2009 | OriginalPaper | Buchkapitel
The Power of Preemption on Unrelated Machines and Applications to Scheduling Orders
verfasst von : José R. Correa, Martin Skutella, José Verschae
Erschienen in: Approximation, Randomization, and Combinatorial Optimization. Algorithms and Techniques
Verlag: Springer Berlin Heidelberg
Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.
Wählen Sie Textabschnitte aus um mit Künstlicher Intelligenz passenden Patente zu finden. powered by
Markieren Sie Textabschnitte, um KI-gestützt weitere passende Inhalte zu finden. powered by
Scheduling jobs on unrelated parallel machines so as to minimize the makespan is one of the basic, well-studied problems in the area of machine scheduling. In the first part of the paper we prove that the power of preemption, i.e., the ratio between the makespan of an optimal nonpreemptive and an optimal preemptive schedule, is exactly 4. This result is a definite answer to an important basic open problem in scheduling. The proof of the lower bound is based on a clever iterative construction while the rounding technique we use to prove the upper bound is an adaptation of Shmoys and Tardos’ rounding for the generalized assignment problem. In the second part of the paper we apply this adaptation to the more general setting in which orders, consisting of several jobs, have to be processed on unrelated parallel machines so as to minimize the sum of weighted completion times of the orders. We obtain the first constant factor approximation algorithms for the preemptive and nonpreemptive case, improving and extending a recent result by Leung et. al.