Skip to main content
Erschienen in: Journal of Intelligent Manufacturing 3/2018

20.12.2014

Integrated process planning and scheduling: an enhanced ant colony optimization heuristic with parameter tuning

verfasst von: S. Zhang, T. N. Wong

Erschienen in: Journal of Intelligent Manufacturing | Ausgabe 3/2018

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

This study develops an enhanced ant colony optimization (E-ACO) meta-heuristic to accomplish the integrated process planning and scheduling (IPPS) problem in the job-shop environment. The IPPS problem is represented by AND/OR graphs to implement the search-based algorithm, which aims at obtaining effective and near-optimal solutions in terms of makespan, job flow time and computation time taken. In accordance with the characteristics of the IPPS problem, the mechanism of ACO algorithm has been enhanced with several modifications, including quantification of convergence level, introduction of node-based pheromone, earliest finishing time-based strategy of determining the heuristic desirability, and oriented elitist pheromone deposit strategy. Using test cases with comprehensive consideration of manufacturing flexibilities, experiments are conducted to evaluate the approach, and to study the effects of algorithm parameters, with a general guideline for ACO parameter tuning for IPPS problems provided. The results show that with the specific modifications made on ACO algorithm, it is able to generate encouraging performance which outperforms many other meta-heuristics.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literatur
Zurück zum Zitat Arnaout, J. P., Musa, R., & Rabadi, G. (2014). A two-stage ant colony optimization algorithm to minimize the makespan on unrelated parallel machines—part ii: Enhancements and experimentations. Journal of Intelligent Manufacturing, 25(1), 43–53.CrossRef Arnaout, J. P., Musa, R., & Rabadi, G. (2014). A two-stage ant colony optimization algorithm to minimize the makespan on unrelated parallel machines—part ii: Enhancements and experimentations. Journal of Intelligent Manufacturing, 25(1), 43–53.CrossRef
Zurück zum Zitat Arnaout, J. P., Rabadi, G., & Musa, R. (2010). A two-stage ant colony optimization algorithm to minimize the makespan on unrelated parallel machines with sequence-dependent setup times. Journal of Intelligent Manufacturing, 21(6), 693–701.CrossRef Arnaout, J. P., Rabadi, G., & Musa, R. (2010). A two-stage ant colony optimization algorithm to minimize the makespan on unrelated parallel machines with sequence-dependent setup times. Journal of Intelligent Manufacturing, 21(6), 693–701.CrossRef
Zurück zum Zitat Balasubramanian, S., Maturana, F. P., & Norrie, D. H. (1996). Multi-agent planning and coordination for distributed concurrent engineering. International Journal of Cooperative Information Systems, 05(02n03), 153–179.CrossRef Balasubramanian, S., Maturana, F. P., & Norrie, D. H. (1996). Multi-agent planning and coordination for distributed concurrent engineering. International Journal of Cooperative Information Systems, 05(02n03), 153–179.CrossRef
Zurück zum Zitat Blum, C. (2005). Ant colony optimization: Introduction and recent trends. Physics of Life Reviews, 2(4), 353–373.CrossRef Blum, C. (2005). Ant colony optimization: Introduction and recent trends. Physics of Life Reviews, 2(4), 353–373.CrossRef
Zurück zum Zitat Chiang, C. W., Huang, Y. Q., & Wang, W. Y. (2008). Ant colony optimization with parameter adaptation for multi-mode resource-constrained project scheduling. Journal of Intelligent and Fuzzy Systems, 19(4–5), 345–358. Chiang, C. W., Huang, Y. Q., & Wang, W. Y. (2008). Ant colony optimization with parameter adaptation for multi-mode resource-constrained project scheduling. Journal of Intelligent and Fuzzy Systems, 19(4–5), 345–358.
Zurück zum Zitat Dorigo, M. (1992). Optimization, Learning and Natural Algorithms. Italy: Politecnico di Milano. Dorigo, M. (1992). Optimization, Learning and Natural Algorithms. Italy: Politecnico di Milano.
