small mine destructive area resource repeated use technology (in Chinese). Coal Mine Eng 41:7–9 Qi G (2009) Small mine destructive area resource repeated use technology (in Chinese). Coal Mine Eng 41:7–9
Zurück zum Zitat Sun HZ, Zhang SJ, Liu JW (2003) Analyzing behavior and strategy of small coal-mines in games theory (in Chinese). J Liaoning Technol Univ (Soc Sci Ed) 5:78–81 Sun HZ, Zhang SJ, Liu JW (2003) Analyzing behavior and strategy of small coal-mines in games theory (in Chinese). J Liaoning Technol Univ (Soc Sci Ed) 5:78–81
Zurück zum Zitat Wang A (2009a) Rational development of coal resources, guarantee our country’s energy safety from the strategy: the thinking of speeding up the coal strategic base construction in Shanxi, Shaanxi, Inner Mongolia and Ningxia province (in Chinese). Res Macro Econ 30:3–9 Wang A (2009a) Rational development of coal resources, guarantee our country’s energy safety from the strategy: the thinking of speeding up the coal strategic base construction in Shanxi, Shaanxi, Inner Mongolia and Ningxia province (in Chinese). Res Macro Econ 30:3–9
Zurück zum Zitat Wang QY (2009b) Technical practice of secondary mining in the destroy area of Honghui NO.1 small coal mine (in Chinese). Coal 18:21–23 Wang QY (2009b) Technical practice of secondary mining in the destroy area of Honghui NO.1 small coal mine (in Chinese). Coal 18:21–23
Zurück zum Zitat Wei Y (2005) The technology of comprehensive face across mini-type coal mine destructive area (in Chinese). Shanxi Coking Coal Sci Technol 29:16–17 Wei Y (2005) The technology of comprehensive face across mini-type coal mine destructive area (in Chinese). Shanxi Coking Coal Sci Technol 29:16–17
Zurück zum Zitat Xu ZH, Zhao YS, Gao HB, Gong PL (2015) Several problems of the old mining remnants in longwall fully mechanized mining technology. J China Coal Soc 40:33–39 Xu ZH, Zhao YS, Gao HB, Gong PL (2015) Several problems of the old mining remnants in longwall fully mechanized mining technology. J China Coal Soc 40:33–39
Zurück zum Zitat Zhang G (2005) The solutions and economic analysis for improving the recovery rate of coal resources (in Chinese). China Coal 31:27–30 Zhang G (2005) The solutions and economic analysis for improving the recovery rate of coal resources (in Chinese). China Coal 31:27–30
Zurück zum Zitat Zhang ZZ, Bai JB, Han ZT, Wang XY, Xu Y, Wang M (2013) Roof mechanics analysis and backfill technology for abandoned roadway. J Min Saf Eng 30:194–198 Zhang ZZ, Bai JB, Han ZT, Wang XY, Xu Y, Wang M (2013) Roof mechanics analysis and backfill technology for abandoned roadway. J Min Saf Eng 30:194–198
Zurück zum Zitat Zhang YJ, Feng GR, Zhang M, Ren HR, Bai JW, Guo YX, Jiang HN, Kang LX (2016) Residual coal exploitation and its impact on sustainable development of the coal industry in China. Energy Policy 96:534–541CrossRef Zhang YJ, Feng GR, Zhang M, Ren HR, Bai JW, Guo YX, Jiang HN, Kang LX (2016) Residual coal exploitation and its impact on sustainable development of the coal industry in China. Energy Policy 96:534–541CrossRef
Zurück zum Zitat Zhang XQ, Gong PL, Wang K, Li JZ, Jiang YL (2019) Characteristic and mechanism of roof fracture ahead of the face in an LTCC panel when passing an abandoned roadway: a case study from the Shenghua coal mine, China. Rock Mech Rock Eng 52:2775–2788CrossRef Zhang XQ, Gong PL, Wang K, Li JZ, Jiang YL (2019) Characteristic and mechanism of roof fracture ahead of the face in an LTCC panel when passing an abandoned roadway: a case study from the Shenghua coal mine, China. Rock Mech Rock Eng 52:2775–2788CrossRef
Zurück zum Zitat Zhao T, Liu CY (2017) Roof instability characteristics and pre-grouting of the roof caving zone in residual coal mining. J Geophys Eng 14:1463–1474CrossRef Zhao T, Liu CY (2017) Roof instability characteristics and pre-grouting of the roof caving zone in residual coal mining. J Geophys Eng 14:1463–1474CrossRef
Metadaten
Titel
Design of the Key Bearing Layer and Secondary Mining Technology for Previously Mined Areas of Small Coal Mines
verfasst von
Rui Wu
P. H. S. W. Kulatilake
Hao Luo
Kui Zhao
Publikationsdatum
16.11.2019
Verlag
Springer Vienna
Erschienen in
Rock Mechanics and Rock Engineering / Ausgabe 4/2020
Print ISSN: 0723-2632
Elektronische ISSN: 1434-453X
DOI
https://doi.org/10.1007/s00603-019-02001-5

Weitere Artikel der Ausgabe 4/2020

Rock Mechanics and Rock Engineering 4/2020 Zur Ausgabe