Skip to main content

2013 | OriginalPaper | Buchkapitel

26. Agent Based Railway Network Rescheduling System

verfasst von : Li Wang, Yong Qin, Jie Xu, Limin Jia

Erschienen in: Proceedings of 2013 Chinese Intelligent Automation Conference

Verlag: Springer Berlin Heidelberg

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

An agent based train rescheduling system for the railway network is introduced. The system is formed by four layers that including implementation layer, section rescheduling layer, line rescheduling layer and network rescheduling layer from bottom to top of the system. Four kinds of rescheduling agents are involved in each layer based on its feature. The agents in the same layer or in the neighbor layers can communicate with each other. The agent based network train rescheduling system benefits to get a global optimization in the perspective of railway network. In the end a simulation on Beijing-Shanghai high speed railway is realized to prove the system effectiveness.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Li F, Gao Z, Li K, Yang L (2008) Efficient scheduling of railway traffic based on global information of train. Transp Res Part B 42(2008):1008–1030CrossRef Li F, Gao Z, Li K, Yang L (2008) Efficient scheduling of railway traffic based on global information of train. Transp Res Part B 42(2008):1008–1030CrossRef
2.
Zurück zum Zitat Zhang L, Li P, Jia L (2004) Study on the simulation for train operation adjustment under moving block. J Syst Simul 16(10):2257–2263 (in Chinese) Zhang L, Li P, Jia L (2004) Study on the simulation for train operation adjustment under moving block. J Syst Simul 16(10):2257–2263 (in Chinese)
3.
Zurück zum Zitat Meng X, Jia L, Qin Y (2010) Train timetable optimizing and rescheduling based on improved particle swarm algorithm. Transp Res Rec 2197(1):71–79CrossRef Meng X, Jia L, Qin Y (2010) Train timetable optimizing and rescheduling based on improved particle swarm algorithm. Transp Res Rec 2197(1):71–79CrossRef
4.
Zurück zum Zitat Joaquin R (2007) A constraint programming model for real-time train scheduling at junctions. Transp Res Part B 41(2):231–245CrossRef Joaquin R (2007) A constraint programming model for real-time train scheduling at junctions. Transp Res Part B 41(2):231–245CrossRef
5.
6.
Zurück zum Zitat Lu F, Song M, Tian G (2007) Method for subway operation adjustment based on multi-agent. China Railway Sci 28(1):123–126 (in Chinese) Lu F, Song M, Tian G (2007) Method for subway operation adjustment based on multi-agent. China Railway Sci 28(1):123–126 (in Chinese)
7.
Zurück zum Zitat Wang L, Jia L (2011) A two-layer optimization model for high-speed railway line planning. J Zhejiang Univ Sci A 12(1):902–912CrossRef Wang L, Jia L (2011) A two-layer optimization model for high-speed railway line planning. J Zhejiang Univ Sci A 12(1):902–912CrossRef
Metadaten
Titel
Agent Based Railway Network Rescheduling System
verfasst von
Li Wang
Yong Qin
Jie Xu
Limin Jia
Copyright-Jahr
2013
Verlag
Springer Berlin Heidelberg
DOI
https://doi.org/10.1007/978-3-642-38460-8_26

Neuer Inhalt