Zurück zum Zitat Dorigo, M., & Gambardella, L. M. (1996). A study of some properties of ant-Q parallel problem solving from nature-PPSN IV. Berlin: Springer. Dorigo, M., & Gambardella, L. M. (1996). A study of some properties of ant-Q parallel problem solving from nature-PPSN IV. Berlin: Springer.
Zurück zum Zitat Dorigo, M., Maniezzo, V., & Colorni, A. (1991). The ant system: An autocatalytic optimizing process. Technical report. Dorigo, M., Maniezzo, V., & Colorni, A. (1991). The ant system: An autocatalytic optimizing process. Technical report.
Zurück zum Zitat Gu, P., Balasubramanian, S., & Norrie, D. H. (1997). Bidding-based process planning and scheduling in a multi-agent system. Computers and Industrial Engineering, 32(2), 477–496.CrossRef Gu, P., Balasubramanian, S., & Norrie, D. H. (1997). Bidding-based process planning and scheduling in a multi-agent system. Computers and Industrial Engineering, 32(2), 477–496.CrossRef
Zurück zum Zitat Guo, Y. W., Li, W. D., Mileham, A. R., & Owen, G. W. (2009). Applications of particle swarm optimisation in integrated process planning and scheduling. Robotics and Computer-Integrated Manufacturing, 25(2), 280–288.CrossRef Guo, Y. W., Li, W. D., Mileham, A. R., & Owen, G. W. (2009). Applications of particle swarm optimisation in integrated process planning and scheduling. Robotics and Computer-Integrated Manufacturing, 25(2), 280–288.CrossRef
Zurück zum Zitat Ho, Y. C., & Moodie, C. L. (1996). Solving cell formation problems in a manufacturing environment with flexible processing and routing capabilities. International Journal of Production Research, 34(10), 2901–2923.CrossRef Ho, Y. C., & Moodie, C. L. (1996). Solving cell formation problems in a manufacturing environment with flexible processing and routing capabilities. International Journal of Production Research, 34(10), 2901–2923.CrossRef
Zurück zum Zitat Iwata, K., Murotsu, Y., & Oba, F. (1978). Optimization of selection of machine-tool, loading sequence of parts and machining conditions in job-shop type machining systems. Annals of the CIRP, 27, 447–451. Iwata, K., Murotsu, Y., & Oba, F. (1978). Optimization of selection of machine-tool, loading sequence of parts and machining conditions in job-shop type machining systems. Annals of the CIRP, 27, 447–451.
Zurück zum Zitat Khoshnevis, B., & Chen, Q. M. (1991). Integration of process planning and scheduling functions. Journal of Intelligent Manufacturing, 2(3), 165–175.CrossRef Khoshnevis, B., & Chen, Q. M. (1991). Integration of process planning and scheduling functions. Journal of Intelligent Manufacturing, 2(3), 165–175.CrossRef
Zurück zum Zitat Kim, Y. K., Kim, J. Y., & Shin, K. S. (2007). An asymmetric multileveled symbiotic evolutionary algorithm for integrated FMS scheduling. Journal of Intelligent Manufacturing, 18(6), 631–645.CrossRef Kim, Y. K., Kim, J. Y., & Shin, K. S. (2007). An asymmetric multileveled symbiotic evolutionary algorithm for integrated FMS scheduling. Journal of Intelligent Manufacturing, 18(6), 631–645.CrossRef
Zurück zum Zitat Kim, Y. K., Park, K., & Ko, J. (2003). A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling. Computers and Operations Research, 30(8), 1151–1171.CrossRef Kim, Y. K., Park, K., & Ko, J. (2003). A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling. Computers and Operations Research, 30(8), 1151–1171.CrossRef
Zurück zum Zitat Kis, T. (2003). Job-shop scheduling with processing alternatives. European Journal of Operational Research, 151(2), 307–332.CrossRef Kis, T. (2003). Job-shop scheduling with processing alternatives. European Journal of Operational Research, 151(2), 307–332.CrossRef
