Skip to main content

2013 | OriginalPaper | Buchkapitel

nZEB Case Studies

verfasst von : Jarek Kurnitski, Matthias Achermann, Jonas Gräslund, Oscar Hernandez, Wim Zeiler

Erschienen in: Cost Optimal and Nearly Zero-Energy Buildings (nZEB)

Verlag: Springer London

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

There already exist pilot projects across Europe, which may be called nZEB buildings. They are not easy to compare because of variation in the definitions and performance levels—nZEB definitions have not yet been available when these buildings have been designed. It is important to check which energy uses are included in the calculated and measured energy performance and are the results reported as delivered or primary energy. Tenant’s electricity (appliances, lighting) is often not included. Simulated primary energy is typically between 50 and 100 kWh/(m2 a) for high-performance nZEB buildings with on-site renewable energy production if all energy uses are included. Such buildings may be extremely complicated, e.g. control of mixed mode ventilation or integrated energy supply solutions with storage and many operation modes. “Overkill” complexity may have implications on operation and maintenance as nobody cannot manage systems, which are not easy to control and operate. Another trend that can be seen is simple and reliable solutions based on high-performance components and careful system design and fitting with building properties. In the following, five nZEB buildings across the Europe are reported. Three of them are with measured energy data, indicating that strict targets are not always easy to achieve; however, some deviations have been caused also by unrealistic energy calculation input data. Technical solutions used show that there are many alternative ways to achieve high performance; however, strong differences in design bases and basic solutions in similar climate may also show that optimal solutions are always not known or found. Four first case studies are mostly focused on description of technical solutions, but the last one also describes the tuning of systems needed in the first year of operation to achieve the targets.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Metadaten
Titel
nZEB Case Studies
verfasst von
Jarek Kurnitski
Matthias Achermann
Jonas Gräslund
Oscar Hernandez
Wim Zeiler
Copyright-Jahr
2013
Verlag
Springer London
DOI
https://doi.org/10.1007/978-1-4471-5610-9_8