Skip to main content
Erschienen in: Thermal Engineering 12/2023

01.12.2023 | STEAM-TURBINE, GAS-TURBINE, AND COMBINED-CYCLE PLANTS AND THEIR AUXILIARY EQUIPMENT

Selecting the Startup Option for the Surgut GRES-2 800-MW Power Unit in the Absence of Its Own Steam Source

verfasst von: A. V. Skuratov, V. I. Gombolevskii, M. V. Lazarev, A. S. Shabunin, P. A. Berezinets, Yu. S. Vasil’konov, A. N. Sinel’nikov, S. G. Filippov

Erschienen in: Thermal Engineering | Ausgabe 12/2023

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

Matters concerned with the tenacity of thermal power plants still remain of issue for the power industry of Russia. In view of power capacities concentrated within the boundaries of a single power plant, various off-design situations (accidents) occur in it, and the likelihood of such situations to occur increases significantly since the tendency toward aging of the existing equipment is still continuing. The situation in which the Surgut GRES-2 thermal power plant’s generating steam power equipment become shut down completely (so-called blackout) considered in the article is one of such contingencies. To cope with system accidents of this sort, relevant possibilities and means must be available. The Surgut GRES-2 power plant consists of two sages: six 800-MW seam power units (SPUs) and two 400-MW combined cycle units (CCUs). The article presents solutions to the problem stated above through interaction of the equipment of the power plant’s two stages. Five possible schemes for starting the SPUs from zero when there is loss of auxiliary steam are considered. The organizational and technical measures necessary for implementing these options are developed. The minimal requirements for an external steam source (flowrate, pressure, and temperature) are determined theoretically and confirmed by tests. Calculations of the CCU’s heat-recovery steam generator (HRSG) are carried out, which confirmed its ability to behave as the external steam source. For two promising options, schemes for the necessary modification of the power units are developed, and an aggregative comparative assessment of the costs for implementing them is carried out.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat VNTP (Standard) 81. Engineering Design Standards for Thermal Power Plants (Mosk. Otd. Teploenergoproekt, Moscow, 1981). VNTP (Standard) 81. Engineering Design Standards for Thermal Power Plants (Mosk. Otd. Teploenergoproekt, Moscow, 1981).
2.
Zurück zum Zitat V. I. Gombolevskii, A. V. Kolbasnikov, A. L. Shvarts, B. I. Shmukler, V. V. Sokolov, B. N. Glusker, E. D. Pichugin, and A. V. Bulgakov, “Commercial tests of the start-up of 800-MW units with TGMP-204KhL boilers at Surgut District Power Station 2 without using steam from an independent source,” Therm. Eng. 44, 695–699 (1997). V. I. Gombolevskii, A. V. Kolbasnikov, A. L. Shvarts, B. I. Shmukler, V. V. Sokolov, B. N. Glusker, E. D. Pichugin, and A. V. Bulgakov, “Commercial tests of the start-up of 800-MW units with TGMP-204KhL boilers at Surgut District Power Station 2 without using steam from an independent source,” Therm. Eng. 44, 695–699 (1997).
3.
Zurück zum Zitat A. L. Shvarts, V. I. Gombolevskii, A. A. Chugreev, and A. V. Skuratov, “Introduction of sliding pressure start-up technology throughout the entire circuit and improved startup separators on supercritical pressure boilers,” Elektr. Stn., No. 7, 9–15 (2006). A. L. Shvarts, V. I. Gombolevskii, A. A. Chugreev, and A. V. Skuratov, “Introduction of sliding pressure start-up technology throughout the entire circuit and improved startup separators on supercritical pressure boilers,” Elektr. Stn., No. 7, 9–15 (2006).
4.
Zurück zum Zitat B. N. Glusker, “Introduction of sliding pressure operating modes of supercritical pressure units throughout the entire vapor–water path at startup and at carrying partial loads,” Elektr. Stn., No. 5, 33–36 (1998). B. N. Glusker, “Introduction of sliding pressure operating modes of supercritical pressure units throughout the entire vapor–water path at startup and at carrying partial loads,” Elektr. Stn., No. 5, 33–36 (1998).
5.
Zurück zum Zitat A. A. Dyadichenko, S. S. Sokolov, and S. S. Serebryanskii, “Startups and deep unloadings on sliding pressure in the entire path in the TPP-804 boilers of 800 MW units at the Perm State District Power Plant,” Elektr. Stn., No. 10, 26–30 (1995). A. A. Dyadichenko, S. S. Sokolov, and S. S. Serebryanskii, “Startups and deep unloadings on sliding pressure in the entire path in the TPP-804 boilers of 800 MW units at the Perm State District Power Plant,” Elektr. Stn., No. 10, 26–30 (1995).
6.
Zurück zum Zitat V. I. Gombolevskii, A. L. Shvarts, A. V. Skuratov, and V. Ya. Kal’nishevskii, “Conversion of the steam supply system of 800 MW supercritical pressure units to a reduced steam temperature with introducing sliding startup technology on them,” Elektr. Stn., No. 11, 9–13 (2006). V. I. Gombolevskii, A. L. Shvarts, A. V. Skuratov, and V. Ya. Kal’nishevskii, “Conversion of the steam supply system of 800 MW supercritical pressure units to a reduced steam temperature with introducing sliding startup technology on them,” Elektr. Stn., No. 11, 9–13 (2006).
Metadaten
Titel
Selecting the Startup Option for the Surgut GRES-2 800-MW Power Unit in the Absence of Its Own Steam Source
verfasst von
A. V. Skuratov
V. I. Gombolevskii
M. V. Lazarev
A. S. Shabunin
P. A. Berezinets
Yu. S. Vasil’konov
A. N. Sinel’nikov
S. G. Filippov
Publikationsdatum
01.12.2023
Verlag
Pleiades Publishing
Erschienen in
Thermal Engineering / Ausgabe 12/2023
Print ISSN: 0040-6015
Elektronische ISSN: 1555-6301
DOI
https://doi.org/10.1134/S004060152312011X

Weitere Artikel der Ausgabe 12/2023

Thermal Engineering 12/2023 Zur Ausgabe

    Premium Partner