Zurück zum Zitat Ko, C. S., Kim, T., & Hwang, H. (2001). External partner selection using tabu search heuristics in distributed manufacturing. International Journal of Production Research, 39(17), 3959–3974.CrossRef Ko, C. S., Kim, T., & Hwang, H. (2001). External partner selection using tabu search heuristics in distributed manufacturing. International Journal of Production Research, 39(17), 3959–3974.CrossRef
Zurück zum Zitat Korytkowski, P., Rymaszewski, S., & Wisniewski, T. (2013). Ant colony optimization for job shop scheduling using multi-attribute dispatching rules. International Journal of Advanced Manufacturing Technology, 67(1–4), 231–241.CrossRef Korytkowski, P., Rymaszewski, S., & Wisniewski, T. (2013). Ant colony optimization for job shop scheduling using multi-attribute dispatching rules. International Journal of Advanced Manufacturing Technology, 67(1–4), 231–241.CrossRef
Zurück zum Zitat Kumar, M., & Rajotia, S. (2003). Integration of scheduling with computer aided process planning. Journal of Materials Processing Technology, 138(1–3), 297–300.CrossRef Kumar, M., & Rajotia, S. (2003). Integration of scheduling with computer aided process planning. Journal of Materials Processing Technology, 138(1–3), 297–300.CrossRef
Zurück zum Zitat Kumar, R., Tiwari, M. K., & Shankar, R. (2003). Scheduling of flexible manufacturing systems: An ant colony optimization approach. Proceedings of the Institution of Mechanical Engineers Part B-Journal of Engineering Manufacture, 217(10), 1443–1453.CrossRef Kumar, R., Tiwari, M. K., & Shankar, R. (2003). Scheduling of flexible manufacturing systems: An ant colony optimization approach. Proceedings of the Institution of Mechanical Engineers Part B-Journal of Engineering Manufacture, 217(10), 1443–1453.CrossRef
Zurück zum Zitat Lawrynowicz, A. (2008). Integration of production planning and scheduling using an expert system and a genetic algorithm. Journal of the Operational Research Society, 59(4), 455–463.CrossRef Lawrynowicz, A. (2008). Integration of production planning and scheduling using an expert system and a genetic algorithm. Journal of the Operational Research Society, 59(4), 455–463.CrossRef
Zurück zum Zitat Lee, H., & Kim, S.-S. (2001). Integration of process planning and scheduling using simulation based genetic algorithms. The International Journal of Advanced Manufacturing Technology, 18(8), 586–590.CrossRef Lee, H., & Kim, S.-S. (2001). Integration of process planning and scheduling using simulation based genetic algorithms. The International Journal of Advanced Manufacturing Technology, 18(8), 586–590.CrossRef
Zurück zum Zitat Leung, C. W., Wong, T. N., Mak, K. L., & Fung, R. Y. K. (2010). Integrated process planning and scheduling by an agent-based ant colony optimization. Computers and Industrial Engineering, 59(1), 166–180.CrossRef Leung, C. W., Wong, T. N., Mak, K. L., & Fung, R. Y. K. (2010). Integrated process planning and scheduling by an agent-based ant colony optimization. Computers and Industrial Engineering, 59(1), 166–180.CrossRef
Zurück zum Zitat Li, X., Gao, L., & Li, W. (2012). Application of game theory based hybrid algorithm for multi-objective integrated process planning and scheduling. Expert Systems with Applications, 39(1), 288–297.CrossRef Li, X., Gao, L., & Li, W. (2012). Application of game theory based hybrid algorithm for multi-objective integrated process planning and scheduling. Expert Systems with Applications, 39(1), 288–297.CrossRef
Zurück zum Zitat Li, X., Shao, X., Gao, L., & Qian, W. (2010). An effective hybrid algorithm for integrated process planning and scheduling. International Journal of Production Economics, 126(2), 289–298.CrossRef Li, X., Shao, X., Gao, L., & Qian, W. (2010). An effective hybrid algorithm for integrated process planning and scheduling. International Journal of Production Economics, 126(2), 289–298.CrossRef
