Skip to main content
Erschienen in: Transportation 3/2011

01.05.2011

Analysis of cost estimation disclosure in environmental impact statements for surface transportation projects

verfasst von: Joseph Sturm, Mashrur Chowdhury, Anne Dunning, Jennifer Ogle

Erschienen in: Transportation | Ausgabe 3/2011

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

Reliability in cost estimates in publicly funded projects is more important today than ever with increased governmental funding to infrastructure projects and associated accountability requirements, but surface transportation projects, large and small, in the United States have a legacy of cost overruns. The problems with these overruns start with the cost estimation process before projects begin. Studies have shown that early cost estimations reflect best-case scenarios rather than realistic expectations, and have attributed technical, economic, psychological, and political reasons for underestimation. The primary objectives of this research were to determine how costs have been presented and updated in environmental impact statements, to identify endemic technical problems with cost estimation during the environmental review of surface transportation projects, and to develop recommendations for improving cost estimation and disclosure. Cost estimation methods were analyzed from the documents of 100 projects, including draft environmental impact statements, final environmental impact statements, and records of decision. The study concluded that the lack of guidance on how to include cost estimation in environmental review revealed itself in the level of detail and attention given to estimating costs. Agencies omitted or included various aspects of cost estimation randomly. Professional organizations should fill the gap of the need for specific guidance to cost estimation for environmental review so it can evolve as a state of the practice.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literatur
Zurück zum Zitat Anderson, S.D., Molenaar, K.R., Schexnayder, C.J., et al.: Guidance for cost estimation and management for highway projects during planning, programming, and preconstruction. NCHRP Report 574. Transportation Research Board, Washington, D.C. (2007) Anderson, S.D., Molenaar, K.R., Schexnayder, C.J., et al.: Guidance for cost estimation and management for highway projects during planning, programming, and preconstruction. NCHRP Report 574. Transportation Research Board, Washington, D.C. (2007)
Zurück zum Zitat Barry, R.: For major projects, risk management brings real world rewards. Routes/Roads, No. 329, pp. 56–63 (2006) Barry, R.: For major projects, risk management brings real world rewards. Routes/Roads, No. 329, pp. 56–63 (2006)
Zurück zum Zitat Bruzelus, N., Flyvbjerg, B., Rothengatter, W.: Big decisions, big risks, improving accountability in mega project, Transport Policy 9, pp. 143–154 (2002) Bruzelus, N., Flyvbjerg, B., Rothengatter, W.: Big decisions, big risks, improving accountability in mega project, Transport Policy 9, pp. 143–154 (2002)
Zurück zum Zitat Cantarelli, C., Flyvbjerg, B., Molin, E., Wee, B.: Cost overruns in large-scale transportation infrastructure projects explanations and their theoretical embeddedness. Eur. J. Transp. Infrastruct. Res. 10(1), 5–18 (2010) Cantarelli, C., Flyvbjerg, B., Molin, E., Wee, B.: Cost overruns in large-scale transportation infrastructure projects explanations and their theoretical embeddedness. Eur. J. Transp. Infrastruct. Res. 10(1), 5–18 (2010)
Zurück zum Zitat Crossett, J., Craig, S.: Costs related to compliance with federal environmental laws: Case studies in the Federal-Aid Highway Program. Final Report. Transtech Management, Inc. (2006) Crossett, J., Craig, S.: Costs related to compliance with federal environmental laws: Case studies in the Federal-Aid Highway Program. Final Report. Transtech Management, Inc. (2006)
Zurück zum Zitat Flyvbjerg, B.: Policy and planning for large infrastructure projects: problems, causes, cures. World Bank Policy Research Working Paper 3781 (2005) Flyvbjerg, B.: Policy and planning for large infrastructure projects: problems, causes, cures. World Bank Policy Research Working Paper 3781 (2005)
Zurück zum Zitat Flyvbjerg, B., Mette, S.H., Soren, B.: Underestimating costs in public works projects: error or lie? APA J. 68(3), 279–294 (2002) Flyvbjerg, B., Mette, S.H., Soren, B.: Underestimating costs in public works projects: error or lie? APA J. 68(3), 279–294 (2002)
Zurück zum Zitat Flyvbjerg, B., Mette, S.H., Soren, B.: How common and how large are cost overruns in transport infrastructure projects? Transp. Rev. 23(1), 71–88 (2003)CrossRef Flyvbjerg, B., Mette, S.H., Soren, B.: How common and how large are cost overruns in transport infrastructure projects? Transp. Rev. 23(1), 71–88 (2003)CrossRef
