Skip to main content
Erschienen in: Rock Mechanics and Rock Engineering 7/2016

02.03.2016 | Original Paper

Probe Drilling Ahead of Two TBMs in Difficult Ground Conditions in Turkey

verfasst von: Nuh Bilgin, Ugur Ates

Erschienen in: Rock Mechanics and Rock Engineering | Ausgabe 7/2016

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

This paper summarizes the results of probe drilling carried out ahead of TBMs in two difficult tunneling projects in Turkey. The tunnels have completely different geological characteristics which necessitated two different methods of data analysis. Melen Water Tunnel was excavated under Istanbul Bosphorus within sedimentary rocks which are cut frequently by andesitic dykes, fracturing the surrounding rocks and creating a potential risk for water ingress into the tunnel. At the beginning of Melen Project, pioneering probe drillings with petrographic analysis and strength tests were performed on samples collected from TBM muck. This analysis allowed identifying some critical normalized probe drilling rate values for predicting potential weak zones created by andesitic dykes. These studies gave a sound basis for further interpretation of TBM and geologic data for the same tunnel. The second set of probe drilling analysis was from Kargi Tunnel. The North Anatolian Fault highly affected the tunnel excavation by fractured rock formations. Although the change in normalized probe drilling data was a good indicator of fractured zones, the diversity of rock formations made it difficult to interpret the data.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literatur
Zurück zum Zitat AFTES (2014) Forward probing ahead of tunnel boring machines. Tunnels espace Souterrain 2014:132–164 AFTES (2014) Forward probing ahead of tunnel boring machines. Tunnels espace Souterrain 2014:132–164
Zurück zum Zitat Anagnostou G, Ozdemir L, Bilgin N (2008) Greater Melen Project—Bosphorus Water Tunnel Report on the site visit of 27th June 2008 and on the first results of drilling data analysis, p 30 Anagnostou G, Ozdemir L, Bilgin N (2008) Greater Melen Project—Bosphorus Water Tunnel Report on the site visit of 27th June 2008 and on the first results of drilling data analysis, p 30
Zurück zum Zitat Anagnostou G (2010) Some rock mechanics aspects of subaqueous tunnels. Rock engineering in difficult ground conditions—soft rocks and Kars. In: Vrkljan (ed) Taylor & Francis Group, London, ISBN 978-0-415-80481-3, p 12 Anagnostou G (2010) Some rock mechanics aspects of subaqueous tunnels. Rock engineering in difficult ground conditions—soft rocks and Kars. In: Vrkljan (ed) Taylor & Francis Group, London, ISBN 978-0-415-80481-3, p 12
Zurück zum Zitat Bakir A, Eris I, Daglioglu S (2011) Probe drilling in Bosphorus Tunnel (SP-7). In: Proceedings for Atilla Yalcin Symposium, İstanbul, ITU, pp 72–82 Bakir A, Eris I, Daglioglu S (2011) Probe drilling in Bosphorus Tunnel (SP-7). In: Proceedings for Atilla Yalcin Symposium, İstanbul, ITU, pp 72–82
Zurück zum Zitat Bakir A, Eris I, Daglioglu S (2012) Interrelationships between TBM performance and probe drill data in Melen Water Tunnel (SP-7) in Istanbul. In: Proceedings of geomechanic, symposium for Mahir Vardar, Istanbul, ITU, pp 91–103 Bakir A, Eris I, Daglioglu S (2012) Interrelationships between TBM performance and probe drill data in Melen Water Tunnel (SP-7) in Istanbul. In: Proceedings of geomechanic, symposium for Mahir Vardar, Istanbul, ITU, pp 91–103
Zurück zum Zitat Barla G, Pelizza S (2000) TBM tunnelling in difficult ground conditions. Geoeng, Melbourne, p 21 Barla G, Pelizza S (2000) TBM tunnelling in difficult ground conditions. Geoeng, Melbourne, p 21
Zurück zum Zitat Bilgin N, Copur H, Balci C (2014) Mechanical excavation in mining and civil industries, 1st edn. CRC Press, New York Bilgin N, Copur H, Balci C (2014) Mechanical excavation in mining and civil industries, 1st edn. CRC Press, New York
Zurück zum Zitat De Graaf PJH, Bell FG (1997) The delivery tunnel North, Lesotho highlands water project. Geotech Geol Eng 15:95–120 De Graaf PJH, Bell FG (1997) The delivery tunnel North, Lesotho highlands water project. Geotech Geol Eng 15:95–120
Zurück zum Zitat Duke SK, Arabshani J (2007) Evaluating ground conditions ahead of a TBM using probe drill data. In: Rapid excavation and tunneling conference (RETC) Proceedings, pp 430–441 Duke SK, Arabshani J (2007) Evaluating ground conditions ahead of a TBM using probe drill data. In: Rapid excavation and tunneling conference (RETC) Proceedings, pp 430–441