Zurück zum Zitat Lin, C. W., Lin, Y. K., & Hsieh, H. T. (2013). Ant colony optimization for unrelated parallel machine scheduling. International Journal of Advanced Manufacturing Technology, 67(1–4), 35–45.CrossRef Lin, C. W., Lin, Y. K., & Hsieh, H. T. (2013). Ant colony optimization for unrelated parallel machine scheduling. International Journal of Advanced Manufacturing Technology, 67(1–4), 35–45.CrossRef
Zurück zum Zitat Liu, X.-J., Yi, H., & Ni, Z.-H. (2013). Application of ant colony optimization algorithm in process planning optimization. Journal of Intelligent Manufacturing, 24(1), 1–13.CrossRef Liu, X.-J., Yi, H., & Ni, Z.-H. (2013). Application of ant colony optimization algorithm in process planning optimization. Journal of Intelligent Manufacturing, 24(1), 1–13.CrossRef
Zurück zum Zitat Merkle, D., Middendorf, M., & Schmeck, H. (2002). Ant colony optimization for resource-constrained project scheduling. IEEE Transactions on Evolutionary Computation, 6(4), 333–346.CrossRef Merkle, D., Middendorf, M., & Schmeck, H. (2002). Ant colony optimization for resource-constrained project scheduling. IEEE Transactions on Evolutionary Computation, 6(4), 333–346.CrossRef
Zurück zum Zitat Morad, N., & Zalzala, A. (1999). Genetic algorithms in integrated process planning and scheduling. Journal of Intelligent Manufacturing, 10(2), 169–179.CrossRef Morad, N., & Zalzala, A. (1999). Genetic algorithms in integrated process planning and scheduling. Journal of Intelligent Manufacturing, 10(2), 169–179.CrossRef
Zurück zum Zitat Nasr, N., & Elsayed, E. A. (1990). Job shop scheduling with alternative machines. International Journal of Production Research, 28(9), 1595–1609.CrossRef Nasr, N., & Elsayed, E. A. (1990). Job shop scheduling with alternative machines. International Journal of Production Research, 28(9), 1595–1609.CrossRef
Zurück zum Zitat Palmer, G. J. (1996). A simulated annealing approach to integrated production scheduling. Journal of Intelligent Manufacturing, 7(3), 163–176.CrossRef Palmer, G. J. (1996). A simulated annealing approach to integrated production scheduling. Journal of Intelligent Manufacturing, 7(3), 163–176.CrossRef
Zurück zum Zitat Qiao, L. H., & Lv, S. P. (2012). An improved genetic algorithm for integrated process planning and scheduling. International Journal of Advanced Manufacturing Technology, 58(5–8), 727–740. Qiao, L. H., & Lv, S. P. (2012). An improved genetic algorithm for integrated process planning and scheduling. International Journal of Advanced Manufacturing Technology, 58(5–8), 727–740.
Zurück zum Zitat Seo, Y., & Egbelu, P. J. (1996). Process plan selection based on product mix and production volume. International Journal of Production Research, 34(9), 2639–2655.CrossRef Seo, Y., & Egbelu, P. J. (1996). Process plan selection based on product mix and production volume. International Journal of Production Research, 34(9), 2639–2655.CrossRef
Zurück zum Zitat Shao, X. Y., Li, X. Y., Gao, L., & Zhang, C. Y. (2009). Integration of process planning and scheduling—A modified genetic algorithm-based approach. Computers and Operations Research, 36(6), 2082–2096.CrossRef Shao, X. Y., Li, X. Y., Gao, L., & Zhang, C. Y. (2009). Integration of process planning and scheduling—A modified genetic algorithm-based approach. Computers and Operations Research, 36(6), 2082–2096.CrossRef
Zurück zum Zitat Stützle, T. (1997). MAX–MIN ant system for quadratic assignment problems: Technical report AIDA-97-4. FB Infomatik, TU Darmstadt, Germany: FG Intellektik. Stützle, T. (1997). MAX–MIN ant system for quadratic assignment problems: Technical report AIDA-97-4. FB Infomatik, TU Darmstadt, Germany: FG Intellektik.
