Skip to main content

2017 | OriginalPaper | Buchkapitel

Uncertain Resource-Constrained Project Scheduling Problem with Net Present Value Criterion for Risk-Averse Decision Makers

verfasst von : Chenkai Zhao, Hua Ke

Erschienen in: Proceedings of the Fourth International Forum on Decision Sciences

Verlag: Springer Singapore

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

On the basis of uncertainty theory, plenty of researches have been done on uncertain resource-constrained project scheduling problem (URCPSP). Instead of minimizing the makespan, in this paper, we address the maximization of net present value (NPV) of a project’s cash flows when activity durations are assumed to be uncertain. In addition to precedence constraint and resource constraint involved in resource-constrained project scheduling problem (RCPSP), a deadline constraint is taken into account. Thus, our aim is to maximize NPV and to satisfy the deadline constraint with certain belief degree as well. Accordingly we adopt chance-constrained programming and utilize a revised estimation of distribution algorithm (EDA) to solve this problem. In this way we present NPV criterion for project decision makers who are risk-averse.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Herroelen W, Demeulemeester E, De Reyck B (1999) A classification scheme for project scheduling. In: project scheduling: recent models, algorithms and applications. Kluwer, Amsterdam, pp 1–26 Herroelen W, Demeulemeester E, De Reyck B (1999) A classification scheme for project scheduling. In: project scheduling: recent models, algorithms and applications. Kluwer, Amsterdam, pp 1–26
2.
Zurück zum Zitat Kolisch R, Padman R (2001) An integrated survey of deterministic project scheduling. Omega 29(3):249–272CrossRef Kolisch R, Padman R (2001) An integrated survey of deterministic project scheduling. Omega 29(3):249–272CrossRef
3.
Zurück zum Zitat Herroelen WS, Van Dommelen P, Demeulemeester EL (1997) Project network models with discounted cash flows: a guided tour through recent developments. Eur J Oper Res 100(1):97–121CrossRef Herroelen WS, Van Dommelen P, Demeulemeester EL (1997) Project network models with discounted cash flows: a guided tour through recent developments. Eur J Oper Res 100(1):97–121CrossRef
4.
Zurück zum Zitat Wang L, Fang C (2012) An e ective estimation of distribution algorithm for the multi-mode resource-constrained project scheduling problem. Comput Oper Res 39(2):449–460CrossRef Wang L, Fang C (2012) An e ective estimation of distribution algorithm for the multi-mode resource-constrained project scheduling problem. Comput Oper Res 39(2):449–460CrossRef
5.
Zurück zum Zitat Fang C, Kolisch R, Wang L, Mu C (2015) An estimation of distribution algorithm and new computational results for the stochastic resource-constrained project scheduling problem. Flex Serv Manuf J 27(4):585–605CrossRef Fang C, Kolisch R, Wang L, Mu C (2015) An estimation of distribution algorithm and new computational results for the stochastic resource-constrained project scheduling problem. Flex Serv Manuf J 27(4):585–605CrossRef
6.
7.
Zurück zum Zitat Buss AH, Rosenblatt MJ (1997) Activity delay in stochastic project networks. Oper Res 45(1):126–139CrossRef Buss AH, Rosenblatt MJ (1997) Activity delay in stochastic project networks. Oper Res 45(1):126–139CrossRef
8.
Zurück zum Zitat Tilson V, Sobel MJ, Szmerekovsky JG (2006) Scheduling projects with stochastic activity duration to maximize epv. Tech. rep, Citeseer Tilson V, Sobel MJ, Szmerekovsky JG (2006) Scheduling projects with stochastic activity duration to maximize epv. Tech. rep, Citeseer
9.
Zurück zum Zitat Neumann K, Zimmermann J (2000) Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints. Eur J Oper Res 127(2):425–443CrossRef Neumann K, Zimmermann J (2000) Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints. Eur J Oper Res 127(2):425–443CrossRef
10.
