Skip to main content

2019 | OriginalPaper | Buchkapitel

4. Delay-Time Maintenance Models for Technical Systems

verfasst von : Sylwia Werbińska-Wojciechowska

Erschienen in: Technical System Maintenance

Verlag: Springer International Publishing

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

The chapter presents a literature review on delay-time modelling for single- and multi-unit (complex) systems. First, there are introduced the main definitions connected with this maintenance approach. Later, there is presented the analysis of known maintenance models being developed in this research area. The maintenance models for single-unit systems assume two-stage or three-stage failure processes implementation. The optimum policies are discussed, and their several modified and extended models are presented. The main extensions include imperfect inspection implementation, postponed replacement performance, or different types of failures investigation. The classification also includes optimality criterion, planning horizon, and used modelling method. In the case of complex systems, the discussed problems regard to e.g. models’ parameters estimation issues, case studies analysis, or hybrid modelling approach implementation. The main extensions of the developed models are discussed and summarized. At last, the main development directions in delay-time-based maintenance modelling are presented in a graphical form. The brief summary of the conducted literature review is provided with indicating the main research gaps in this modelling area.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literatur
2.
Zurück zum Zitat Alzubaidi HJ (1993) Maintenance modelling of a major hospital complex. Ph.D. thesis, University of Salford, Salford Alzubaidi HJ (1993) Maintenance modelling of a major hospital complex. Ph.D. thesis, University of Salford, Salford
6.
Zurück zum Zitat Attia AF (1997) Estimation of the reliability function using the delay-time models. Microelectron Reliab 37(2):323–327CrossRef Attia AF (1997) Estimation of the reliability function using the delay-time models. Microelectron Reliab 37(2):323–327CrossRef
15.
Zurück zum Zitat Cai J, Zhu L (2011) A delay-time model with imperfect inspection for aircraft structure subject to a finite time horizon. In: Proceedings of IEEE international conference on grey systems and intelligent services 2011, Nanjing, China, 15–18 Sept 2011, pp 716–719. https://doi.org/10.1109/gsis.2011.6044102 Cai J, Zhu L (2011) A delay-time model with imperfect inspection for aircraft structure subject to a finite time horizon. In: Proceedings of IEEE international conference on grey systems and intelligent services 2011, Nanjing, China, 15–18 Sept 2011, pp 716–719. https://​doi.​org/​10.​1109/​gsis.​2011.​6044102
18.
Zurück zum Zitat Cerone P (1993) Inspection interval for maximum future reliability using the delay time model. Eur J Oper Res 68:236–250MATHCrossRef Cerone P (1993) Inspection interval for maximum future reliability using the delay time model. Eur J Oper Res 68:236–250MATHCrossRef
20.
Zurück zum Zitat Chilcott JB, Christer AH (1991) Modelling of condition based maintenance at the coal face. Int J Prod Econ 22:1–11CrossRef Chilcott JB, Christer AH (1991) Modelling of condition based maintenance at the coal face. Int J Prod Econ 22:1–11CrossRef
21.
Zurück zum Zitat Cho ID, Parlar M (1991) A survey of maintenance models for multi-unit systems. Eur J Oper Res 51(1):1–23CrossRef Cho ID, Parlar M (1991) A survey of maintenance models for multi-unit systems. Eur J Oper Res 51(1):1–23CrossRef
22.
Zurück zum Zitat Choi KM (1997) Semi-Markov and delay time models of maintenance. Ph.D. thesis, University of Salford, UK Choi KM (1997) Semi-Markov and delay time models of maintenance. Ph.D. thesis, University of Salford, UK
23.
Zurück zum Zitat Christer AH (2002) Review of delay time analysis for modelling plant maintenance. In: Osaki S (ed) Stochastic models in reliability and maintenance. Springer, Berlin Christer AH (2002) Review of delay time analysis for modelling plant maintenance. In: Osaki S (ed) Stochastic models in reliability and maintenance. Springer, Berlin
