Skip to main content

2015 | OriginalPaper | Buchkapitel

Supply Chain Model for Deteriorating Items with Imperfect Production Process Under Budget Constraint

verfasst von : Urvashi Chaudhary, S. R. Singh, Upendra Chaudhary

Erschienen in: Information Systems Design and Intelligent Applications

Verlag: Springer India

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

The present paper undertakes to study the effect of imperfect production process on supply chain model under volume flexible manufacturing system. Manufacturing system produced stochastically imperfect items. Demand is taken to be continuous stochastic in nature under budget and shortage constraints. Holding cost is taken to be variable. Production rate is a decision variable. Production cost is dependent on production rate. A numerical example is provided to illustrate the optimality of the model.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Wu, M.Y., Wee, H.M.: Buyer-seller joint cost for deteriorating items with multiple-lot-size deliveries. J. Chin. Inst. Ind. Eng. 18(1), 109–119 (2001) Wu, M.Y., Wee, H.M.: Buyer-seller joint cost for deteriorating items with multiple-lot-size deliveries. J. Chin. Inst. Ind. Eng. 18(1), 109–119 (2001)
2.
Zurück zum Zitat Lee, H.T., Wu, J.C.: A study on inventory replenishment policies in a two-echelon supply chain system. Comput. Ind. Eng. 51(2), 257–263 (2006)CrossRef Lee, H.T., Wu, J.C.: A study on inventory replenishment policies in a two-echelon supply chain system. Comput. Ind. Eng. 51(2), 257–263 (2006)CrossRef
3.
Zurück zum Zitat Chen, L.H., Kang, F.S.: Integrated vendor-buyer cooperative inventory models with variant permissible delay in payments. Eur. J. Oper. Res. 183(2), 933–943 (2007)CrossRefMATH Chen, L.H., Kang, F.S.: Integrated vendor-buyer cooperative inventory models with variant permissible delay in payments. Eur. J. Oper. Res. 183(2), 933–943 (2007)CrossRefMATH
4.
Zurück zum Zitat Kim, S.W., Park, S.: Development of a three-echelon SC model to optimize coordination costs. Eur. J. Oper. Res. 184(3), 1044–1061 (2008)CrossRefMATH Kim, S.W., Park, S.: Development of a three-echelon SC model to optimize coordination costs. Eur. J. Oper. Res. 184(3), 1044–1061 (2008)CrossRefMATH
5.
Zurück zum Zitat Rau, H., Ouyang, B.C.: An optimal batch size for integrated production-inventory policy in a supply chain. Eur. J. Oper. Res. 185(2), 619–634 (2008)MathSciNetCrossRefMATH Rau, H., Ouyang, B.C.: An optimal batch size for integrated production-inventory policy in a supply chain. Eur. J. Oper. Res. 185(2), 619–634 (2008)MathSciNetCrossRefMATH
6.
Zurück zum Zitat Singh, S.R., Urvashi: An integrated production inventory model with expiration date and uncertain lead time in a supply chain. Int. Trans. Math. Sci. Comput. Appl. 1(1), 187–202 (2008) Singh, S.R., Urvashi: An integrated production inventory model with expiration date and uncertain lead time in a supply chain. Int. Trans. Math. Sci. Comput. Appl. 1(1), 187–202 (2008)
7.
Zurück zum Zitat Singh, S.R., Urvashi: Supply chain model with imperfect production process and stochastic demand under chance and imprecise constraints with variable holding cost. ICFAI Univ. J. Comput. Math. II(1), 37–62 (2009) Singh, S.R., Urvashi: Supply chain model with imperfect production process and stochastic demand under chance and imprecise constraints with variable holding cost. ICFAI Univ. J. Comput. Math. II(1), 37–62 (2009)
8.
Zurück zum Zitat Urvashi, Singh, S.R.: A supply chain model for deteriorating items under inflation with preservation technology. In: Proceeding of ICRTET, pp. 425–430. Elsevier, Amsterdam (2014) Urvashi, Singh, S.R.: A supply chain model for deteriorating items under inflation with preservation technology. In: Proceeding of ICRTET, pp. 425–430. Elsevier, Amsterdam (2014)
9.
Zurück zum Zitat Salameh, M.K., Jaber, M.Y.: Economic production quantity model for items with imperfect quality. Int. J. Prod. Econ. 64, 59–64 (2000)CrossRef Salameh, M.K., Jaber, M.Y.: Economic production quantity model for items with imperfect quality. Int. J. Prod. Econ. 64, 59–64 (2000)CrossRef
10.
Zurück zum Zitat Papachristos, S., Konstantaras, I.: Economic ordering quantity models for items with imperfect quality. Int. J. Prod. Econ. 100, 148–154 (2006)CrossRef Papachristos, S., Konstantaras, I.: Economic ordering quantity models for items with imperfect quality. Int. J. Prod. Econ. 100, 148–154 (2006)CrossRef
