Skip to main content

2021 | OriginalPaper | Buchkapitel

Construction Field Management Using a Popular Text Messenger

verfasst von : Ghang Lee, Jehyun Cho, Taeseok Song, Hyunsung Roh, Jeaeun Jung, Jihoon Chung, Gunwoo Yong, David Jeong

Erschienen in: Proceedings of the 18th International Conference on Computing in Civil and Building Engineering

Verlag: Springer International Publishing

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

This paper introduces a method for managing daily construction tasks using a text messenger and a tool to support the method. Many construction field management tools have been developed and used in practice. In addition, each company has developed its own construction task management tools. Nevertheless, due to the number of various tools available, contractors and subcontractors suffer from installing at least three or four applications on mobile devices to support different projects. To resolve this issue, the authors developed ProjectHub-CL (Construction Listener), a method and tool to manage daily construction tasks using a popular text messenger that doesn’t require the installation of an additional mobile app. It helps field engineers and subcontractors to exchange and manage field tasks using text messages and additional features on a text messenger and can automatically produce a construction daily report at the end of the day as a result. The system was implemented on top of KakaoTalk, the most popular text messenger in South Korea. Its applicability and usability in the field were validated with contractors and subcontractors in four different projects (conducted by different general contractors).

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Song, T.: Extracting daily report information from text messages between the field managers. Master, Architecture & Architectural Engineering, Yonsei University (2018) Song, T.: Extracting daily report information from text messages between the field managers. Master, Architecture & Architectural Engineering, Yonsei University (2018)
2.
Zurück zum Zitat Russell, A.D.: Computerized daily site reporting. J. Constr. Eng. Manag. 119(2), 385–402 (1993)CrossRef Russell, A.D.: Computerized daily site reporting. J. Constr. Eng. Manag. 119(2), 385–402 (1993)CrossRef
3.
Zurück zum Zitat Kim, H., Choi, J., Lim, H., Song, Y.: A study on the improvement of work management through the rationalization of daily construction reports. Daelim Tech. Rev. 14 (1999) Kim, H., Choi, J., Lim, H., Song, Y.: A study on the improvement of work management through the rationalization of daily construction reports. Daelim Tech. Rev. 14 (1999)
4.
Zurück zum Zitat Shiau, Y.-C., Wang, W.-C.: Daily report module for construction management information system. In: Proceedings of the 20th International Symposium on Automation and Robotics in Construction (2003) Shiau, Y.-C., Wang, W.-C.: Daily report module for construction management information system. In: Proceedings of the 20th International Symposium on Automation and Robotics in Construction (2003)
5.
Zurück zum Zitat Na, K.-s., Kim, T.-h., Kim, S.-k.: A study on development of project management system with daily report, pp. 459–462. Architectural Institute of Korea (2003) Na, K.-s., Kim, T.-h., Kim, S.-k.: A study on development of project management system with daily report, pp. 459–462. Architectural Institute of Korea (2003)
6.
Zurück zum Zitat Kim, B.-n., Kim, C.-D., Ee, H.-S., Kim, S.-K., Seo, S.-W.: The analysis of current daily-report system and the proposal of improvement framework. Kor. J. Constr. Eng. Manag. 4(2), 66–73 (2003) Kim, B.-n., Kim, C.-D., Ee, H.-S., Kim, S.-K., Seo, S.-W.: The analysis of current daily-report system and the proposal of improvement framework. Kor. J. Constr. Eng. Manag. 4(2), 66–73 (2003)
7.