24.
Zurück zum Zitat Christer AH (1999) Developments in delay time analysis for modelling plant maintenance. J Oper Res Soc 50:1120–1137MATHCrossRef Christer AH (1999) Developments in delay time analysis for modelling plant maintenance. J Oper Res Soc 50:1120–1137MATHCrossRef
25.
Zurück zum Zitat Christer AH (1987) Delay-time model of reliability of equipment subject to inspection monitoring. J Oper Res Soc 38(4):329–334MATHCrossRef Christer AH (1987) Delay-time model of reliability of equipment subject to inspection monitoring. J Oper Res Soc 38(4):329–334MATHCrossRef
26.
Zurück zum Zitat Christer AH (1982) Modelling inspection policies for building maintenance. J Oper Res Soc 33:723–732CrossRef Christer AH (1982) Modelling inspection policies for building maintenance. J Oper Res Soc 33:723–732CrossRef
28.
Zurück zum Zitat Christer AH, Lee C (1997) Modelling ship operational reliability over a mission under regular inspections. J Oper Res Soc 48:688–699MATHCrossRef Christer AH, Lee C (1997) Modelling ship operational reliability over a mission under regular inspections. J Oper Res Soc 48:688–699MATHCrossRef
30.
Zurück zum Zitat Christer AH, Redmond DF (1992) Revising models of maintenance and inspection. Int J Prod Econ 24:227–234CrossRef Christer AH, Redmond DF (1992) Revising models of maintenance and inspection. Int J Prod Econ 24:227–234CrossRef
31.
Zurück zum Zitat Christer AH, Redmond DF (1990) A recent mathematical development in maintenance theory. IMA J Math Appl Bus Ind 2:97–108MathSciNetMATH Christer AH, Redmond DF (1990) A recent mathematical development in maintenance theory. IMA J Math Appl Bus Ind 2:97–108MathSciNetMATH
32.
Zurück zum Zitat Christer AH, Waller WM (1984) An operational research approach to planned maintenance: modelling PM for a vehicle fleet. J Oper Res Soc 35(11):967–984CrossRef Christer AH, Waller WM (1984) An operational research approach to planned maintenance: modelling PM for a vehicle fleet. J Oper Res Soc 35(11):967–984CrossRef
33.
Zurück zum Zitat Christer AH, Waller WM (1984) Reducing production downtime using delay-time analysis. J Oper Res Soc 35(6):499–512CrossRef Christer AH, Waller WM (1984) Reducing production downtime using delay-time analysis. J Oper Res Soc 35(6):499–512CrossRef
34.
Zurück zum Zitat Christer AH, Waller WM (1984) Delay time models of industrial inspection maintenance problems. J Oper Res Soc 35(5):401–406MATHCrossRef Christer AH, Waller WM (1984) Delay time models of industrial inspection maintenance problems. J Oper Res Soc 35(5):401–406MATHCrossRef
35.
Zurück zum Zitat Christer AH, Wang W (1995) A delay-time-based maintenance model of a multi-component system. IMA J Math Appl Bus Ind 6:205–222MATH Christer AH, Wang W (1995) A delay-time-based maintenance model of a multi-component system. IMA J Math Appl Bus Ind 6:205–222MATH
36.
Zurück zum Zitat Christer AH, Wang W (1992) A model of condition monitoring of a production plant. Int J Prod Res 30(9):2199–2211CrossRef Christer AH, Wang W (1992) A model of condition monitoring of a production plant. Int J Prod Res 30(9):2199–2211CrossRef
37.
Zurück zum Zitat Christer AH, Wang W, Baker RD (1995) Modelling maintenance practice of production plant using the delay-time concept. IMA J Math Appl Bus Ind 6:67–83MATH Christer AH, Wang W, Baker RD (1995) Modelling maintenance practice of production plant using the delay-time concept. IMA J Math Appl Bus Ind 6:67–83MATH
39.
Zurück zum Zitat Christer AH, Wang W, Choi K (1998) The delay-time modelling of preventive maintenance of plant given limited PM data and selective repair at PM. IMA J Math Appl Med Biol 15:355–379MATH Christer AH, Wang W, Choi K (1998) The delay-time modelling of preventive maintenance of plant given limited PM data and selective repair at PM. IMA J Math Appl Med Biol 15:355–379MATH
40.