Zurück zum Zitat Flyvbjerg, B., Mette, S.H., Soren, B.: What causes cost overrun in transport infrastructure projects? Transp. Rev. 24(1), 3–18 (2004)CrossRef Flyvbjerg, B., Mette, S.H., Soren, B.: What causes cost overrun in transport infrastructure projects? Transp. Rev. 24(1), 3–18 (2004)CrossRef
Zurück zum Zitat Gabel, M., Reilly, J.J.: Lifting the veil. Roads Bridges 44(6), 102 (2006) Gabel, M., Reilly, J.J.: Lifting the veil. Roads Bridges 44(6), 102 (2006)
Zurück zum Zitat Landis, B.: Cost of route 195 Project has more than doubled since 1993. Provid. J. 26 Nov (2006) Landis, B.: Cost of route 195 Project has more than doubled since 1993. Provid. J. 26 Nov (2006)
Zurück zum Zitat Meyer, M., Miller, E.: Urban transportation planning: a decision-oriented approach. McGraw-Hill, New York (2001) Meyer, M., Miller, E.: Urban transportation planning: a decision-oriented approach. McGraw-Hill, New York (2001)
Zurück zum Zitat Molenaar, K.R.: Programmatic cost risk analysis for highway megaprojects. J. Constr. Eng. Manag. pp. 343–353 (2005) Molenaar, K.R.: Programmatic cost risk analysis for highway megaprojects. J. Constr. Eng. Manag. pp. 343–353 (2005)
Zurück zum Zitat Moore, D.S., McCabe, G.P.: Introduction to the practice of statistics, 4th edn. W. H. Freeman and Company, New York (2003) Moore, D.S., McCabe, G.P.: Introduction to the practice of statistics, 4th edn. W. H. Freeman and Company, New York (2003)
Zurück zum Zitat Pickrell, D.: A desire named streetcar fantasy and fact in rail transit planning. J. Am. Plan. Assoc. pp. 158–176 (1992) Pickrell, D.: A desire named streetcar fantasy and fact in rail transit planning. J. Am. Plan. Assoc. pp. 158–176 (1992)
Zurück zum Zitat Reilly, J.J.: Cost estimating, probable cost, risk identification, and risk management for infrastructure/rail projects. Investing today for a brighter tomorrow, Proceedings of the 2006 rail conference. American Public Transportation Association (2006) Reilly, J.J.: Cost estimating, probable cost, risk identification, and risk management for infrastructure/rail projects. Investing today for a brighter tomorrow, Proceedings of the 2006 rail conference. American Public Transportation Association (2006)
Zurück zum Zitat Sangrey, D., Keith, S.: Training on cost estimating for major projects. Corson Av Training Room in Seattle. 20–21 Oct (2005) Sangrey, D., Keith, S.: Training on cost estimating for major projects. Corson Av Training Room in Seattle. 20–21 Oct (2005)
Zurück zum Zitat Sangrey, D., Roberds, W., Reilly, J., et al.: Cost and schedule estimates for large transportation projects: a new approach to solving an old problem. The Transportation Factor 2003. Annual Conference and Exhibition of the Transportation Association of Canada. Transportation Association of Canada (2003) Sangrey, D., Roberds, W., Reilly, J., et al.: Cost and schedule estimates for large transportation projects: a new approach to solving an old problem. The Transportation Factor 2003. Annual Conference and Exhibition of the Transportation Association of Canada. Transportation Association of Canada (2003)
Zurück zum Zitat Siemiatycki, M.: Managing optimism biases in the delivery of large-infrastructure projects: a corporate performance benchmarking approach. Eur. J. Transp. Infrastruct. Res. 10(1), 30–41 (2010) Siemiatycki, M.: Managing optimism biases in the delivery of large-infrastructure projects: a corporate performance benchmarking approach. Eur. J. Transp. Infrastruct. Res. 10(1), 30–41 (2010)
Zurück zum Zitat Sinnette, J.: Building public trust. Public Roads 68(1), pp 16–21, July/August (2004) Sinnette, J.: Building public trust. Public Roads 68(1), pp 16–21, July/August (2004)
Zurück zum Zitat United States House of Representatives Report 108-792: Report to Congress on Costs Associated with the Environmental Process: Impacts of Federal Environmental Requirements on Federal-Aid Highway Project Costs. A Report to the Committee of Appropriations. Washington, DC. 31 July (2006) United States House of Representatives Report 108-792: Report to Congress on Costs Associated with the Environmental Process: Impacts of Federal Environmental Requirements on Federal-Aid Highway Project Costs. A Report to the Committee of Appropriations. Washington, DC. 31 July (2006)
Zurück zum Zitat Wee, B.: Rail infrastructure: challenges for cost-benefit analysis and other ex ante evaluations. Transp. Plan. Technol. 30(1), 31–48 (2007)CrossRef Wee, B.: Rail infrastructure: challenges for cost-benefit analysis and other ex ante evaluations. Transp. Plan. Technol. 30(1), 31–48 (2007)CrossRef
Metadaten
Titel
Analysis of cost estimation disclosure in environmental impact statements for surface transportation projects
verfasst von
Joseph Sturm
Mashrur Chowdhury
Anne Dunning
Jennifer Ogle
Publikationsdatum
01.05.2011
Verlag
Springer US
Erschienen in
Transportation / Ausgabe 3/2011
Print ISSN: 0049-4488
Elektronische ISSN: 1572-9435
DOI
https://doi.org/10.1007/s11116-010-9313-x

Weitere Artikel der Ausgabe 3/2011

Transportation 3/2011 Zur Ausgabe

    Premium Partner