Abstract

Standard Method of Measurement (SMM) is a reference document used to determine a localized technique of construction measurement protocol needed in producing a good Bills of Quantities (BQ) which is then incorporated into the contract document for the project. The preparation of the BQ based on SMM that is reflective of the actual work will actually help the contractor to price the tender realistically. Tendering is a serious business, whereby failure to properly price it at a realistic and profitable level can give a bad impact to the contractor’s organization. Thus, it is crucial to conduct research which aimed to investigate the two edition of the SMM for building works between the SMM1 and SMM2 version in the preparation of the BQs, focusing towards improving the appreciation of the contractors during the course of tender and construction. In view of the above matter, this paper will attempt to identify a few differences on the method of measurement between SMM1 and SMM2 and to analyze the contractors’ perception on the application of the SMM in determining the tender realistically and reflective of the work on site. Triangular data collection approach was used in order to obtain a variety of information on the same issues. It comprises a literature review followed by document analysis, a questionnaire survey which was then supported by semi- structured interviews. However, due to the limitation of the space, this paper will only focus on one major element which is the excavation work. There are three differences identified between the SMM1 and SMM2, which are; unit of measurement, method of measurement and additional new items/elements. There were also a few items the contractor prefers to be measured according to the SMM1. Thus, an improvement is needed in order fill in the gap identified between the two SMMs.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat R. Abd Rashid, M. Mustapa, S.N. Abd Wahid, Bills of Quantities—Are They Usefull and Relevant Today? in International Conference on Construction Industry (2006 June), pp. 1–10 R. Abd Rashid, M. Mustapa, S.N. Abd Wahid, Bills of Quantities—Are They Usefull and Relevant Today? in International Conference on Construction Industry (2006 June), pp. 1–10
2.
Zurück zum Zitat A.R. Abdul Aziz, N. Ali, Outsourcing and quality performance: malaysia’s public works department. Struct. Surv. 22(1), 53–60 (2004)CrossRef A.R. Abdul Aziz, N. Ali, Outsourcing and quality performance: malaysia’s public works department. Struct. Surv. 22(1), 53–60 (2004)CrossRef
3.
Zurück zum Zitat M. Brook, Estimating and Tendering for Construction Work (Butterworth Heinemann, Oxford, 1998) M. Brook, Estimating and Tendering for Construction Work (Butterworth Heinemann, Oxford, 1998)
4.
Zurück zum Zitat H. Adnan, A.H. Mohd Nawawi, S.M. Mohd Akhir, A. Supardi, H. Chong, Bills of quantities: perspectives of contractor in Malaysia. Aust. J. Basic Appl. Sci. 5(11), 863–873 (2011) H. Adnan, A.H. Mohd Nawawi, S.M. Mohd Akhir, A. Supardi, H. Chong, Bills of quantities: perspectives of contractor in Malaysia. Aust. J. Basic Appl. Sci. 5(11), 863–873 (2011)
5.
Zurück zum Zitat P.R. Davis, P.E.D. Love, D. Baccarini, Bills of quantities: nemesis or nirvana? Emerald J. 27(2), 99–108 (2009)CrossRef P.R. Davis, P.E.D. Love, D. Baccarini, Bills of quantities: nemesis or nirvana? Emerald J. 27(2), 99–108 (2009)CrossRef
6.
Zurück zum Zitat K. Abd Rashid, In Need of Studies to Assess the Effectiveness of Bills of Quantities, in 10th Management in Construction Research (MiCRA) Conference (2011) K. Abd Rashid, In Need of Studies to Assess the Effectiveness of Bills of Quantities, in 10th Management in Construction Research (MiCRA) Conference (2011)
7.
Zurück zum Zitat K. Abd. Latif, Standardising and Enhancing Bills of Quantities for Civil Engineering Works using Malaysian Standard Method of Measurement using Malaysian Standard Method of Measurement (CESMM). Seminar on SMM in construction presented on 31 March 2010 (Kuala Lumpur, 2010) K. Abd. Latif, Standardising and Enhancing Bills of Quantities for Civil Engineering Works using Malaysian Standard Method of Measurement using Malaysian Standard Method of Measurement (CESMM). Seminar on SMM in construction presented on 31 March 2010 (Kuala Lumpur, 2010)
8.
Zurück zum Zitat P.R. Davis, D. Baccarini, The Use of Bills of Quantities in Construction Projects—An Australian Survey, in Proceedings of COBRA (2004) P.R. Davis, D. Baccarini, The Use of Bills of Quantities in Construction Projects—An Australian Survey, in Proceedings of COBRA (2004)
9.
Zurück zum Zitat N.S. Kamaruddin, Bill of Quantity (BQ) and Preparation of BQ (2010) N.S. Kamaruddin, Bill of Quantity (BQ) and Preparation of BQ (2010)
10.
Zurück zum Zitat T.R. Myles, Bills of what?—The Origin of Bills of Quantities, Hanscomb/Means Reports (2006) T.R. Myles, Bills of what?—The Origin of Bills of Quantities, Hanscomb/Means Reports (2006)
11.