Zurück zum Zitat Christer AH, Wang W, Sharp J, Baker RD (1998) A case study of modelling preventive maintenance of production plant using subjective data. J Oper Res Soc 49:210–219MATHCrossRef Christer AH, Wang W, Sharp J, Baker RD (1998) A case study of modelling preventive maintenance of production plant using subjective data. J Oper Res Soc 49:210–219MATHCrossRef
41.
Zurück zum Zitat Christer AH, Whitelaw J (1983) An operational research approach to breakdown maintenance: problem recognition. J Oper Res Soc 34(11):1041–1052CrossRef Christer AH, Whitelaw J (1983) An operational research approach to breakdown maintenance: problem recognition. J Oper Res Soc 34(11):1041–1052CrossRef
42.
Zurück zum Zitat Cui X (2002) Delay time modeling and software development. Ph.D. thesis, University of Salford, Salford Cui X (2002) Delay time modeling and software development. Ph.D. thesis, University of Salford, Salford
45.
Zurück zum Zitat Dekker R, Scarf PA (1998) On the impact of optimisation models in maintenance decision making: the state of the art. Reliab Eng Syst Saf 60:111–119 Dekker R, Scarf PA (1998) On the impact of optimisation models in maintenance decision making: the state of the art. Reliab Eng Syst Saf 60:111–119
47.
Zurück zum Zitat Emovon I (2016) Inspection interval determination for mechanical/service systems using an integrated PROMETHEE method and delay time model. J Mech Eng Technol 8(1):13–29 Emovon I (2016) Inspection interval determination for mechanical/service systems using an integrated PROMETHEE method and delay time model. J Mech Eng Technol 8(1):13–29
51.
Zurück zum Zitat Guo R, Ascher H, Love E (2000) Generalized models of repairable systems a survey via stochastic processes formalism. ORiON 16(2):87–128 Guo R, Ascher H, Love E (2000) Generalized models of repairable systems a survey via stochastic processes formalism. ORiON 16(2):87–128
52.
Zurück zum Zitat Jardine AKS, Hassounah MI (1990) An optimal vehicle-fleet inspection schedule. J Oper Res Soc 41(9):791–799CrossRef Jardine AKS, Hassounah MI (1990) An optimal vehicle-fleet inspection schedule. J Oper Res Soc 41(9):791–799CrossRef
54.
Zurück zum Zitat Jiang R (2013) Relationship between delay time and gamma process models. Chem Eng Trans 33:19–24 Jiang R (2013) Relationship between delay time and gamma process models. Chem Eng Trans 33:19–24
55.
Zurück zum Zitat Jiang R (2012) A timeliness-based optimal inspection interval associated with the delay time model. In: Proceedings of 2012 prognostics and system health management conference (PHM-2012 Beijing), pp 1–5 Jiang R (2012) A timeliness-based optimal inspection interval associated with the delay time model. In: Proceedings of 2012 prognostics and system health management conference (PHM-2012 Beijing), pp 1–5
56.
Zurück zum Zitat Jiang X-I, Zhao J-M, Li Z-W (2015) An optimal inspection policy for protection devices of electronic equipment using delay time model. Int J u- e- Serv, Sci Technol 8(8):169–178CrossRef Jiang X-I, Zhao J-M, Li Z-W (2015) An optimal inspection policy for protection devices of electronic equipment using delay time model. Int J u- e- Serv, Sci Technol 8(8):169–178CrossRef
57.
Zurück zum Zitat Jodejko-Pietruczuk A, Nowakowski T, Werbinska-Wojciechowska S (2013) Time between inspections optimization for technical object with time delay. J Pol Saf Reliab Assoc Proc Summer Saf Reliab Semin 4(1):35–41 Jodejko-Pietruczuk A, Nowakowski T, Werbinska-Wojciechowska S (2013) Time between inspections optimization for technical object with time delay. J Pol Saf Reliab Assoc Proc Summer Saf Reliab Semin 4(1):35–41
60.
Zurück zum Zitat Jodejko-Pietruczuk A, Werbinska-Wojciechowska S (2016) Influence of data uncertainty on the optimum inspection period in a multi-unit system maintained according to the block inspection policy. In: Dependability engineering and complex systems: proceedings of the eleventh international conference on dependability and complex systems DepCoS-RELCOMEX, Springer, Brunów, Poland, June 27–July 1 2016, pp 239–256 Jodejko-Pietruczuk A, Werbinska-Wojciechowska S (2016) Influence of data uncertainty on the optimum inspection period in a multi-unit system maintained according to the block inspection policy. In: Dependability engineering and complex systems: proceedings of the eleventh international conference on dependability and complex systems DepCoS-RELCOMEX, Springer, Brunów, Poland, June 27–July 1 2016, pp 239–256