Zurück zum Zitat Stützle, T., López-Ibánez, M., Pellegrini, P., Maur, M., de Oca, M. M., Birattari, M., et al. (2012). Parameter adaptation in ant colony optimization. In Autonomous search (pp. 191–215). Springer. Stützle, T., López-Ibánez, M., Pellegrini, P., Maur, M., de Oca, M. M., Birattari, M., et al. (2012). Parameter adaptation in ant colony optimization. In Autonomous search (pp. 191–215). Springer.
Zurück zum Zitat Tavares Neto, R., Godinho Filho, M., & da Silva, F. (2013). An ant colony optimization approach for the parallel machine scheduling problem with outsourcing allowed. Journal of Intelligent Manufacturing. doi:10.1007/s10845-013-0811-5. Tavares Neto, R., Godinho Filho, M., & da Silva, F. (2013). An ant colony optimization approach for the parallel machine scheduling problem with outsourcing allowed. Journal of Intelligent Manufacturing. doi:10.​1007/​s10845-013-0811-5.
Zurück zum Zitat Tehrani Nik Nejad, H., Sugimura, N., Iwamura, K., & Tanimizu, Y. (2010). Multi agent architecture for dynamic incremental process planning in the flexible manufacturing system. Journal of Intelligent Manufacturing, 21(4), 487–499.CrossRef Tehrani Nik Nejad, H., Sugimura, N., Iwamura, K., & Tanimizu, Y. (2010). Multi agent architecture for dynamic incremental process planning in the flexible manufacturing system. Journal of Intelligent Manufacturing, 21(4), 487–499.CrossRef
Zurück zum Zitat Usher, J. M. (2003). Negotiation-based routing in job shops via collaborative agents. Journal of Intelligent Manufacturing, 14(5), 485–499.CrossRef Usher, J. M. (2003). Negotiation-based routing in job shops via collaborative agents. Journal of Intelligent Manufacturing, 14(5), 485–499.CrossRef
Zurück zum Zitat Ventura, J., & Yoon, S.-H. (2013). A new genetic algorithm for lot-streaming flow shop scheduling with limited capacity buffers. Journal of Intelligent Manufacturing, 24(6), 1185–1196.CrossRef Ventura, J., & Yoon, S.-H. (2013). A new genetic algorithm for lot-streaming flow shop scheduling with limited capacity buffers. Journal of Intelligent Manufacturing, 24(6), 1185–1196.CrossRef
Zurück zum Zitat Wang, J., Fan, X., Zhang, C., & Wan, S. (2014). A graph-based ant colony optimization approach for integrated process planning and scheduling. Chinese Journal of Chemical Engineering, 22(7), 748–753.CrossRef Wang, J., Fan, X., Zhang, C., & Wan, S. (2014). A graph-based ant colony optimization approach for integrated process planning and scheduling. Chinese Journal of Chemical Engineering, 22(7), 748–753.CrossRef
Zurück zum Zitat Weintraub, A., Cormier, D., Hodgson, T., King, R., Wilson, J., & Zozom, A. (1999). Scheduling with alternatives: A link between process planning and scheduling. Iie Transactions, 31(11), 1093–1102. Weintraub, A., Cormier, D., Hodgson, T., King, R., Wilson, J., & Zozom, A. (1999). Scheduling with alternatives: A link between process planning and scheduling. Iie Transactions, 31(11), 1093–1102.
Zurück zum Zitat Wong, T. N., Leung, C. W., Mak, K. L., & Fung, R. Y. K. (2006a). An agent-based negotiation approach to integrate process planning and scheduling. International Journal of Production Research, 44(7), 1331–1351.CrossRef Wong, T. N., Leung, C. W., Mak, K. L., & Fung, R. Y. K. (2006a). An agent-based negotiation approach to integrate process planning and scheduling. International Journal of Production Research, 44(7), 1331–1351.CrossRef
Zurück zum Zitat Wong, T. N., Leung, C. W., Mak, K. L., & Fung, R. Y. K. (2006b). Dynamic shopfloor scheduling in multi-agent manufacturing systems. Expert Systems with Applications, 31(3), 486–494.CrossRef Wong, T. N., Leung, C. W., Mak, K. L., & Fung, R. Y. K. (2006b). Dynamic shopfloor scheduling in multi-agent manufacturing systems. Expert Systems with Applications, 31(3), 486–494.CrossRef
Zurück zum Zitat Wong, T. N., Leung, C. W., Mak, K. L., & Fung, R. Y. K. (2006c). Integrated process planning and scheduling/rescheduling—an agent-based approach. International Journal of Production Research, 44(18–19), 3627–3655. Wong, T. N., Leung, C. W., Mak, K. L., & Fung, R. Y. K. (2006c). Integrated process planning and scheduling/rescheduling—an agent-based approach. International Journal of Production Research, 44(18–19), 3627–3655.