Zurück zum Zitat A. Razali, K. Abd Rashid, Applicability of Bill of Quantities in Today’s Construction Industry, in 10th Management in Construction Research (MiCRA) Conference (2011) A. Razali, K. Abd Rashid, Applicability of Bill of Quantities in Today’s Construction Industry, in 10th Management in Construction Research (MiCRA) Conference (2011)
12.
Zurück zum Zitat A.K. Mohd Din, An Introduction of Roles and Responsibilities of Pengurusan Aset Air Berhad in Water Industry and why WWSMM? Seminar on Standard of Measurement in Construction Procurement Presented on 2 July (2009) A.K. Mohd Din, An Introduction of Roles and Responsibilities of Pengurusan Aset Air Berhad in Water Industry and why WWSMM? Seminar on Standard of Measurement in Construction Procurement Presented on 2 July (2009)
13.
Zurück zum Zitat M.F. Mohammad, Standard Method of Measurement: A Review of Its Importance and Relevance in Quantity Surveying Practice, in International Seminar 2012: Responding to Global Challenges—The Need for Quantity Surveyor Professional Standard (2012) M.F. Mohammad, Standard Method of Measurement: A Review of Its Importance and Relevance in Quantity Surveying Practice, in International Seminar 2012: Responding to Global Challenges—The Need for Quantity Surveyor Professional Standard (2012)
14.
Zurück zum Zitat A.R. Nizam Akbar, M.F. Mohammad, N. Ahmad, M. Mysham, Adopting Standardization in Construction Environment: Standard Method of Measurement (SMMs), in Procedia Social and Behavioral Sciences (2014) A.R. Nizam Akbar, M.F. Mohammad, N. Ahmad, M. Mysham, Adopting Standardization in Construction Environment: Standard Method of Measurement (SMMs), in Procedia Social and Behavioral Sciences (2014)
15.
Zurück zum Zitat R. Hussin, F. Ishak, Contractors’ Professionalism: Fundamental Mistakes and Ignorance During Costing and Tendering, RISM (Kuala Lumpur, Jan 2004), pp. 28–34 R. Hussin, F. Ishak, Contractors’ Professionalism: Fundamental Mistakes and Ignorance During Costing and Tendering, RISM (Kuala Lumpur, Jan 2004), pp. 28–34
16.
Zurück zum Zitat N. Foster, T.J. Trauner, R.R. Vespe, W.M. Chapman, Construction Estimates From Take-Off to Bid (McGraw-Hill, USA, 1995) N. Foster, T.J. Trauner, R.R. Vespe, W.M. Chapman, Construction Estimates From Take-Off to Bid (McGraw-Hill, USA, 1995)
17.
Zurück zum Zitat M. Cutts, How to make laws easier to read and understand, in Laws for Citizens (2008), pp. 1–10 M. Cutts, How to make laws easier to read and understand, in Laws for Citizens (2008), pp. 1–10
18.
Zurück zum Zitat M.M. Che Mat, The Need to Standardise the Bill of Quantities for Civil Engineering Works. Seminar on Standard of Measurement in Construction Procurement (Kuala Lumpur, 2010) M.M. Che Mat, The Need to Standardise the Bill of Quantities for Civil Engineering Works. Seminar on Standard of Measurement in Construction Procurement (Kuala Lumpur, 2010)
19.
Zurück zum Zitat S. Hassan, “Evolving SMM”, CPD talk development from board of quantity surveyors, Malaysia (BQSM) and construction industry development board Malaysia (CIDB). Presented at Taylor’s University College on 15, 2011 (2011) S. Hassan, “Evolving SMM”, CPD talk development from board of quantity surveyors, Malaysia (BQSM) and construction industry development board Malaysia (CIDB). Presented at Taylor’s University College on 15, 2011 (2011)
20.
Zurück zum Zitat S. Hassan, Role of SMM in Construction Industry, Seminar on SMM in Construction Procurement presented on 2 July 2009 (Kuala Lumpur, 2009) S. Hassan, Role of SMM in Construction Industry, Seminar on SMM in Construction Procurement presented on 2 July 2009 (Kuala Lumpur, 2009)
21.
Zurück zum Zitat A. Ashworth, K. Hogg, Willis’s Practice and Procedure for the Quantity Surveyor, 11th ed. (Blackwell Science, UK, 2002) A. Ashworth, K. Hogg, Willis’s Practice and Procedure for the Quantity Surveyor, 11th ed. (Blackwell Science, UK, 2002)
Metadaten
Titel
The Implication of the Standard Method of Measurement (SMMs) for Building Works Toward Contractors’ Works
verfasst von
Anis Rosniza Nizam Akbar
Mohammad Fadhil Mohammad
Noor Amalia Talib
Mysarah Maisham
Copyright-Jahr
2015
Verlag
Springer Singapore
DOI
https://doi.org/10.1007/978-981-287-290-6_13