Skip to main content
Erschienen in: Logistics Research 1/2010

01.06.2010 | Original Paper

Controlling just-in-sequence flow-production

verfasst von: Sebastian Meissner

Erschienen in: Logistics Research | Ausgabe 1/2010

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

Analyses of the customer-order process in the automotive industry show that the vision of perfectly synchronized material flows in complex industrial production and logistics environments is still far from having become reality. The traditional strategy of maintaining high safety stock levels to counter the effects of ever more variety and uncertainty in the customer demand leads to unbearable cost in today’s competitive markets. Moreover, the responsiveness in the complex supply networks remains low. Thus, the goals of short order lead-times and on-time deliveries to customers are often missed. This places urgency onto the implementation of highly flexible logistics and production systems. The concept of just-in-sequence flow-production promises to allow for both accommodating rising degrees of product variety and cost efficiency. However, its success is dependent on reliable logistics and the ability to avoid turbulences within the material flows. Thus, it needs control of the stability of order sequences and intelligent strategies to hedge against any disturbances that cannot be proactively removed in the production flow. This paper suggests the introduction of systematic key performance indicators to make process instability transparent and manageable. Based on that, dimensioning methods for hedging against inherent sequence instability of production processes by means of physical or virtual re-sequencing are presented.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Fußnoten
1
This paper is based on parts of the doctorate dissertation of the author [14].
 