Zurück zum Zitat Flury S, Priller A (2009) Successful penetration of the Piora Basic in the Faido Part-Section. Tunnel 4:15–18 Flury S, Priller A (2009) Successful penetration of the Piora Basic in the Faido Part-Section. Tunnel 4:15–18
Zurück zum Zitat Henke A (2005) Experience from the ground probing in the Gothard-Base Tunnel and their applicability in the Gibraltar Strait Crossing. IV UN-ITA Workshop Gibraltar Strait Crossing, Madrid January 20, p 20 Henke A (2005) Experience from the ground probing in the Gothard-Base Tunnel and their applicability in the Gibraltar Strait Crossing. IV UN-ITA Workshop Gibraltar Strait Crossing, Madrid January 20, p 20
Zurück zum Zitat Home L (2014a) Case studies on mechanized rock tunneling. In: Proceeding of world tunneling congress, tunnels for energy, 9–10 May, Brazil, p 12 Home L (2014a) Case studies on mechanized rock tunneling. In: Proceeding of world tunneling congress, tunnels for energy, 9–10 May, Brazil, p 12
Zurück zum Zitat Home L (2014b) The Kargi challenge, a study of TBM boring vs. conventional excavation. In: Third short course organized by Turkish Tunnelling Society, 28 August Istanbul, p 22 Home L (2014b) The Kargi challenge, a study of TBM boring vs. conventional excavation. In: Third short course organized by Turkish Tunnelling Society, 28 August Istanbul, p 22
Zurück zum Zitat Ozgorus Z, Okay IA (2005) Orientation of the andesitic dykes in the Istanbul Region: an approach to the cretaceous stress distribution. Miner Res Exp Bull 130:17–27 Ozgorus Z, Okay IA (2005) Orientation of the andesitic dykes in the Istanbul Region: an approach to the cretaceous stress distribution. Miner Res Exp Bull 130:17–27
Zurück zum Zitat Peila D, Pelizza S (2009) Ground probing and treatments in rock TBM tunnel to overcome limiting conditions. J Min Sci 45(6):602–619CrossRef Peila D, Pelizza S (2009) Ground probing and treatments in rock TBM tunnel to overcome limiting conditions. J Min Sci 45(6):602–619CrossRef
Zurück zum Zitat Schunnesson H (1996) RQD Predictions based on drill performance parameters. Tunn Undergr Sp Technol 11(3):345–351CrossRef Schunnesson H (1996) RQD Predictions based on drill performance parameters. Tunn Undergr Sp Technol 11(3):345–351CrossRef
Zurück zum Zitat Schunnesson H (1998) Rock Characterization using percussive drilling. Int J Rock Mech Min Sci 35(6):711–725CrossRef Schunnesson H (1998) Rock Characterization using percussive drilling. Int J Rock Mech Min Sci 35(6):711–725CrossRef
Zurück zum Zitat Steele DJ, Wu KK, Ishii M, Mackay AD, Kameyama K (2014) The use of advanced percussive drilling techniques to predict ground conditions ahead of sub-surface excavations, In: Underground Singapore, 25–26 September, organized by TUCSS. Tunnelling and Underground Society, Singapore, p 12 Steele DJ, Wu KK, Ishii M, Mackay AD, Kameyama K (2014) The use of advanced percussive drilling techniques to predict ground conditions ahead of sub-surface excavations, In: Underground Singapore, 25–26 September, organized by TUCSS. Tunnelling and Underground Society, Singapore, p 12
Zurück zum Zitat Tuncdemir H, Bilgin N, Copur H, Balci C (2008) Control of rock cutting efficiency by muck size. Int J Rock Mech Min Sci 45:278–288CrossRef Tuncdemir H, Bilgin N, Copur H, Balci C (2008) Control of rock cutting efficiency by muck size. Int J Rock Mech Min Sci 45:278–288CrossRef
Zurück zum Zitat Yurt M, Ozturk A, Arslan Z, Nuhoglu C, Oystein L, Erdogan E, Atlar B, Palakcı Y, Bilgin N (2014) Factors affecting the performance of a double shield TBM in a very complex geology in Kargi Turkey. In: Proceedings world tunnel congress 2014—tunnels for a better Life. Foz do Iguacu, Brazil, p 12 Yurt M, Ozturk A, Arslan Z, Nuhoglu C, Oystein L, Erdogan E, Atlar B, Palakcı Y, Bilgin N (2014) Factors affecting the performance of a double shield TBM in a very complex geology in Kargi Turkey. In: Proceedings world tunnel congress 2014—tunnels for a better Life. Foz do Iguacu, Brazil, p 12
Metadaten
Titel
Probe Drilling Ahead of Two TBMs in Difficult Ground Conditions in Turkey
verfasst von
Nuh Bilgin
Ugur Ates
Publikationsdatum
02.03.2016
Verlag
Springer Vienna
Erschienen in
Rock Mechanics and Rock Engineering / Ausgabe 7/2016
Print ISSN: 0723-2632
Elektronische ISSN: 1434-453X
DOI
https://doi.org/10.1007/s00603-016-0937-9

Weitere Artikel der Ausgabe 7/2016

Rock Mechanics and Rock Engineering 7/2016 Zur Ausgabe