Skip to main content
Erschienen in: Journal of Scheduling 3/2017

16.01.2016

The local–global conjecture for scheduling with non-linear cost

verfasst von: Nikhil Bansal, Christoph Dürr, Nguyen Kim Thang, Óscar C. Vásquez

Erschienen in: Journal of Scheduling | Ausgabe 3/2017

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

We consider the classical scheduling problem on a single machine, on which we need to schedule sequentially n given jobs. Every job j has a processing time \(p_j\) and a priority weight \(w_j\), and for a given schedule a completion time \(C_j\). In this paper, we consider the problem of minimizing the objective value \(\sum _j w_j C_j^\beta \) for some fixed constant \(\beta >0\). This non-linearity is motivated for example by the learning effect of a machine improving its efficiency over time, or by the speed scaling model. For \(\beta =1\), the well-known Smith’s rule that orders job in the non-increasing order of \(w_j/p_j\) gives the optimum schedule. However, for \(\beta \ne 1\), the complexity status of this problem is open. Among other things, a key issue here is that the ordering between a pair of jobs is not well defined, and might depend on where the jobs lie in the schedule and also on the jobs between them. We investigate this question systematically and substantially generalize the previously known results in this direction. These results lead to interesting new dominance properties among schedules which lead to huge speed up in exact algorithms for the problem. An experimental study evaluates the impact of these properties on the exact algorithm A*.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
Zurück zum Zitat Alidaee, B. (1993). Numerical methods for single machine scheduling with non-linear cost functions to minimize total cost. Journal of the Operational Research Society, 44(2), 125–132.CrossRef Alidaee, B. (1993). Numerical methods for single machine scheduling with non-linear cost functions to minimize total cost. Journal of the Operational Research Society, 44(2), 125–132.CrossRef
Zurück zum Zitat Bagga, P., & Karlra, K. (1980). A node elimination procedure for Townsend’s algorithm for solving the single machine quadratic penalty function scheduling problem. Management Science, 26(6), 633–636.CrossRef Bagga, P., & Karlra, K. (1980). A node elimination procedure for Townsend’s algorithm for solving the single machine quadratic penalty function scheduling problem. Management Science, 26(6), 633–636.CrossRef
Zurück zum Zitat Bansal, N., & Pruhs, K. (2010). The geometry of scheduling. In Proceedings of the IEEE 51st Annual Symposium on Foundations of Computer Science (FOCS) (pp. 407–414). Bansal, N., & Pruhs, K. (2010). The geometry of scheduling. In Proceedings of the IEEE 51st Annual Symposium on Foundations of Computer Science (FOCS) (pp. 407–414).
Zurück zum Zitat Cheung, M., & Shmoys, D. (2011). A primal-dual approximation algorithm for min-sum single-machine scheduling problems. In Proceedings of the 14th International Workshop APPROX and 15th International Workshop RANDOM (pp. 135–146). Cheung, M., & Shmoys, D. (2011). A primal-dual approximation algorithm for min-sum single-machine scheduling problems. In Proceedings of the 14th International Workshop APPROX and 15th International Workshop RANDOM (pp. 135–146).
Zurück zum Zitat Croce, F., Tadei, R., Baracco, P., Di Tullio, R. (1993). On minimizing the weighted sum of quadratic completion times on a single machine. In Proceedings of the IEEE International Conference on Robotics and Automation (pp. 816–820). Croce, F., Tadei, R., Baracco, P., Di Tullio, R. (1993). On minimizing the weighted sum of quadratic completion times on a single machine. In Proceedings of the IEEE International Conference on Robotics and Automation (pp. 816–820).
Zurück zum Zitat Dürr, C., Jeż, Ł., & Vásquez, O. C. (2014). Scheduling under dynamic speed-scaling for minimizing weighted completion time and energy consumption. Discrete Applied Mathematics, 196, 20–27. Dürr, C., Jeż, Ł., & Vásquez, O. C. (2014). Scheduling under dynamic speed-scaling for minimizing weighted completion time and energy consumption. Discrete Applied Mathematics, 196, 20–27.
Zurück zum Zitat Epstein, L., Levin, A., Marchetti-Spaccamela, A., Megow, N., Mestre, J., Skutella, M., & Stougie, L. (2010). Universal sequencing on a single machine. In Proceedings of the 14th International Conference of Integer Programming and Combinatorial Optimization (IPCO) (pp. 230–243). Epstein, L., Levin, A., Marchetti-Spaccamela, A., Megow, N., Mestre, J., Skutella, M., & Stougie, L. (2010). Universal sequencing on a single machine. In Proceedings of the 14th International Conference of Integer Programming and Combinatorial Optimization (IPCO) (pp. 230–243).