Zurück zum Zitat Seo, H.-J., Koo, K.-J., Um, I.-J.: Web-based coordination system for daily work report between contractor and subcontractor. In: Conference of Korea Institute of Construction Engineering and Management, pp. 370–375 (2004) Seo, H.-J., Koo, K.-J., Um, I.-J.: Web-based coordination system for daily work report between contractor and subcontractor. In: Conference of Korea Institute of Construction Engineering and Management, pp. 370–375 (2004)
8.
Zurück zum Zitat Bowden, S., Dorr, A., Thorpe, A., Anumba, C., Gooding, P.: Making the case for mobile IT in construction. Comput. Civ. Eng., 1–12 (2005) Bowden, S., Dorr, A., Thorpe, A., Anumba, C., Gooding, P.: Making the case for mobile IT in construction. Comput. Civ. Eng., 1–12 (2005)
9.
Zurück zum Zitat Lee W.-J., Choe W.-U.: Case of application of Smartphone construction industry - GS EIP + TPMS using smart phone. Kor. Inst. Constr. Eng. Manag. 11(5), 30–34 (2010) Lee W.-J., Choe W.-U.: Case of application of Smartphone construction industry - GS EIP + TPMS using smart phone. Kor. Inst. Constr. Eng. Manag. 11(5), 30–34 (2010)
10.
Zurück zum Zitat Kim, B.-S., Kang, Y.-m., Kim, M.-J., Park, J.-M., Kim, O.-K., Choi, B.-J.: Labor management process of a construction site using Smart Phone. In: Conference of the Regional Association of Architectural Institute of Korea, pp. 357–360 (2011) Kim, B.-S., Kang, Y.-m., Kim, M.-J., Park, J.-M., Kim, O.-K., Choi, B.-J.: Labor management process of a construction site using Smart Phone. In: Conference of the Regional Association of Architectural Institute of Korea, pp. 357–360 (2011)
11.
Zurück zum Zitat Lee, K.-P., Lee, H.-S., Park, M., Kim, E.: Construction material management using smart mobile computing. In: Conference of Korea Institute of Construction Engineering and Management, pp. 59–69 (2011) Lee, K.-P., Lee, H.-S., Park, M., Kim, E.: Construction material management using smart mobile computing. In: Conference of Korea Institute of Construction Engineering and Management, pp. 59–69 (2011)
12.
Zurück zum Zitat Tserng, H.P., Dzeng, R.J., Lin, Y.C., Lin, S.T.: Mobile construction supply chain management using PDA and bar codes. Comput.-Aided Civ. Infrastruct. Eng. 20(4), 242–264 (2005) Tserng, H.P., Dzeng, R.J., Lin, Y.C., Lin, S.T.: Mobile construction supply chain management using PDA and bar codes. Comput.-Aided Civ. Infrastruct. Eng. 20(4), 242–264 (2005)
13.
Zurück zum Zitat Irizarry, J., Gill, T.: Mobile applications for information access on construction jobsites. In: Computing in Civil Engineering, pp. 176–185 (2009) Irizarry, J., Gill, T.: Mobile applications for information access on construction jobsites. In: Computing in Civil Engineering, pp. 176–185 (2009)
14.
Zurück zum Zitat Park, M., Kim, E., Lee, H.-S., Lee, K., Suh, S.-W.: Real time safety management framework at construction site based on smart mobile. Kor. Inst. Constr. Eng. Manag. 14(4) (2013) Park, M., Kim, E., Lee, H.-S., Lee, K., Suh, S.-W.: Real time safety management framework at construction site based on smart mobile. Kor. Inst. Constr. Eng. Manag. 14(4) (2013)
15.
Zurück zum Zitat Chun, S.B., Lee, B.B., Yoon, J.G., Kim, H.D.: Development of the BIM-based mobile field management system. In: Conference of Korean Society of Civil Engineers, pp. 4–7 (2013) Chun, S.B., Lee, B.B., Yoon, J.G., Kim, H.D.: Development of the BIM-based mobile field management system. In: Conference of Korean Society of Civil Engineers, pp. 4–7 (2013)
16.
Zurück zum Zitat Shin, Y., Kim, D., Kim, T.-Y., Kim, G.-H.: Daily reporting system using digital pen at construction site. J. Kor. Inst. Build. Constr. 16(2), 177–183 (2016)CrossRef Shin, Y., Kim, D., Kim, T.-Y., Kim, G.-H.: Daily reporting system using digital pen at construction site. J. Kor. Inst. Build. Constr. 16(2), 177–183 (2016)CrossRef
17.