Zurück zum Zitat Demeulemeester E, Herroelen W (2002) Project scheduling-a research handbook. International Series in Operations Research and Management Science, vol 49 Demeulemeester E, Herroelen W (2002) Project scheduling-a research handbook. International Series in Operations Research and Management Science, vol 49
11.
Zurück zum Zitat Ballestn F (2007) When it is worthwhile to work with the stochastic RCPSP. J Sched 10(3):153–166CrossRef Ballestn F (2007) When it is worthwhile to work with the stochastic RCPSP. J Sched 10(3):153–166CrossRef
12.
Zurück zum Zitat Herroelen W, Leus R (2005) Project scheduling under uncertainty: survey and research potentials. Eur J Oper Res 165(2):289–306CrossRef Herroelen W, Leus R (2005) Project scheduling under uncertainty: survey and research potentials. Eur J Oper Res 165(2):289–306CrossRef
13.
Zurück zum Zitat Igelmund G, Radermacher FJ (1983) Preselective strategies for the optimization of stochastic project networks under resource constraints. Networks 13(1):1–28CrossRef Igelmund G, Radermacher FJ (1983) Preselective strategies for the optimization of stochastic project networks under resource constraints. Networks 13(1):1–28CrossRef
14.
Zurück zum Zitat Stork F (2001) Stochastic resource-constrained project scheduling, Ph.D. Thesis, Technische Universit at Berlin Stork F (2001) Stochastic resource-constrained project scheduling, Ph.D. Thesis, Technische Universit at Berlin
15.
Zurück zum Zitat Ohring RHM, Radermacher FJ, Weiss G (1984) Stochastic scheduling problems I: General strategies. ZOR–Zeitschrift fur Oper Res 28(7):193–260 Ohring RHM, Radermacher FJ, Weiss G (1984) Stochastic scheduling problems I: General strategies. ZOR–Zeitschrift fur Oper Res 28(7):193–260
16.
Zurück zum Zitat Mohring RH, Radermacher FJ, Weiss G (1985) Stochastic scheduling problems II: Set strategies. ZOR–Zeitschrift fur Oper Res 29(3):65–104 Mohring RH, Radermacher FJ, Weiss G (1985) Stochastic scheduling problems II: Set strategies. ZOR–Zeitschrift fur Oper Res 29(3):65–104
17.
Zurück zum Zitat Tsai YW, Gemmill DD (1998) Using tabu search to schedule activities of stochastic resource-constrained projects. Eur J Oper Res 111(1):129–141CrossRef Tsai YW, Gemmill DD (1998) Using tabu search to schedule activities of stochastic resource-constrained projects. Eur J Oper Res 111(1):129–141CrossRef
18.
Zurück zum Zitat Stork F Branch-and-bound algorithms for stochastic Resource-Constrained project scheduling. Technical Report No. 702/2000. Technische Universitat Berlin Stork F Branch-and-bound algorithms for stochastic Resource-Constrained project scheduling. Technical Report No. 702/2000. Technische Universitat Berlin
19.
Zurück zum Zitat Ballestin F, Leus R (2009) Resource-constrained project scheduling for timely project completion with stochastic activity durations. Prod Oper Manag 18(4):459–474CrossRef Ballestin F, Leus R (2009) Resource-constrained project scheduling for timely project completion with stochastic activity durations. Prod Oper Manag 18(4):459–474CrossRef
20.
Zurück zum Zitat Ashtiani B, Leus R, Aryanezhad M-B (2011) New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing. J Sched 14(2):157–171CrossRef Ashtiani B, Leus R, Aryanezhad M-B (2011) New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing. J Sched 14(2):157–171CrossRef
21.
Zurück zum Zitat Liu B (2007) Uncertainty Theory, 2nd edn. Springer, Berlin Liu B (2007) Uncertainty Theory, 2nd edn. Springer, Berlin
22.
Zurück zum Zitat Chen X (2011) American option pricing formula for uncertain financial market. Int J Oper Res 8(2):32–37 Chen X (2011) American option pricing formula for uncertain financial market. Int J Oper Res 8(2):32–37
23.
Zurück zum Zitat Gao Z, Wang X, Ha M (2016) Multi-asset option pricing in an uncertain financial market with jump risk. J Uncertain Anal Appl 4(1) Article 1 Gao Z, Wang X, Ha M (2016) Multi-asset option pricing in an uncertain financial market with jump risk. J Uncertain Anal Appl 4(1) Article 1