11.
Zurück zum Zitat Panda, D., Kar, S., Maity, K., Maiti, M.: A single period inventory model with imperfect production and stochastic demand under chance and imprecise constraints. Eur. J. Oper. Res. 188, 121–139 (2008)MathSciNetCrossRefMATH Panda, D., Kar, S., Maity, K., Maiti, M.: A single period inventory model with imperfect production and stochastic demand under chance and imprecise constraints. Eur. J. Oper. Res. 188, 121–139 (2008)MathSciNetCrossRefMATH
12.
Zurück zum Zitat Maity, A.K., Maity, K., Maiti, M.: A production-recycling-inventory system with imprecise holding costs. Appl. Math. Model. 32, 2241–2253 (2008)MathSciNetCrossRefMATH Maity, A.K., Maity, K., Maiti, M.: A production-recycling-inventory system with imprecise holding costs. Appl. Math. Model. 32, 2241–2253 (2008)MathSciNetCrossRefMATH
13.
Zurück zum Zitat Liu, N., Kim, Y., Hwang, H.: An optimal operating policy for the production system with rework. Comput. Ind. Eng. 56, 874–887 (2009)CrossRef Liu, N., Kim, Y., Hwang, H.: An optimal operating policy for the production system with rework. Comput. Ind. Eng. 56, 874–887 (2009)CrossRef
14.
Zurück zum Zitat Park, K.S.: Inventory models with partial backorders. Int. J. Syst. Sci. 13, 1313–1317 (1982)CrossRefMATH Park, K.S.: Inventory models with partial backorders. Int. J. Syst. Sci. 13, 1313–1317 (1982)CrossRefMATH
15.
Zurück zum Zitat Singh S.R., Urvashi: Supply chain models with imperfect production process and volume flexibility under inflation. IUP J. Supply Chain Manag. 15, 54–70 (2010) Singh S.R., Urvashi: Supply chain models with imperfect production process and volume flexibility under inflation. IUP J. Supply Chain Manag. 15, 54–70 (2010)
16.
Zurück zum Zitat Urvashi, Singh S.R.: Green supply chain model with product remanufacturing under volume flexible environment. Procedia Technol. 10, 216–226 (2013) (Elsevier) Urvashi, Singh S.R.: Green supply chain model with product remanufacturing under volume flexible environment. Procedia Technol. 10, 216–226 (2013) (Elsevier)
17.
Zurück zum Zitat Ghare, P.N., Schrader, G.F.: A model for exponentially decaying inventories. J. Ind. Eng. 15, 238–243 (1963) Ghare, P.N., Schrader, G.F.: A model for exponentially decaying inventories. J. Ind. Eng. 15, 238–243 (1963)
18.
Zurück zum Zitat Covert, P.R., Philip, G.C.: An EOQ model for items with Weibull distribution deterioration. AIIE Trans. 5, 323–326 (1973)CrossRef Covert, P.R., Philip, G.C.: An EOQ model for items with Weibull distribution deterioration. AIIE Trans. 5, 323–326 (1973)CrossRef
19.
Zurück zum Zitat Tadikamalla, P.R.: An EOQ inventory model for items with gamma distributed deterioration. AIIE Trans. 10, 100–103 (1978)CrossRef Tadikamalla, P.R.: An EOQ inventory model for items with gamma distributed deterioration. AIIE Trans. 10, 100–103 (1978)CrossRef
20.
Zurück zum Zitat Moon, I., Lee, S.: The effects of inflation and time value of money on an economic order quantity model with a random product life cycle. Eur. J. Oper. Res. 125, 588–601 (2000)MathSciNetCrossRefMATH Moon, I., Lee, S.: The effects of inflation and time value of money on an economic order quantity model with a random product life cycle. Eur. J. Oper. Res. 125, 588–601 (2000)MathSciNetCrossRefMATH
21.
22.
Zurück zum Zitat Goyal, S.K., Giri, B.C.: Recent trend in modeling of deteriorating inventory: an invited review. Eur. J. Oper. Res. 134, 1–16 (2001)MathSciNetCrossRefMATH Goyal, S.K., Giri, B.C.: Recent trend in modeling of deteriorating inventory: an invited review. Eur. J. Oper. Res. 134, 1–16 (2001)MathSciNetCrossRefMATH
23.
Zurück zum Zitat Singh S.R., Urvashi: An inventory model with inflation induced demand rate under volume flexibility environment. Int. Trans. Math. Sci. Comput. 5(2), 271–282 Singh S.R., Urvashi: An inventory model with inflation induced demand rate under volume flexibility environment. Int. Trans. Math. Sci. Comput. 5(2), 271–282
Metadaten
Titel
Supply Chain Model for Deteriorating Items with Imperfect Production Process Under Budget Constraint
verfasst von
Urvashi Chaudhary
S. R. Singh
Upendra Chaudhary
Copyright-Jahr
2015
Verlag
Springer India
DOI
https://doi.org/10.1007/978-81-322-2247-7_29

Premium Partner