Zurück zum Zitat Wong, T. N., Zhang, S. C., Wang, G., & Zhang, L. P. (2012). Integrated process planning and scheduling—Multi-agent system with two-stage ant colony optimisation algorithm. International Journal of Production Research, 50(21), 6188–6201.CrossRef Wong, T. N., Zhang, S. C., Wang, G., & Zhang, L. P. (2012). Integrated process planning and scheduling—Multi-agent system with two-stage ant colony optimisation algorithm. International Journal of Production Research, 50(21), 6188–6201.CrossRef
Zurück zum Zitat Wu, W.-H., Cheng, S.-R., Wu, C.-C., & Yin, Y. (2012). Ant colony algorithms for a two-agent scheduling with sum-of processing times-based learning and deteriorating considerations. Journal of Intelligent Manufacturing, 23(5), 1985–1993.CrossRef Wu, W.-H., Cheng, S.-R., Wu, C.-C., & Yin, Y. (2012). Ant colony algorithms for a two-agent scheduling with sum-of processing times-based learning and deteriorating considerations. Journal of Intelligent Manufacturing, 23(5), 1985–1993.CrossRef
Zurück zum Zitat Zhang, H. (2012a). Ant colony optimization for multimode resource-constrained project scheduling. Journal of Management in Engineering, 28(2), 150–159.CrossRef Zhang, H. (2012a). Ant colony optimization for multimode resource-constrained project scheduling. Journal of Management in Engineering, 28(2), 150–159.CrossRef
Zurück zum Zitat Zhang, S. (2012b). An enhanced ant colony optimization approach for integrating process planning and scheduling based on multi-agent system. (Master of Phylosophy M.Phil. thesis), The Uinversity of Hong Kong, Hong Kong SAR, China. Zhang, S. (2012b). An enhanced ant colony optimization approach for integrating process planning and scheduling based on multi-agent system. (Master of Phylosophy M.Phil. thesis), The Uinversity of Hong Kong, Hong Kong SAR, China.
Zurück zum Zitat Zhu, H. Y., Ye, W. H., & Bei, G. X. (2009, 26–29 Nov. 2009). A particle swarm optimization for integrated process planning and scheduling. Paper presented at the IEEE 10th international conference on computer-aided industrial design and conceptual design, 2009. CAID and CD 2009. Zhu, H. Y., Ye, W. H., & Bei, G. X. (2009, 26–29 Nov. 2009). A particle swarm optimization for integrated process planning and scheduling. Paper presented at the IEEE 10th international conference on computer-aided industrial design and conceptual design, 2009. CAID and CD 2009.
Metadaten
Titel
Integrated process planning and scheduling: an enhanced ant colony optimization heuristic with parameter tuning
verfasst von
S. Zhang
T. N. Wong
Publikationsdatum
20.12.2014
Verlag
Springer US
Erschienen in
Journal of Intelligent Manufacturing / Ausgabe 3/2018
Print ISSN: 0956-5515
Elektronische ISSN: 1572-8145
DOI
https://doi.org/10.1007/s10845-014-1023-3

Weitere Artikel der Ausgabe 3/2018

Journal of Intelligent Manufacturing 3/2018 Zur Ausgabe

    Marktübersichten

    Die im Laufe eines Jahres in der „adhäsion“ veröffentlichten Marktübersichten helfen Anwendern verschiedenster Branchen, sich einen gezielten Überblick über Lieferantenangebote zu verschaffen.