Skip to main content
Erschienen in: Journal of Intelligent Manufacturing 2/2021

13.06.2020

Preventive maintenance scheduling optimization based on opportunistic production-maintenance synchronization

verfasst von: Li Li, Yong Wang, Kuo-Yi Lin

Erschienen in: Journal of Intelligent Manufacturing | Ausgabe 2/2021

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

Equipment maintenance is momentous for improving production efficiency, how to integrate maintenance into production to address uncertain problems has attracted considerable attention. This paper addresses a novel approach for integrating preventive maintenance (PM) into production planning of a complex manufacturing system based on availability and cost. The proposed approach relies on two phases: firstly, this study predicts required capacity of each machine through extreme learning machine algorithm. Based on analyzing historical data, the opportunistic periods are calculated for implementing PM tasks to have less impact on production and obtain the PM interval and duration. Secondly, this study obtains the scheduling planning and the least number of maintenance personnel through an improved ant colony optimization algorithm. Finally, the feasibility and benefits of this approach are investigated based on empirical study by using historical data from real manufacturing execution system and equipment maintenance system. Experimental results demonstrate the effectiveness of proposed approach, reduce personnel number while guarantee the maintenance tasks. Therefore, the proposed approach is beneficial to improve the company’s production efficiency.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literatur
Zurück zum Zitat Ab-Samat, H., & Kamaruddin, S. (2014). Opportunistic maintenance (OM) as a new advancement in maintenance approaches: A review. Journal of Quality in Maintenance Engineering, 20(2), 98–121.CrossRef Ab-Samat, H., & Kamaruddin, S. (2014). Opportunistic maintenance (OM) as a new advancement in maintenance approaches: A review. Journal of Quality in Maintenance Engineering, 20(2), 98–121.CrossRef
Zurück zum Zitat Aizpurua, J. I., Catterson, V. M., Papadopoulos, Y., Chiacchio, F., & D’Urso, D. (2017). Supporting group maintenance through prognostics-enhanced dynamic dependability prediction. Reliability Engineering & System Safety, 168, 171–188.CrossRef Aizpurua, J. I., Catterson, V. M., Papadopoulos, Y., Chiacchio, F., & D’Urso, D. (2017). Supporting group maintenance through prognostics-enhanced dynamic dependability prediction. Reliability Engineering & System Safety, 168, 171–188.CrossRef
Zurück zum Zitat Barlow, R., & Hunter, L. (1960). Optimum preventive maintenance policies. Operations research, 8(1), 90–100.CrossRef Barlow, R., & Hunter, L. (1960). Optimum preventive maintenance policies. Operations research, 8(1), 90–100.CrossRef
Zurück zum Zitat Berenguer, C., Chu, C., & Grall, A. (1997). Inspection and maintenance planning: An application of semi-Markov decision processes. Journal of intelligent manufacturing, 8(5), 467–476.CrossRef Berenguer, C., Chu, C., & Grall, A. (1997). Inspection and maintenance planning: An application of semi-Markov decision processes. Journal of intelligent manufacturing, 8(5), 467–476.CrossRef
Zurück zum Zitat Boland, P. J. (1982). Periodic replacement when minimal repair costs vary with time. Naval Research Logistics Quarterly, 29(4), 541–546.CrossRef Boland, P. J. (1982). Periodic replacement when minimal repair costs vary with time. Naval Research Logistics Quarterly, 29(4), 541–546.CrossRef
Zurück zum Zitat Butollo, F. & Lüthje, B. (2017). ‘Made in China 2025’: Intelligent manufacturing and work. The new digital workplace. How new technologies revolutionise work, pp. 42–61. Butollo, F. & Lüthje, B. (2017). ‘Made in China 2025’: Intelligent manufacturing and work. The new digital workplace. How new technologies revolutionise work, pp. 42–61.
