Skip to main content

2021 | OriginalPaper | Buchkapitel

2. The Concept of Risk Management

verfasst von : Konstantinos Tzanakakis

Erschienen in: Managing Risks in the Railway System

Verlag: Springer International Publishing

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

Risk management is a key element of all Organizations’ strategic management. Proper risk management increases the likelihood of success and helps Organizations achieve their overall goals. The alternative to risk management is risky management. An overview of the current frameworks for risk management around the world are presented: in the Civil Aviation Sector, the Enterprise Risk Management, the Project Management Institute (PMI), the Intergovernmental Organization for International Carriage by Rail (OTIF) and the risk management framework in different countries: the UK, the European Union, the USA, Japan, Canada and Australia/New Zealand. A comparison of those risk management frameworks is provided. Finally, managing changes, the “change management process” aimed at ensuring that changes are implemented in a safe manner and ensuring that the Infrastructure Managers or Train Operating Companies (Railway Undertakings) continue to comply with the legal framework as also their certification conditions and restrictions will be discussed. By reading this chapter, you will understand why we need risk management and recognize that there are different approaches on how to manage risks and how an effective “change management process” will assist Infrastructure Managers or Train Operating Companies (Railway Undertakings) in the decision-making process.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Fußnoten
1
As per ISO 31000, Risk management refers to a “coordinated application of resources to minimise, monitor, and control the probability and/ or impact of unfortunate events or to maximise the realisation of opportunities”.
 
4
A condition having an effect on the aeroplane and/or its occupants, either direct or consequential, which is caused or contributed to by one or more failures or errors, considering the flight phase and relevant adverse operational or environmental conditions.
 
6
CSM RA: common safety method (CSM) for risk evaluation and assessment, see Sect. ‎2.1.12.2.
 
8
The standard is available at http://​www.​airmic.​com/​
 
9
According to ISO definition, in some industries, risk financing refers to funding only the consequences related to the risk and not the risk management.
 
10
Silo mentality is an attitude that is found in some organizations; it occurs when several departments or groups within an organization do not want to share information or knowledge with other individuals in the same organization.
 
11
The Committee of Sponsoring Organizations of the Treadway Commission (COSO) is a joint initiative of five private sector organizations and is dedicated to providing thought leadership through the development of frameworks and guidance on enterprise risk management, internal control and fraud deterrence.
 
12
COSO was not the first to publish practical guidance on an enterprise wide approach to risk management. The first edition of the joint Australian/New Zealand Standard for Risk Management was published in 1995. A further edition, published in 1999, provides guidance on how to establish and implement an enterprise wide risk management process.
 
14
Next, an overview of the regulations related to the common safety method (CSM) for risk evaluation and assessment (CSM RA) is given:
• Commission Implementing Regulation (EU) 402/2013 (the Regulation on a common safety method (CSM) for risk evaluation and assessment (or ‘the CSM RA’)) came into force on 30 April 2013. It is a framework that describes a common mandatory European risk management process for the rail industry and does not prescribe specific tools or techniques to be used.
• Commission Regulation (EC) 352/2009, which was in force since 1 July 2010, was repealed on 21 May 2015 when Implementing Regulation (EU) 402/2013 started to apply. However, the provisions of 352/2009 will continue to apply in relation to projects which are at an advanced stage of development.
• Commission Implementing Regulation (EU) 2015/1136 was adopted by the European Commission on 13 July 2015 and amends Implementing Regulation (EU) No 402/2013.
 
15
Common safety method for risk evaluation and assessment (CSM RA).
 
16
CSM for risk evaluation and assessment.
 
17
Proposer is a person making the change (technical, operational or Organizational change).
 
18
A proposer is a person making the change.
 
19
A record of who attended the hazard identification workshop, or otherwise took part in the classification, will help demonstrate that the requirement to apply expert judgement has been met.
 
20
This is analogous to the field of medicine where treatments are the available therapeutic options for disease management, while risk controls are the specific care plan the physician has selected from the available treatment options.
 
21
Staff turnover refers to the number or percentage of workers who leave an organization and are replaced by new employees.
 
22
Lead time is the time between the original development of the consultation plan and its actual issue.
 
23
For example, a change may reduce risk to a group, but introduce or increase risk to another group or an individual. In such circumstances there is a need to balance the risks affecting each group so that one group does not suffer very high levels of residual risk to reduce or remove the risk to the other.
 