Literatur
1.
Zurück zum Zitat Alford D, Sackett P, Nelder G (2000) Mass customisation—an automotive perspective. Int J Prod Econ 65:99–110CrossRef Alford D, Sackett P, Nelder G (2000) Mass customisation—an automotive perspective. Int J Prod Econ 65:99–110CrossRef
2.
Zurück zum Zitat Bucklin LP (1965) Postponement, speculation and structure of distribution channels. J Mark Res 2:26–32CrossRef Bucklin LP (1965) Postponement, speculation and structure of distribution channels. J Mark Res 2:26–32CrossRef
3.
Zurück zum Zitat Coronado AE et al (2004) Enabling mass customization: extending built-to-order concepts to supply chains. Prod Plan Control 15(4):398–411CrossRef Coronado AE et al (2004) Enabling mass customization: extending built-to-order concepts to supply chains. Prod Plan Control 15(4):398–411CrossRef
4.
Zurück zum Zitat Dannenberg J, Gehr F, Hellingrath B, Kleinhans C (2004) Future Automotive Industry Structure (FAST) 2015. Materialien zur Automobilindustrie (32), VDA, Frankfurt Dannenberg J, Gehr F, Hellingrath B, Kleinhans C (2004) Future Automotive Industry Structure (FAST) 2015. Materialien zur Automobilindustrie (32), VDA, Frankfurt
5.
Zurück zum Zitat Ding FY, Sun H (2004) Sequence alteration and restoration related to sequenced parts delivery on an automobile mixed-model assembly line with multiple departments. Int J Prod Res 42(8):1525–1543CrossRef Ding FY, Sun H (2004) Sequence alteration and restoration related to sequenced parts delivery on an automobile mixed-model assembly line with multiple departments. Int J Prod Res 42(8):1525–1543CrossRef
6.
Zurück zum Zitat Fredriksson P, Gadde LE (2005) Flexibility and rigidity in customizing and build-to-order production. Int Mark Manag 34:695–705CrossRef Fredriksson P, Gadde LE (2005) Flexibility and rigidity in customizing and build-to-order production. Int Mark Manag 34:695–705CrossRef
7.
Zurück zum Zitat Grinninger J, Meissner S (2007) Durchlaufzeitstabilisierung in der Automobilfertigung. PPS Manag 1:80–83 Grinninger J, Meissner S (2007) Durchlaufzeitstabilisierung in der Automobilfertigung. PPS Manag 1:80–83
8.
Zurück zum Zitat Guenthner WA, Schröder J, Meissner S, Grinninger J (2009) Potentiale des Konzepts der stabilen Auftragsfolge in der automobilen Wertschöpfungskette. München Guenthner WA, Schröder J, Meissner S, Grinninger J (2009) Potentiale des Konzepts der stabilen Auftragsfolge in der automobilen Wertschöpfungskette. München
9.
Zurück zum Zitat Gusikhin O, Caprihan R, Stecke KE (2008) Least in-sequence probability heuristic for mixed-volume production lines. Int J Prod Res 3(46):647–673CrossRef Gusikhin O, Caprihan R, Stecke KE (2008) Least in-sequence probability heuristic for mixed-volume production lines. Int J Prod Res 3(46):647–673CrossRef
10.
Zurück zum Zitat Holweg M, Pil FK (2001) Successful built-to-order strategies—start with the customer. MIT Sloan Manag Rev (Fall):74–83 Holweg M, Pil FK (2001) Successful built-to-order strategies—start with the customer. MIT Sloan Manag Rev (Fall):74–83
11.
Zurück zum Zitat Holweg M, Pil FK (2005) Flexibility first—keeping the automotive supply chain responsive through built-to-order. Ind Eng 37(6):46–51 Holweg M, Pil FK (2005) Flexibility first—keeping the automotive supply chain responsive through built-to-order. Ind Eng 37(6):46–51
12.
13.
Zurück zum Zitat Meissner S, Grinninger J, Kammermeier F (2008) Stabilisierung des Auftragsabwicklungsprozesses durch flexible Auftragszuordnung. Z wirtsch Fabr (ZWF) 103(12):893–897 Meissner S, Grinninger J, Kammermeier F (2008) Stabilisierung des Auftragsabwicklungsprozesses durch flexible Auftragszuordnung. Z wirtsch Fabr (ZWF) 103(12):893–897
14.
Zurück zum Zitat Meissner S (2009) Logistische Stabilität in der automobilen Variantenfließfertigung. Dissertation, Technische Universität München Meissner S (2009) Logistische Stabilität in der automobilen Variantenfließfertigung. Dissertation, Technische Universität München
15.
Zurück zum Zitat Meyr H (2004) Supply chain planning in the German automotive industry. OR Spectr 26(4):447–470MATHCrossRef Meyr H (2004) Supply chain planning in the German automotive industry. OR Spectr 26(4):447–470MATHCrossRef
16.
Zurück zum Zitat Moessmer HE, Schedlbauer M, Günthner WA (2007) Die automobile Welt im Umbruch. In: Günthner WA (ed) Neue Wege in der Automobillogistik. Springer, Berlin, pp 3–15CrossRef Moessmer HE, Schedlbauer M, Günthner WA (2007) Die automobile Welt im Umbruch. In: Günthner WA (ed) Neue Wege in der Automobillogistik. Springer, Berlin, pp 3–15CrossRef
17.
Zurück zum Zitat Monden Y (1998) Toyota production system. Eng Manag Press, Norcross Monden Y (1998) Toyota production system. Eng Manag Press, Norcross
18.
Zurück zum Zitat Roodbergen KJ, Vis IFA (2009) A survey of literature on automated storage and retrieval systems. Eur J Oper Res 194(2):343–362MATHCrossRef Roodbergen KJ, Vis IFA (2009) A survey of literature on automated storage and retrieval systems. Eur J Oper Res 194(2):343–362MATHCrossRef
19.
Zurück zum Zitat Spieckermann S, Gutenschwager K, Voß S (2004) A sequential ordering problem in automotive paint shops. Int J Prod Res 42(9):1865–1878MATHCrossRef Spieckermann S, Gutenschwager K, Voß S (2004) A sequential ordering problem in automotive paint shops. Int J Prod Res 42(9):1865–1878MATHCrossRef
20.
Zurück zum Zitat Voigt KI, Saatmann M, Schorr S (2007) Flexibilität im Netzwerk–dargestellt am Beispiel der Automobilindustrie. In: Hausladen I (ed) Management am Puls der Zeit. TCW Transfer-Centrum, München, pp 1071–1090 Voigt KI, Saatmann M, Schorr S (2007) Flexibilität im Netzwerk–dargestellt am Beispiel der Automobilindustrie. In: Hausladen I (ed) Management am Puls der Zeit. TCW Transfer-Centrum, München, pp 1071–1090
21.
Zurück zum Zitat Weyer M (2002) Das Produktionssteuerungskonzept Perlenkette und dessen Kennzahlensystem. Helmesverlag-Karlsruhe, Karlsruhe Weyer M (2002) Das Produktionssteuerungskonzept Perlenkette und dessen Kennzahlensystem. Helmesverlag-Karlsruhe, Karlsruhe
Metadaten
Titel
Controlling just-in-sequence flow-production
verfasst von
Sebastian Meissner
Publikationsdatum
01.06.2010
Verlag
Springer Berlin Heidelberg
Erschienen in
Logistics Research / Ausgabe 1/2010
Print ISSN: 1865-035X
Elektronische ISSN: 1865-0368
DOI
https://doi.org/10.1007/s12159-010-0026-5

Weitere Artikel der Ausgabe 1/2010

Logistics Research 1/2010 Zur Ausgabe