Zurück zum Zitat Canfield, R. V. (1986). Cost optimization of periodic preventive maintenance. IEEE Transactions on Reliability, 35(1), 78–81.CrossRef Canfield, R. V. (1986). Cost optimization of periodic preventive maintenance. IEEE Transactions on Reliability, 35(1), 78–81.CrossRef
Zurück zum Zitat Chalabi, N., Dahane, M., Beldjilali, B., & Neki, A. (2016). Optimisation of preventive maintenance grouping strategy for multicomponent series systems: Particle swarm based approach. Computers and Industrial Engineering, 102, 440–451.CrossRef Chalabi, N., Dahane, M., Beldjilali, B., & Neki, A. (2016). Optimisation of preventive maintenance grouping strategy for multicomponent series systems: Particle swarm based approach. Computers and Industrial Engineering, 102, 440–451.CrossRef
Zurück zum Zitat Colorni, A., Dorigo, M., Maniezzo, V., et al. (1992). Distributed optimization by ant colonies. In: Proceedings of the first European conference on artificial life (Vol. 142, pp. 134–142). Cambridge, MA. Colorni, A., Dorigo, M., Maniezzo, V., et al. (1992). Distributed optimization by ant colonies. In: Proceedings of the first European conference on artificial life (Vol. 142, pp. 134–142). Cambridge, MA.
Zurück zum Zitat Van Do, P., Barros, A., Bérenguer, C., Bouvard, K., & Brissaud, F. (2013). Dynamic grouping maintenance with time limited opportunities. Reliability Engineering and System Safety, 120, 51–59.CrossRef Van Do, P., Barros, A., Bérenguer, C., Bouvard, K., & Brissaud, F. (2013). Dynamic grouping maintenance with time limited opportunities. Reliability Engineering and System Safety, 120, 51–59.CrossRef
Zurück zum Zitat Fitouhi, M.-C., & Nourelfath, M. (2012). Integrating noncyclical preventive maintenance scheduling and production planning for a single machine. International Journal of Production Economics, 136(2), 344–351.CrossRef Fitouhi, M.-C., & Nourelfath, M. (2012). Integrating noncyclical preventive maintenance scheduling and production planning for a single machine. International Journal of Production Economics, 136(2), 344–351.CrossRef
Zurück zum Zitat Huang, G.-B., Zhou, H., Ding, X., & Zhang, R. (2011). Extreme learning machine for regression and multiclass classification. IEEE Transactions on Systems, Man, and Cybernetics Part B (Cybernetics), 42(2), 513–529.CrossRef Huang, G.-B., Zhou, H., Ding, X., & Zhang, R. (2011). Extreme learning machine for regression and multiclass classification. IEEE Transactions on Systems, Man, and Cybernetics Part B (Cybernetics), 42(2), 513–529.CrossRef
Zurück zum Zitat Huang, G.-B., Zhu, Q.-Y., & Siew, C.-K. (2006). Extreme learning machine: theory and applications. Neurocomputing, 70(1–3), 489–501.CrossRef Huang, G.-B., Zhu, Q.-Y., & Siew, C.-K. (2006). Extreme learning machine: theory and applications. Neurocomputing, 70(1–3), 489–501.CrossRef
Zurück zum Zitat Jezzini, A., Ayache, M., Elkhansa, L., Makki, B., & Zein, M. (2013). Effects of predictive maintenance (PdM), Proactive maintenace (PoM) and Preventive maintenance (PM) on minimizing the faults in medical instruments. In: 2013 2nd International conference on advances in biomedical engineering (pp. 53–56). IEEE. Jezzini, A., Ayache, M., Elkhansa, L., Makki, B., & Zein, M. (2013). Effects of predictive maintenance (PdM), Proactive maintenace (PoM) and Preventive maintenance (PM) on minimizing the faults in medical instruments. In: 2013 2nd International conference on advances in biomedical engineering (pp. 53–56). IEEE.
Zurück zum Zitat Ji, M., He, Y., & Cheng, T. E. (2007). Single-machine scheduling with periodic maintenance to minimize makespan. Computers and operations research, 34(6), 1764–1770.CrossRef Ji, M., He, Y., & Cheng, T. E. (2007). Single-machine scheduling with periodic maintenance to minimize makespan. Computers and operations research, 34(6), 1764–1770.CrossRef
Zurück zum Zitat Keizer, M. C. O., Flapper, S. D. P., & Teunter, R. H. (2017). Conditionbased maintenance policies for systems with multiple dependent components: A review. European Journal of Operational Research, 261(2), 405–420.CrossRef Keizer, M. C. O., Flapper, S. D. P., & Teunter, R. H. (2017). Conditionbased maintenance policies for systems with multiple dependent components: A review. European Journal of Operational Research, 261(2), 405–420.CrossRef
