Skip to main content
Erschienen in: Water Resources Management 15/2014

01.12.2014

Research on Joint Impoundment Dispatching Model for Cascade Reservoir

verfasst von: Xuemin Wang, Jianzhong Zhou, Shuo Ouyang, Chunlong Li

Erschienen in: Water Resources Management | Ausgabe 15/2014

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

As more and more large reservoirs been built, competitive impoundment problem of cascade reservoirs becomes a serious matter in the flood recession. Combining the impounding principle with K value discriminant method, a novel impounding strategy of cascade reservoirs is proposed for determining the impoundment sequence and opportunity of each reservoir in premise of the flood control safety. At the same time, the impounding water level control lines of different frequency runoff are drawn according to the flood routing simulation, and then the Impounding Operation Chart (IOC) is manufactured. On this basis, a model of impoundment dispatching in advance based on the IOC is developed. Then the proposed method can be obviously accelerated by using Self-adaptive Electromagnetism-like Mechanism algorithm (SEM). Compared with the original design of impounding scheme, the result indicates that the optimal scheme can improve the fill storage ratio of cascade reservoirs and ease the contradiction between supply and demand of water resources as well with guaranteeing the safety of flood control in the watershed.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Literatur
Zurück zum Zitat Chen J (2010) Discussion on the unified water storage of the reservoirs in Yangtze River basin. China Water Resour :10–13 (in Chinese) Chen J (2010) Discussion on the unified water storage of the reservoirs in Yangtze River basin. China Water Resour :10–13 (in Chinese)
Zurück zum Zitat Gol Alikhani M, Javadian N, Tavakkoli-Moghaddam R (2009) A novel hybrid approach combining electromagnetism-like method with Solis and Wets local search for continuous optimization problems. J Glob Optim 44:227–234. doi:10.1007/s10898-008-9320-z CrossRef Gol Alikhani M, Javadian N, Tavakkoli-Moghaddam R (2009) A novel hybrid approach combining electromagnetism-like method with Solis and Wets local search for continuous optimization problems. J Glob Optim 44:227–234. doi:10.​1007/​s10898-008-9320-z CrossRef
Zurück zum Zitat Li Y, Gan F, Deng J (2006) Preliminary study on impounding water of Three Gorges Project in September. Shuili Fadian Xuebao/J Hydroelec Eng 25:61–66 Li Y, Gan F, Deng J (2006) Preliminary study on impounding water of Three Gorges Project in September. Shuili Fadian Xuebao/J Hydroelec Eng 25:61–66
Zurück zum Zitat Peng Y, Li Y-T, Zhang H-W (2003) Study on the impounding time and objective decision of the Three Gorges Project at the end of flood period. Shuikexue Jinzhan/Adv Water Sci 14:682–689 Peng Y, Li Y-T, Zhang H-W (2003) Study on the impounding time and objective decision of the Three Gorges Project at the end of flood period. Shuikexue Jinzhan/Adv Water Sci 14:682–689
Zurück zum Zitat Wang DB (1991) A method of compensated regulation calculation for a group of hydropower stations improved criterion for mula method. Water Resour Power 9:130–136 (in Chinese) Wang DB (1991) A method of compensated regulation calculation for a group of hydropower stations improved criterion for mula method. Water Resour Power 9:130–136 (in Chinese)
Zurück zum Zitat Xiaohua D, Ji L, Yinghai L, Huijuan B, Xia D (2010) Dynamic application and risk analysis of flood control water level to the Three Gorges Reservoir by utilizing mid-term inflow forecasts. In: Power and energy engineering conference (APPEEC), 2010 Asia-Pacific, 28–31 March 2010. pp 1–5. doi:10.1109/appeec.2010.5449235 Xiaohua D, Ji L, Yinghai L, Huijuan B, Xia D (2010) Dynamic application and risk analysis of flood control water level to the Three Gorges Reservoir by utilizing mid-term inflow forecasts. In: Power and energy engineering conference (APPEEC), 2010 Asia-Pacific, 28–31 March 2010. pp 1–5. doi:10.​1109/​appeec.​2010.​5449235
Zurück zum Zitat Zhang YP, Wang GL, Peng Y, Zhou HC (2011) Risk analysis of dynamic control of reservoir limited water level by considering flood forecast error. Sci China Technol Sci 54:1888–1893. doi:10.1007/s11431-011-4392-2 CrossRef Zhang YP, Wang GL, Peng Y, Zhou HC (2011) Risk analysis of dynamic control of reservoir limited water level by considering flood forecast error. Sci China Technol Sci 54:1888–1893. doi:10.​1007/​s11431-011-4392-2 CrossRef
Zurück zum Zitat Zhou J, Ouyang S, Wang X, Ye L, Wang H (2014) Multi-objective parameter calibration and multi-attribute decision-making: an application to conceptual hydrological model calibration. Water Resour Manag 28:767–783. doi:10.1007/s11269-014-0514-5 CrossRef Zhou J, Ouyang S, Wang X, Ye L, Wang H (2014) Multi-objective parameter calibration and multi-attribute decision-making: an application to conceptual hydrological model calibration. Water Resour Manag 28:767–783. doi:10.​1007/​s11269-014-0514-5 CrossRef
Metadaten
Titel
Research on Joint Impoundment Dispatching Model for Cascade Reservoir
verfasst von
Xuemin Wang
Jianzhong Zhou
Shuo Ouyang
Chunlong Li
Publikationsdatum
01.12.2014
Verlag
Springer Netherlands
Erschienen in
Water Resources Management / Ausgabe 15/2014
Print ISSN: 0920-4741
Elektronische ISSN: 1573-1650
DOI
https://doi.org/10.1007/s11269-014-0820-y

Weitere Artikel der Ausgabe 15/2014

Water Resources Management 15/2014 Zur Ausgabe