Skip to main content

2009 | OriginalPaper | Buchkapitel

Recoverable Robustness in Shunting and Timetabling

verfasst von : Serafino Cicerone, Gianlorenzo D’Angelo, Gabriele Di Stefano, Daniele Frigioni, Alfredo Navarra, Michael Schachtebeck, Anita Schöbel

Erschienen in: Robust and Online Large-Scale Optimization

Verlag: Springer Berlin Heidelberg

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

In practical optimization problems, disturbances to a given instance are unavoidable due to unpredictable events which can occur when the system is running. In order to face these situations, many approaches have been proposed during the last years in the area of robust optimization. The basic idea of

robustness

is to provide a solution which is able to keep feasibility even if the input instance is disturbed, at the cost of optimality. However, the notion of robustness in every day life is much broader than that pursued in the area of robust optimization so far. In fact, robustness is not always suitable unless some

recovery strategies

are introduced. Recovery strategies are some capabilities that can be used when disturbing events occur, in order to keep the feasibility of the pre-computed solution. This suggests to study robustness and recoverability in a unified framework. Recently, a first tentative of unifying the notions of robustness and recoverability into a new integrated notion of

recoverable robustness

has been done in the context of railway optimization.

In this paper, we review the recent algorithmic results achieved within the recoverable robustness model in order to evaluate the effectiveness of this model. To this aim, we concentrate our attention on two problems arising in the area of railway optimization: the

shunting

problem and the

timetabling

problem. The former problem regards the reordering of freight train cars over hump yards while the latter one consists in finding passenger train timetables in order to minimize the overall passengers traveling time. We also report on a generalization of recoverable robustness called

multi-stage recoverable robustness

which aims to extend recoverable robustness when multiple recovery phases are required.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Metadaten
Titel
Recoverable Robustness in Shunting and Timetabling
verfasst von
Serafino Cicerone
Gianlorenzo D’Angelo
Gabriele Di Stefano
Daniele Frigioni
Alfredo Navarra
Michael Schachtebeck
Anita Schöbel
Copyright-Jahr
2009
Verlag
Springer Berlin Heidelberg
DOI
https://doi.org/10.1007/978-3-642-05465-5_2