Skip to main content

2021 | OriginalPaper | Buchkapitel

Process Improvement Proposal for the Reduction of Machine Setup Time in a Copper Transformation Company Using Lean Manufacturing Tools

verfasst von : Anthony Lora-Soto, Cristhoffer Morales-Silva, Jose Llontop-Jesus, Nestor Mamani

Erschienen in: Human Interaction, Emerging Technologies and Future Applications III

Verlag: Springer International Publishing

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

This study aimed to identify the causes of significant problems existing in the metallurgical sector, and a solution is proposed for the setup process. We detail the theoretical background of the processes in the lean manufacturing methodology, which will be applied to a rolling machine. Further, we provide a brief description of the company and the sector’s problems. We describe success stories of companies that implemented various lean manufacturing tools. We also present some of the results achieved across sectors to gain an in-depth understanding of the technique and a practical support of the implemented model. Our proposal is based on the lean manufacturing methodology; tools such as Single Minute Exchanges of Dies, Kaizen, 5S, and value stream mapping (VSM) will be used to reduce setup times and to impact machine layout and productivity positively. We also show the implementation results of a pilot plan conducted in the company over a period of more than 3 months.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
2.
Zurück zum Zitat Kishimoto, K., Medina, G., Sotelo, F., Raymundo, C.: Application of lean manufacturing techniques to increase on-time deliveries: case study of a metalworking company with a make-to-order environment in Peru. In: Ahram, T., Taiar, R., Colson, S., Choplin, A. (eds.) IHIET 2019. AISC, vol. 1018, pp. 952–958. Springer, Cham (2020). https://doi.org/10.1007/978-3-030-25629-6_148CrossRef Kishimoto, K., Medina, G., Sotelo, F., Raymundo, C.: Application of lean manufacturing techniques to increase on-time deliveries: case study of a metalworking company with a make-to-order environment in Peru. In: Ahram, T., Taiar, R., Colson, S., Choplin, A. (eds.) IHIET 2019. AISC, vol. 1018, pp. 952–958. Springer, Cham (2020). https://​doi.​org/​10.​1007/​978-3-030-25629-6_​148CrossRef
3.
Zurück zum Zitat Chiaini, A.: Improvement of OEE performance using a Lean Six Sigma approach: an Italian manufacturing case study. Int. J. Prod. Qual. Manage. 16, 416–433 (2015) Chiaini, A.: Improvement of OEE performance using a Lean Six Sigma approach: an Italian manufacturing case study. Int. J. Prod. Qual. Manage. 16, 416–433 (2015)
6.
Zurück zum Zitat Shingo, S.: A Revolution in Manufacturing: The SMED System. CRC Press, Boca Raton (1985) Shingo, S.: A Revolution in Manufacturing: The SMED System. CRC Press, Boca Raton (1985)
7.
Zurück zum Zitat Ahmad, R., Soberi, M.S.F.: Changeover process improvement based on modified SMED method and other process improvement tools application: an improvement project of 5-axis CNC machine operation in advanced composite manufacturing industry. Int. J. Adv. Manuf. Technol. 94(1), 433–450 (2017). https://doi.org/10.1007/s00170-017-0827-7CrossRef Ahmad, R., Soberi, M.S.F.: Changeover process improvement based on modified SMED method and other process improvement tools application: an improvement project of 5-axis CNC machine operation in advanced composite manufacturing industry. Int. J. Adv. Manuf. Technol. 94(1), 433–450 (2017). https://​doi.​org/​10.​1007/​s00170-017-0827-7CrossRef
8.
Zurück zum Zitat Díaz-Reza, J., García-Alcaraz, J., Martínez-Loya, V., Blanco, J., Jiménez, E., Avelar-Sosa, L.: The effect of SMED on benefits gained in maquiladora industry. Sustainability 8, 1237 (2016)CrossRef Díaz-Reza, J., García-Alcaraz, J., Martínez-Loya, V., Blanco, J., Jiménez, E., Avelar-Sosa, L.: The effect of SMED on benefits gained in maquiladora industry. Sustainability 8, 1237 (2016)CrossRef
9.
Zurück zum Zitat Reyes, S., Jeampiere, A., Castro, S., Fernanda, R.: Application of lean techniques to reduce preparation times: case study of a Peruvian plastic company. Int. J. Appl. Eng. Res. 12(23), 12 (2017) Reyes, S., Jeampiere, A., Castro, S., Fernanda, R.: Application of lean techniques to reduce preparation times: case study of a Peruvian plastic company. Int. J. Appl. Eng. Res. 12(23), 12 (2017)
10.
Zurück zum Zitat Johnson, A., Prasad, S., Sharma, A.K.: Manufacturing lead time reduction in a scaffold making industry using lean manufacturing techniques–a case study. Int. J. Mech. Eng. Technol. 8(2), 12 (2017) Johnson, A., Prasad, S., Sharma, A.K.: Manufacturing lead time reduction in a scaffold making industry using lean manufacturing techniques–a case study. Int. J. Mech. Eng. Technol. 8(2), 12 (2017)
11.
Zurück zum Zitat Puvanasvaran, A.P., Ab. Hamid, M.N.H., Yoong, S.S.: Cycle time reduction for coil setup process through standard work case study in ceramic industry. ARPN J. Eng. Appl. Sci. 13(1), 210–220 (2018) Puvanasvaran, A.P., Ab. Hamid, M.N.H., Yoong, S.S.: Cycle time reduction for coil setup process through standard work case study in ceramic industry. ARPN J. Eng. Appl. Sci. 13(1), 210–220 (2018)
Metadaten
Titel
Process Improvement Proposal for the Reduction of Machine Setup Time in a Copper Transformation Company Using Lean Manufacturing Tools
verfasst von
Anthony Lora-Soto
Cristhoffer Morales-Silva
Jose Llontop-Jesus
Nestor Mamani
Copyright-Jahr
2021
DOI
https://doi.org/10.1007/978-3-030-55307-4_89