Literatur
1.
Zurück zum Zitat Shortreed J, Hicks J, Craig L (2003) Basic Frameworks for Risk Management, Final Report. Prepared for The Ontario Ministry of the Environment, Network for Environmental Risk Assessment and Management (NERAM) Shortreed J, Hicks J, Craig L (2003) Basic Frameworks for Risk Management, Final Report. Prepared for The Ontario Ministry of the Environment, Network for Environmental Risk Assessment and Management (NERAM)
2.
Zurück zum Zitat Standards Australia/Standards New Zealand (2005) Risk management guidelines—companion to AS/NZS 4360:2004 Standards Australia/Standards New Zealand (2005) Risk management guidelines—companion to AS/NZS 4360:2004
3.
Zurück zum Zitat Thornton G (2017) Risk frameworks—driving business strategy with effective risk frameworks Thornton G (2017) Risk frameworks—driving business strategy with effective risk frameworks
4.
Zurück zum Zitat European Union Agency for Railways (2017) ‘Safety Critical Components” in railways—the concept of “Safety Criticality” of the systems, Draft Report V0.1 European Union Agency for Railways (2017) ‘Safety Critical Components” in railways—the concept of “Safety Criticality” of the systems, Draft Report V0.1
5.
Zurück zum Zitat ISO 31000, Risk management—principles and guidelines, 2009 ISO 31000, Risk management—principles and guidelines, 2009
6.
Zurück zum Zitat PMI (Project Management Institute) (2009) Practice standard for project risk management, PMI PMI (Project Management Institute) (2009) Practice standard for project risk management, PMI
7.
Zurück zum Zitat PMI (Project Management Institute) (2017) A guide to the project management body of knowledge (PMBOK® Guide), 6th edn. PMI PMI (Project Management Institute) (2017) A guide to the project management body of knowledge (PMBOK® Guide), 6th edn. PMI
8.
Zurück zum Zitat Remzi A, Besarta V (2017) Analysis of international risk management standards (advantages and disadvantages). Eur J Res Reflection Manag Sci 5(3) Remzi A, Besarta V (2017) Analysis of international risk management standards (advantages and disadvantages). Eur J Res Reflection Manag Sci 5(3)
9.
Zurück zum Zitat Committee of Sponsoring Organizations of the Treadway Commission (COSO) (2004) Enterprise risk management—integrated framework Committee of Sponsoring Organizations of the Treadway Commission (COSO) (2004) Enterprise risk management—integrated framework
10.
Zurück zum Zitat Intergovernmental Organization for International Carriage by Rail (OTIF) (2016) Uniform Technical Prescription—Common Safety Method on risk evaluation and assessment (UTP GEN-G consolidated version), 12 Jan 2016 Intergovernmental Organization for International Carriage by Rail (OTIF) (2016) Uniform Technical Prescription—Common Safety Method on risk evaluation and assessment (UTP GEN-G consolidated version), 12 Jan 2016
11.
Zurück zum Zitat The Chartered Institute of Management Accountants (CIMA) (2008) Enterprise risk management—Topic Gateway Series No. 49 The Chartered Institute of Management Accountants (CIMA) (2008) Enterprise risk management—Topic Gateway Series No. 49
12.
Zurück zum Zitat Australian/New Zealand Standard, AS/NZS 4360 SET Risk Management, 2004 Australian/New Zealand Standard, AS/NZS 4360 SET Risk Management, 2004
13.
Zurück zum Zitat British Standard, BS 6079-3:2000/Project management. Guide to the management of business related project risk, 2000 British Standard, BS 6079-3:2000/Project management. Guide to the management of business related project risk, 2000
14.
Zurück zum Zitat The Institute of Risk Management, A Risk Management Standard (IRM/Alarm/AIRMIC) 2002 The Institute of Risk Management, A Risk Management Standard (IRM/Alarm/AIRMIC) 2002
15.
Zurück zum Zitat REGULATION (EU) No 402/2013 Common safety method for risk evaluation and assessment…, 2013 REGULATION (EU) No 402/2013 Common safety method for risk evaluation and assessment…, 2013
16.
Zurück zum Zitat ORR (Office of Rail and Road), (UK), Common Safety Method for risk evaluation and assessment—Guidance on the application of Commission Regulation (EU) 402/2013, March 2015 ORR (Office of Rail and Road), (UK), Common Safety Method for risk evaluation and assessment—Guidance on the application of Commission Regulation (EU) 402/2013, March 2015
18.
Zurück zum Zitat CENELEC EN 50126-1:2017—Railway Applications: The Specification and Demonstration of Reliability, Availability, Maintainability and Safety (RAMS). Generic RAMS Process CENELEC EN 50126-1:2017—Railway Applications: The Specification and Demonstration of Reliability, Availability, Maintainability and Safety (RAMS). Generic RAMS Process
19.
Zurück zum Zitat The Association of Insurance & Risk Managers (AIRMIC) (2005) An overview comparison of the AIRMIC/ALARM/ IRM Risk Management Standard with: the Australia/New Zealand Standard AS/NZS 4360:2004, the COSO Enterprise Risk Management—Integrated Framework The Association of Insurance & Risk Managers (AIRMIC) (2005) An overview comparison of the AIRMIC/ALARM/ IRM Risk Management Standard with: the Australia/New Zealand Standard AS/NZS 4360:2004, the COSO Enterprise Risk Management—Integrated Framework
20.
Zurück zum Zitat AIRMIC/ALARM/IRM Risk Management Standard, 2002 (Institute of Risk Management (IRM), The Association of Insurance and Risk Manager (AIRMIC) and The Public Risk Management Association (ALARM)) AIRMIC/ALARM/IRM Risk Management Standard, 2002 (Institute of Risk Management (IRM), The Association of Insurance and Risk Manager (AIRMIC) and The Public Risk Management Association (ALARM))
21.
Zurück zum Zitat Office of the National Safety Regulator (Australia) (2013) Guideline for Preparation of a Safety Management System Office of the National Safety Regulator (Australia) (2013) Guideline for Preparation of a Safety Management System
22.
Zurück zum Zitat Weeserik BP, Spruit M (2018) Improving operational risk management using business performance management technologies. Department of Information and Computing Sciences, Utrecht Organization, MDPI, Basel, Switzerland Weeserik BP, Spruit M (2018) Improving operational risk management using business performance management technologies. Department of Information and Computing Sciences, Utrecht Organization, MDPI, Basel, Switzerland
Metadaten
Titel
The Concept of Risk Management
verfasst von
Konstantinos Tzanakakis
Copyright-Jahr
2021
DOI
https://doi.org/10.1007/978-3-030-66266-0_2

    Premium Partner