Skip to main content

2018 | OriginalPaper | Buchkapitel

A Decomposition Method for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem (MRCMPSP)

verfasst von : Mathias Kühn, Sebastian Dirkmann, Michael Völker, Thorsten Schmidt

Erschienen in: Operations Research Proceedings 2016

Verlag: Springer International Publishing

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

Multi-Mode Resource-Constrained Multi-Project Scheduling Problems (MRCMPSP) with large solution search spaces cannot be optimized in an acceptable computation time. In this paper, we have focused on decomposition strategies for such large scale problems. Based on literature review a time-based decomposition approach was adopted for the present problem. With time-based decomposition approaches a schedule is divided into several time periods. All activities in a time period describe an independent problem, termed as a sub-problem. Due to the independent optimization of these sub-problems project information regarding the relationships among activities in different time periods is not considered. This loss of information has a negative impact on the overall solution quality. We developed a decomposition strategy to improve the interactions between the sub-problems for a better target performance while reducing the computation time. Based on an initial solution the sub-problems are created and sequentially optimized in a concept similar to rolling horizon heuristics. We introduce a transition stage with a constant and a variable component at the end of each partial schedule to improve the interactions among sub-problems and thus taking the volatile nature of the examined problems into account. In comparison, our approach proved to provide significant improvements in runtime and target performance.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Angelidis, E., Bohn, D., Rose, O., Carl, S.: Simulation-based optimization for complex assembly lines with workforce constraints. Simulation in Produktion und Logistik (2013) Angelidis, E., Bohn, D., Rose, O., Carl, S.: Simulation-based optimization for complex assembly lines with workforce constraints. Simulation in Produktion und Logistik (2013)
2.
Zurück zum Zitat Blazewicz, J., Lenstra, J., Kan, A.: Scheduling subject to resource constraints: classification and complexity. Discrete Appl. Math. 5(1), 11–24 (1983)CrossRef Blazewicz, J., Lenstra, J., Kan, A.: Scheduling subject to resource constraints: classification and complexity. Discrete Appl. Math. 5(1), 11–24 (1983)CrossRef
3.
Zurück zum Zitat Can, A., Ulusoy, G.: Multi-project scheduling with two-stage decomposition. Ann. Oper. Res. 217(1), 95–116 (2014)CrossRef Can, A., Ulusoy, G.: Multi-project scheduling with two-stage decomposition. Ann. Oper. Res. 217(1), 95–116 (2014)CrossRef
4.
Zurück zum Zitat Hartmann, S., Briskorn, D.: A survey of variants and extensions of the resource-constrained project scheduling problem. Eur. J. Oper. Res. 207, 1–14 (2010)CrossRef Hartmann, S., Briskorn, D.: A survey of variants and extensions of the resource-constrained project scheduling problem. Eur. J. Oper. Res. 207, 1–14 (2010)CrossRef
5.
Zurück zum Zitat Kolisch, R., Padman, R.: An integrated survey of deterministic project scheduling. Omega 29(3), 249–272 (2001)CrossRef Kolisch, R., Padman, R.: An integrated survey of deterministic project scheduling. Omega 29(3), 249–272 (2001)CrossRef
6.
Zurück zum Zitat Ovacik, I.M., Uzsoy, R.: Decomposition Methods for Complex Factory Scheduling Problems. Springer Science & Business Media (1997) Ovacik, I.M., Uzsoy, R.: Decomposition Methods for Complex Factory Scheduling Problems. Springer Science & Business Media (1997)
7.
Zurück zum Zitat Toffolo, T., Santos, H.G., Carvalho, M.A.M., Soares, J.A.: An integer programming approach to the multimode resource-constrained multiproject scheduling problem. J. Sched. 19(3), 295–307 (2016) Toffolo, T., Santos, H.G., Carvalho, M.A.M., Soares, J.A.: An integer programming approach to the multimode resource-constrained multiproject scheduling problem. J. Sched. 19(3), 295–307 (2016)
8.
Zurück zum Zitat Wauters, T., Kinable, J., Smet, P., Vancroonenburg, W., Berghe, G.V., Verstichel, J.: The multi-mode resource-constrained multi-project scheduling problem. J. Sched. 19(3), 271–283 (2016) Wauters, T., Kinable, J., Smet, P., Vancroonenburg, W., Berghe, G.V., Verstichel, J.: The multi-mode resource-constrained multi-project scheduling problem. J. Sched. 19(3), 271–283 (2016)
Metadaten
Titel
A Decomposition Method for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem (MRCMPSP)
verfasst von
Mathias Kühn
Sebastian Dirkmann
Michael Völker
Thorsten Schmidt
Copyright-Jahr
2018
DOI
https://doi.org/10.1007/978-3-319-55702-1_69

Premium Partner