Zurück zum Zitat Hart, P. E., Nilsson, N. J., & Raphael, B. (1972). Correction to a formal basis for the heuristic determination of minimum cost paths. ACM SIGART Bulletin, 37, 28–29.CrossRef Hart, P. E., Nilsson, N. J., & Raphael, B. (1972). Correction to a formal basis for the heuristic determination of minimum cost paths. ACM SIGART Bulletin, 37, 28–29.CrossRef
Zurück zum Zitat Höhn, W., & Jacobs, T. (2012a). An experimental and analytical study of order constraints for single machine scheduling with quadratic cost. In Proceedings of the 14th Workshop on Algorithm Engineering and Experiments (ALENEX’12) (pp. 103–117). Höhn, W., & Jacobs, T. (2012a). An experimental and analytical study of order constraints for single machine scheduling with quadratic cost. In Proceedings of the 14th Workshop on Algorithm Engineering and Experiments (ALENEX’12) (pp. 103–117).
Zurück zum Zitat Höhn, W., & Jacobs, T. (2012c). On the performance of Smith’s rule in single-machine scheduling with nonlinear cost. In Proceedings of the 10th Latin American Theoretical Informatics Symposium (LATIN) (pp. 482–493). Höhn, W., & Jacobs, T. (2012c). On the performance of Smith’s rule in single-machine scheduling with nonlinear cost. In Proceedings of the 10th Latin American Theoretical Informatics Symposium (LATIN) (pp. 482–493).
Zurück zum Zitat Kaindl, H., Kainz, G., & Radda, K. (2001). Asymmetry in search. IEEE Transactions on Systems Man and Cybernetics, 31(5), 791–796.CrossRef Kaindl, H., Kainz, G., & Radda, K. (2001). Asymmetry in search. IEEE Transactions on Systems Man and Cybernetics, 31(5), 791–796.CrossRef
Zurück zum Zitat Megow, N., & Verschae, J. (2013). Dual techniques for scheduling on a machine with varying speed. In Proceedings of the 40th International Colloquium on Automata, Languages and Programming (ICALP) (pp. 745–756). Megow, N., & Verschae, J. (2013). Dual techniques for scheduling on a machine with varying speed. In Proceedings of the 40th International Colloquium on Automata, Languages and Programming (ICALP) (pp. 745–756).
Zurück zum Zitat Mondal, S., & Sen, A. (2000). An improved precedence rule for single machine sequencing problems with quadratic penalty. European Journal of Operational Research, 125(2), 425–428.CrossRef Mondal, S., & Sen, A. (2000). An improved precedence rule for single machine sequencing problems with quadratic penalty. European Journal of Operational Research, 125(2), 425–428.CrossRef
Zurück zum Zitat Sen, T., Dileepan, P., & Ruparel, B. (1990). Minimizing a generalized quadratic penalty function of job completion times: An improved branch-and-bound approach. Engineering Costs and Production Economics, 18(3), 197–202.CrossRef Sen, T., Dileepan, P., & Ruparel, B. (1990). Minimizing a generalized quadratic penalty function of job completion times: An improved branch-and-bound approach. Engineering Costs and Production Economics, 18(3), 197–202.CrossRef
Zurück zum Zitat Smith, W. E. (1956). Various optimizers for single-stage production. Naval Research Logistics Quarterly, 3(1–2), 59–66.CrossRef Smith, W. E. (1956). Various optimizers for single-stage production. Naval Research Logistics Quarterly, 3(1–2), 59–66.CrossRef
Zurück zum Zitat Szwarc, W. (1998). Decomposition in single-machine scheduling. Annals of Operations Research, 83, 271–287. Szwarc, W. (1998). Decomposition in single-machine scheduling. Annals of Operations Research, 83, 271–287.
Zurück zum Zitat Townsend, W. (1978). The single machine problem with quadratic penalty function of completion times: A branch-and-bound solution. Management Science, 24(5), 530–534.CrossRef Townsend, W. (1978). The single machine problem with quadratic penalty function of completion times: A branch-and-bound solution. Management Science, 24(5), 530–534.CrossRef
Zurück zum Zitat Vásquez, O. C. (2014). For the airplane refueling problem local precedence implies global precedence. Optimization Letters, 9(4), 663–675. Vásquez, O. C. (2014). For the airplane refueling problem local precedence implies global precedence. Optimization Letters, 9(4), 663–675.
Metadaten
Titel
The local–global conjecture for scheduling with non-linear cost
verfasst von
Nikhil Bansal
Christoph Dürr
Nguyen Kim Thang
Óscar C. Vásquez
Publikationsdatum
16.01.2016
Verlag
Springer US
Erschienen in
Journal of Scheduling / Ausgabe 3/2017
Print ISSN: 1094-6136
Elektronische ISSN: 1099-1425
DOI
https://doi.org/10.1007/s10951-015-0466-5

Weitere Artikel der Ausgabe 3/2017

Journal of Scheduling 3/2017 Zur Ausgabe

Premium Partner