Zurück zum Zitat Sattineni, A., Schmidt, T.: Implementation of mobile devices on jobsites in the construction industry. Procedia Eng. 123, 488–495 (2015) Sattineni, A., Schmidt, T.: Implementation of mobile devices on jobsites in the construction industry. Procedia Eng. 123, 488–495 (2015)
18.
Zurück zum Zitat Ahn, C.-S., Yoon, S.-W., Chin, S.-Y.: Diligence and indolence management system for specialty contractor on construction site -using GPS of smart phone. Kor. J. Constr. Eng. Manag. 13(3), 56–66 (2012) Ahn, C.-S., Yoon, S.-W., Chin, S.-Y.: Diligence and indolence management system for specialty contractor on construction site -using GPS of smart phone. Kor. J. Constr. Eng. Manag. 13(3), 56–66 (2012)
19.
Zurück zum Zitat Hegazy, T., Abdel-Monem, M.: Email-based system for documenting construction as-built details. Autom. Constr. 24, 130–137 (2012)CrossRef Hegazy, T., Abdel-Monem, M.: Email-based system for documenting construction as-built details. Autom. Constr. 24, 130–137 (2012)CrossRef
20.
Zurück zum Zitat Kim, C., Park, T., Lim, H., Kim, H.: On-site construction management using mobile computing technology. Autom. Constr. 35, 415–423 (2013)CrossRef Kim, C., Park, T., Lim, H., Kim, H.: On-site construction management using mobile computing technology. Autom. Constr. 35, 415–423 (2013)CrossRef
21.
Zurück zum Zitat Choi, Y.-g., Yoon, S.-W., Chin, S.: Integrated manpower information systems on construction site - using RFID and QR-code. Kor. Inst. Constr. Eng. Manag. 12(4) (2011) Choi, Y.-g., Yoon, S.-W., Chin, S.: Integrated manpower information systems on construction site - using RFID and QR-code. Kor. Inst. Constr. Eng. Manag. 12(4) (2011)
22.
Zurück zum Zitat Moon, J.-B., Seo, C.-Y., Kim, C.-D.: Analyzing the improvement of the RFID system and the proposal of project manpower management system using QR-code. In: Conference of Korea Institute of Construction Engineering and Management, p. 4 (2016) Moon, J.-B., Seo, C.-Y., Kim, C.-D.: Analyzing the improvement of the RFID system and the proposal of project manpower management system using QR-code. In: Conference of Korea Institute of Construction Engineering and Management, p. 4 (2016)
23.
Zurück zum Zitat Ferrada, X., Sepúlveda, M., Serpell, A., Núñez, D., Neyem, A.: A lessons-learned mobile system for construction companies: motivation and design. Procedia Eng. 85, 157–165 (2014)CrossRef Ferrada, X., Sepúlveda, M., Serpell, A., Núñez, D., Neyem, A.: A lessons-learned mobile system for construction companies: motivation and design. Procedia Eng. 85, 157–165 (2014)CrossRef
24.
Zurück zum Zitat Ahn, J., Kim, N., Chin, S.: An SNS based construction information communication and sharing system. Kor. J. Constr. Eng. Manag. 15(5), 115–126 (2014) Ahn, J., Kim, N., Chin, S.: An SNS based construction information communication and sharing system. Kor. J. Constr. Eng. Manag. 15(5), 115–126 (2014)
25.
Zurück zum Zitat Kim, Y.-H., Kim, G.-H., Kim, C.-D.: The improvement of the apartment housing defect management using group type SNS application. In: Conference of Korea Institute of Construction Engineering and Management, pp. 70–73 (2015) Kim, Y.-H., Kim, G.-H., Kim, C.-D.: The improvement of the apartment housing defect management using group type SNS application. In: Conference of Korea Institute of Construction Engineering and Management, pp. 70–73 (2015)
26.
Zurück zum Zitat Chin, S., Kang, W.-Y., Kim, Y.-S.: A development of task generator through an analysis of task location information structure. J. Kor. Inst. Constr. Eng. Manag. 5(2), 64–71 (2004) Chin, S., Kang, W.-Y., Kim, Y.-S.: A development of task generator through an analysis of task location information structure. J. Kor. Inst. Constr. Eng. Manag. 5(2), 64–71 (2004)
Metadaten
Titel
Construction Field Management Using a Popular Text Messenger
verfasst von
Ghang Lee
Jehyun Cho
Taeseok Song
Hyunsung Roh
Jeaeun Jung
Jihoon Chung
Gunwoo Yong
David Jeong
Copyright-Jahr
2021
DOI
https://doi.org/10.1007/978-3-030-51295-8_67