24.
Zurück zum Zitat Peng J, Yao K (2011) A new option pricing model for stocks in uncertainty markets. Int J Oper Res 8(2):18–26 Peng J, Yao K (2011) A new option pricing model for stocks in uncertainty markets. Int J Oper Res 8(2):18–26
25.
Zurück zum Zitat Bhattacharyya R, Chatterjee A, Kar S (2013) Uncertainty theory based multiple objective mean-entropy-skewness stock portfolio selection model with transaction costs. J Uncertain Anal Appl 1(1) Article 16 Bhattacharyya R, Chatterjee A, Kar S (2013) Uncertainty theory based multiple objective mean-entropy-skewness stock portfolio selection model with transaction costs. J Uncertain Anal Appl 1(1) Article 16
26.
Zurück zum Zitat Ke H (2014) Uncertain random time-cost trade-o problem. J Uncertain Anal Appl 2(1) Article 23 Ke H (2014) Uncertain random time-cost trade-o problem. J Uncertain Anal Appl 2(1) Article 23
28.
Zurück zum Zitat Guo H, Wang X, Wang L, Chen D (2016) Delphi method for estimating membership function of uncertain set. J Uncertain Anal Appl 4(1) Article 3 Guo H, Wang X, Wang L, Chen D (2016) Delphi method for estimating membership function of uncertain set. J Uncertain Anal Appl 4(1) Article 3
29.
Zurück zum Zitat Ke H, Liu H, Tian G (2015) An uncertain random programming model for project scheduling problem. Int J Intell Syst 30(1):66–79CrossRef Ke H, Liu H, Tian G (2015) An uncertain random programming model for project scheduling problem. Int J Intell Syst 30(1):66–79CrossRef
30.
31.
Zurück zum Zitat Charnes A, Cooper WW (1959) Chance-constrained programming. Manage Sci 6(1):73–79CrossRef Charnes A, Cooper WW (1959) Chance-constrained programming. Manage Sci 6(1):73–79CrossRef
32.
Zurück zum Zitat Wang L, Huang H, Ke H (2015) Chance-constrained model for RCPSP with uncertain durations. J Uncertain Anal Appl 3(1) Article 12 Wang L, Huang H, Ke H (2015) Chance-constrained model for RCPSP with uncertain durations. J Uncertain Anal Appl 3(1) Article 12
33.
Zurück zum Zitat Artigues C, Roubellat F (2000) A polynomial activity insertion algorithm in a multi-resource schedule with cumulative constraints and multiple modes. Eur J Oper Res 127(2):297–316. 8 ICEBCN2016 Artigues C, Roubellat F (2000) A polynomial activity insertion algorithm in a multi-resource schedule with cumulative constraints and multiple modes. Eur J Oper Res 127(2):297–316. 8 ICEBCN2016
34.
Zurück zum Zitat Ma W, Che Y, Huang H, Ke H (2015) Resource-constrained project scheduling problem with uncertain durations and renewable resources. Int J Mach Learn Cybern. doi:10.1007/s13042-015-0444-4 Ma W, Che Y, Huang H, Ke H (2015) Resource-constrained project scheduling problem with uncertain durations and renewable resources. Int J Mach Learn Cybern. doi:10.​1007/​s13042-015-0444-4
35.
Zurück zum Zitat Kolisch R, Hartmann S (1999) Heuristic algorithms for the resourceconstrained project scheduling problem: classification and computational analysis. Project scheduling: recent models, algorithms and applications. Kluwer Academic Publishers, Netherlands, pp 147–178 Kolisch R, Hartmann S (1999) Heuristic algorithms for the resourceconstrained project scheduling problem: classification and computational analysis. Project scheduling: recent models, algorithms and applications. Kluwer Academic Publishers, Netherlands, pp 147–178
36.
Zurück zum Zitat Zhang X, Chen X (2012) A new uncertain programming model for project scheduling problem. Inf Int Interdisc J 15(10):3901–3910 Zhang X, Chen X (2012) A new uncertain programming model for project scheduling problem. Inf Int Interdisc J 15(10):3901–3910
Metadaten
Titel
Uncertain Resource-Constrained Project Scheduling Problem with Net Present Value Criterion for Risk-Averse Decision Makers
verfasst von
Chenkai Zhao
Hua Ke
Copyright-Jahr
2017
Verlag
Springer Singapore
DOI
https://doi.org/10.1007/978-981-10-2920-2_48