Abstract

Several methods, measures or indicators have been developed for assessment of reliability of power systems. A single formula or technique, which would give all the answers, does not exist, because the power systems are far too complex for this to be possible. Selected methods, measures and indicators are summarized from the point of view of generating power and energy which is produced in power plants. Generation reserve margin is a measure, which shows how the capacity of power system exceeds the peak consumption. Percent reserve evaluation is calculated by comparing the total installed generating capacity at peak with the peak load. The loss of load probability is defined as the probability of the system load exceeding available generating capacity under the assumption that the peak load is considered as constant through the day. The loss of load probability does not really stand for a probability. It expresses statistically calculated value representing the percentage of hours or days in a certain time frame, when energy consumption cannot be covered considering the probability of losses of generating units. The frequency and duration method utilizes the transition rate parameters ? and ? in addition to availability and unavailability. Parameter ? represents failure rate. Parameter ? represents the repair rate.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Calabrese G (1947) Generating reserve capacity determined by the probability method. AIEE Trans 66:1439?1450 Calabrese G (1947) Generating reserve capacity determined by the probability method. AIEE Trans 66:1439?1450
2.
Zurück zum Zitat Adequacy assessment of generating units in Slovenia for the Period 2005?2008 (2005) (in Slovenian). ELES Adequacy assessment of generating units in Slovenia for the Period 2005?2008 (2005) (in Slovenian). ELES
3.
Zurück zum Zitat Brezovec B, Matko V, Podberši? M (2009) Concept of reliability design of modern informatic system for emergency call. FERI Maribor Brezovec B, Matko V, Podberši? M (2009) Concept of reliability design of modern informatic system for emergency call. FERI Maribor
4.
Zurück zum Zitat Rietz R (2006) Costs of adequacy and reliability of electric power. IEEE Rietz R (2006) Costs of adequacy and reliability of electric power. IEEE
5.
Zurück zum Zitat Vijayamohanan PN (2008) Loss of load probability of a power system. Munich Vijayamohanan PN (2008) Loss of load probability of a power system. Munich
6.
Zurück zum Zitat Stoll HG (1989) Least-cost electricity utility planning. Wiley, New York Stoll HG (1989) Least-cost electricity utility planning. Wiley, New York
7.
Zurück zum Zitat Billinton R, Allan R (1996) Reliability evaluation of power systems. Plenum, New YorkCrossRef Billinton R, Allan R (1996) Reliability evaluation of power systems. Plenum, New YorkCrossRef
8.
Zurück zum Zitat Leite da Silva AM, Melo ACG, Cunha SHF (1991) Frequency and duration method for reliability evaluation of large-scale hydrothermal generating systems. In: Proceedings of Inst Electr Eng C138(1) Leite da Silva AM, Melo ACG, Cunha SHF (1991) Frequency and duration method for reliability evaluation of large-scale hydrothermal generating systems. In: Proceedings of Inst Electr Eng C138(1)
9.
Zurück zum Zitat Melo ACG, Pereira MVF, Leite da Silva AM (1992) Frequency and duration calculations in composite generation and transmission reliability evaluation. IEEE Trans Power Syst 7(2):469?476CrossRef Melo ACG, Pereira MVF, Leite da Silva AM (1992) Frequency and duration calculations in composite generation and transmission reliability evaluation. IEEE Trans Power Syst 7(2):469?476CrossRef
10.
Zurück zum Zitat Melo ACG, Pereira MVF, Leite da Silva AM (1993) A conditional probability approach to the calculation of frequency and duration indices in composite reliability evaluation. IEEE Trans Power Syst 8(3):1118?1125CrossRef Melo ACG, Pereira MVF, Leite da Silva AM (1993) A conditional probability approach to the calculation of frequency and duration indices in composite reliability evaluation. IEEE Trans Power Syst 8(3):1118?1125CrossRef
11.
Zurück zum Zitat Renuga P, Ramaraj N, Primrose A (2006) Frequency and duration method for reliability evaluation of large scale power generation system by fast fourier transform technique. J Energy Environ 5 Renuga P, Ramaraj N, Primrose A (2006) Frequency and duration method for reliability evaluation of large scale power generation system by fast fourier transform technique. J Energy Environ 5
12.
Zurück zum Zitat Billinton R, Allan RN (1988) Reliability assessment of large electric power systems. Kluwer, BostonCrossRef Billinton R, Allan RN (1988) Reliability assessment of large electric power systems. Kluwer, BostonCrossRef
13.
Zurück zum Zitat Wang X, McDonald JR (1994) Modern power system planning. McGraw-Hill, New York Wang X, McDonald JR (1994) Modern power system planning. McGraw-Hill, New York
14.
Zurück zum Zitat Clifford E (2009) Overview of AdCal model. EirGrid, Ireland Clifford E (2009) Overview of AdCal model. EirGrid, Ireland
15.
Zurück zum Zitat World Energy Council (2004) Performance of generating plant: new realities, new needs. A report of the World Energy Council World Energy Council (2004) Performance of generating plant: new realities, new needs. A report of the World Energy Council
16.
Zurück zum Zitat Allan RN, Billinton R (1992) Probabilistic methods applied to electric power systems: are they worth it? Power Eng J 6(3):121?129BCrossRef Allan RN, Billinton R (1992) Probabilistic methods applied to electric power systems: are they worth it? Power Eng J 6(3):121?129BCrossRef
17.
Zurück zum Zitat IEEE Std 1366 (2003) Guide for electric power distribution reliability indices. IEEE IEEE Std 1366 (2003) Guide for electric power distribution reliability indices. IEEE
18.
Zurück zum Zitat Elmakias D (2008) New computational methods in power system reliability. Springer, Berlin, Heidelberg Elmakias D (2008) New computational methods in power system reliability. Springer, Berlin, Heidelberg
19.
Zurück zum Zitat Anders GJ (1990) Probability concepts in electric power systems. Wiley, New York Anders GJ (1990) Probability concepts in electric power systems. Wiley, New York
Metadaten
Titel
Generating Capacity Methods
verfasst von
Marko Čepin
Copyright-Jahr
2011
Verlag
Springer London
DOI
https://doi.org/10.1007/978-0-85729-688-7_12