Zurück zum Zitat Lasi, H., Fettke, P., Kemper, H.-G., Feld, T., & Hoffmann, M. (2014). Industry 4.0. Business and Information Systems Engineering, 6(4), 239–242.CrossRef Lasi, H., Fettke, P., Kemper, H.-G., Feld, T., & Hoffmann, M. (2014). Industry 4.0. Business and Information Systems Engineering, 6(4), 239–242.CrossRef
Zurück zum Zitat Lee, J., Bagheri, B., & Kao, H.-A. (2015). A cyber-physical systems architecture for industry 4.0-based manufacturing systems. Manufacturing Letters, 3, 18–23.CrossRef Lee, J., Bagheri, B., & Kao, H.-A. (2015). A cyber-physical systems architecture for industry 4.0-based manufacturing systems. Manufacturing Letters, 3, 18–23.CrossRef
Zurück zum Zitat Li, L. (2018). China’s manufacturing locus in 2025: With a comparison of “Made-in-China 2025” and “Industry 4.0”. Technological Forecasting and Social Change, 135, 66–74.CrossRef Li, L. (2018). China’s manufacturing locus in 2025: With a comparison of “Made-in-China 2025” and “Industry 4.0”. Technological Forecasting and Social Change, 135, 66–74.CrossRef
Zurück zum Zitat Lin, K.-Y. (2018). User experience-based product design for smart production to empower industry 4.0 in the glass recycling circular economy. Computers and Industrial Engineering, 125, 729–738.CrossRef Lin, K.-Y. (2018). User experience-based product design for smart production to empower industry 4.0 in the glass recycling circular economy. Computers and Industrial Engineering, 125, 729–738.CrossRef
Zurück zum Zitat Lin, Z.-L., Huang, Y.-S., & Fang, C.-C. (2015). Non-periodic preventive maintenance with reliability thresholds for complex repairable systems. Reliability Engineering and System Safety, 136, 145–156.CrossRef Lin, Z.-L., Huang, Y.-S., & Fang, C.-C. (2015). Non-periodic preventive maintenance with reliability thresholds for complex repairable systems. Reliability Engineering and System Safety, 136, 145–156.CrossRef
Zurück zum Zitat Nakagawa, T. (1986). Periodic and sequential preventive maintenance policies. Journal of Applied Probability, 23(2), 536–542.CrossRef Nakagawa, T. (1986). Periodic and sequential preventive maintenance policies. Journal of Applied Probability, 23(2), 536–542.CrossRef
Zurück zum Zitat Pereira, C. M., Lapa, C. M., Mol, A. C., & Da Luz, A. F. (2010). A particle swarm optimization (pso) approach for non-periodic preventive maintenance scheduling programming. Progress in Nuclear Energy, 52(8), 710–714.CrossRef Pereira, C. M., Lapa, C. M., Mol, A. C., & Da Luz, A. F. (2010). A particle swarm optimization (pso) approach for non-periodic preventive maintenance scheduling programming. Progress in Nuclear Energy, 52(8), 710–714.CrossRef
Zurück zum Zitat Reinelt, G. (1991). TSPLIB’A traveling salesman problem library. ORSA Journal on Computing, 3(4), 376–384.CrossRef Reinelt, G. (1991). TSPLIB’A traveling salesman problem library. ORSA Journal on Computing, 3(4), 376–384.CrossRef
Zurück zum Zitat Saaksvuori, A., & Immonen, A. (2008). Product lifecycle management. Berlin: Springer.CrossRef Saaksvuori, A., & Immonen, A. (2008). Product lifecycle management. Berlin: Springer.CrossRef
Zurück zum Zitat Sheikhalishahi, M., Azadeh, A., & Pintelon, L. (2017). Dynamic maintenance planning approach by considering grouping strategy and human factors. Process Safety and Environmental Protection, 107, 289–298.CrossRef Sheikhalishahi, M., Azadeh, A., & Pintelon, L. (2017). Dynamic maintenance planning approach by considering grouping strategy and human factors. Process Safety and Environmental Protection, 107, 289–298.CrossRef
Zurück zum Zitat Stark, J. (2015). Product lifecycle management. In: Product lifecycle management (Vol. 1, pp. 1–29). Springer, Cham. Stark, J. (2015). Product lifecycle management. In: Product lifecycle management (Vol. 1, pp. 1–29). Springer, Cham.
Zurück zum Zitat Valdez, F., Moreno, F., & Melin, P. (2020). A Comparison of ACO, GA and SA for Solving the TSP Problem. In: Hybrid intelligent systems in control, pattern recognition and medicine (pp. 181–189). Springer, Cham. Valdez, F., Moreno, F., & Melin, P. (2020). A Comparison of ACO, GA and SA for Solving the TSP Problem. In: Hybrid intelligent systems in control, pattern recognition and medicine (pp. 181–189). Springer, Cham.
Zurück zum Zitat van Lier, B. (2014). Developing the industrial internet of things with a network centric approach: A holistic scientific perspective on smart industries. In: 2014 18th International conference on system theory, control and computing (ICSTCC) (pp. 324–329). IEEE. van Lier, B. (2014). Developing the industrial internet of things with a network centric approach: A holistic scientific perspective on smart industries. In: 2014 18th International conference on system theory, control and computing (ICSTCC) (pp. 324–329). IEEE.
Zurück zum Zitat Venkataraman, V. (2007). Maintenance engineering and management. New Delhi: PHI Learning Pvt. Ltd. Venkataraman, V. (2007). Maintenance engineering and management. New Delhi: PHI Learning Pvt. Ltd.
Zurück zum Zitat Vu, H. C., Do, P., Barros, A., & Berenguer, C. (2014). Maintenance grouping strategy for multi-component systems with dynamic contexts. Reliability Engineering and System Safety, 132, 233–249.CrossRef Vu, H. C., Do, P., Barros, A., & Berenguer, C. (2014). Maintenance grouping strategy for multi-component systems with dynamic contexts. Reliability Engineering and System Safety, 132, 233–249.CrossRef
Zurück zum Zitat Wübbeke, J., Meissner, M., Zenglein, M. J., Ives, J., & Conrad, B. (2016). Made in China 2025: The making of a high-tech superpower and consequences for industrial countries. Mercator Institute for China Studies, 17, 2017–09. Wübbeke, J., Meissner, M., Zenglein, M. J., Ives, J., & Conrad, B. (2016). Made in China 2025: The making of a high-tech superpower and consequences for industrial countries. Mercator Institute for China Studies, 17, 2017–09.
Zurück zum Zitat Xia, T., Jin, X., Xi, L., & Ni, J. (2015). Production-driven opportunistic maintenance for batch production based on MAM-APB scheduling. European Journal of Operational Research, 240(3), 781–790.CrossRef Xia, T., Jin, X., Xi, L., & Ni, J. (2015). Production-driven opportunistic maintenance for batch production based on MAM-APB scheduling. European Journal of Operational Research, 240(3), 781–790.CrossRef
Zurück zum Zitat Yak, Y., Forward, K., & Dillon, T. (1985). Modelling the effect of transient faults in fault tolerant computer systems. IFAC Proceedings Volumes, 18(12), 129–133.CrossRef Yak, Y., Forward, K., & Dillon, T. (1985). Modelling the effect of transient faults in fault tolerant computer systems. IFAC Proceedings Volumes, 18(12), 129–133.CrossRef
Zurück zum Zitat Zhou, X., & Shi, K. (2019). Capacity failure rate based opportunistic maintenance modeling for series-parallel multi-station manufacturing systems. Reliability Engineering and System Safety, 181, 46–53.CrossRef Zhou, X., & Shi, K. (2019). Capacity failure rate based opportunistic maintenance modeling for series-parallel multi-station manufacturing systems. Reliability Engineering and System Safety, 181, 46–53.CrossRef
Metadaten
Titel
Preventive maintenance scheduling optimization based on opportunistic production-maintenance synchronization
verfasst von
Li Li
Yong Wang
Kuo-Yi Lin
Publikationsdatum
13.06.2020
Verlag
Springer US
Erschienen in
Journal of Intelligent Manufacturing / Ausgabe 2/2021
Print ISSN: 0956-5515
Elektronische ISSN: 1572-8145
DOI
https://doi.org/10.1007/s10845-020-01588-9

Weitere Artikel der Ausgabe 2/2021

Journal of Intelligent Manufacturing 2/2021 Zur Ausgabe

    Marktübersichten

    Die im Laufe eines Jahres in der „adhäsion“ veröffentlichten Marktübersichten helfen Anwendern verschiedenster Branchen, sich einen gezielten Überblick über Lieferantenangebote zu verschaffen.