61.
Zurück zum Zitat Jodejko-Pietruczuk A, Werbinska-Wojciechowska S (2015) Availability model of technical objects—block inspection policy implementation. In: Safety and reliability: methodology and applications: proceedings of the European safety and reliability conference, ESREL 2014, Wroclaw, Poland, CRC Press/Balkema, Leiden, 14–18 Sept 2014, pp 1275–1280CrossRef Jodejko-Pietruczuk A, Werbinska-Wojciechowska S (2015) Availability model of technical objects—block inspection policy implementation. In: Safety and reliability: methodology and applications: proceedings of the European safety and reliability conference, ESREL 2014, Wroclaw, Poland, CRC Press/Balkema, Leiden, 14–18 Sept 2014, pp 1275–1280CrossRef
62.
63.
Zurück zum Zitat Jodejko-Pietruczuk A, Werbinska-Wojciechowska S (2014) Analysis of maintenance models’ parameters estimation for technical systems with delay time. Eksploatacja i Niezawodnosc Maint Reliab 16(2):288–294 Jodejko-Pietruczuk A, Werbinska-Wojciechowska S (2014) Analysis of maintenance models’ parameters estimation for technical systems with delay time. Eksploatacja i Niezawodnosc Maint Reliab 16(2):288–294
64.
Zurück zum Zitat Jodejko-Pietruczuk A, Werbinska-Wojciechowska S (2012) Economical effectiveness of delay time approach using in time-based maintenance modelling. In: Proceedings of 11th international probabilistic safety assessment and management conference & the annual European safety and reliability conference, PSAM 11 & ESREL 2012, Helsinki, Finland, 25–29 June 2012, pp 1–10 Jodejko-Pietruczuk A, Werbinska-Wojciechowska S (2012) Economical effectiveness of delay time approach using in time-based maintenance modelling. In: Proceedings of 11th international probabilistic safety assessment and management conference & the annual European safety and reliability conference, PSAM 11 & ESREL 2012, Helsinki, Finland, 25–29 June 2012, pp 1–10
67.
Zurück zum Zitat Jones B, Jenkinson I, Wang J (2008) Application of the delay-time concept in a manufacturing industry. In: Proceedings of the 6th international conference on manufacturing research, Brunel University, London, UK, 9–11 Sept 2008, pp 23–28 Jones B, Jenkinson I, Wang J (2008) Application of the delay-time concept in a manufacturing industry. In: Proceedings of the 6th international conference on manufacturing research, Brunel University, London, UK, 9–11 Sept 2008, pp 23–28
69.
Zurück zum Zitat Lee C (1999) Applications of delay time theory to maintenance practice of complex plant. Ph.D. thesis, University of Salford, UK Lee C (1999) Applications of delay time theory to maintenance practice of complex plant. Ph.D. thesis, University of Salford, UK
70.
Zurück zum Zitat Leung FKN, Kit-Leung M (1996) Using delay-time analysis to study the maintenance problem of gearboxes. Int J Oper Prod Manag 16(12):98–105CrossRef Leung FKN, Kit-Leung M (1996) Using delay-time analysis to study the maintenance problem of gearboxes. Int J Oper Prod Manag 16(12):98–105CrossRef
71.
Zurück zum Zitat Leung FKN, Ma TW (1997) A study on the inspection frequency of fresh water pumps. Int J Ind Eng 4(1):42–51 Leung FKN, Ma TW (1997) A study on the inspection frequency of fresh water pumps. Int J Ind Eng 4(1):42–51
74.
Zurück zum Zitat Liu X, Wang W, Peng R (2015) An integrated production and delay-time based preventive maintenance planning model for a multi-product production system. Eksploatacja i Niezawodnosc Maint and Reliab 17(2): 215–221CrossRef Liu X, Wang W, Peng R (2015) An integrated production and delay-time based preventive maintenance planning model for a multi-product production system. Eksploatacja i Niezawodnosc Maint and Reliab 17(2): 215–221CrossRef
77.
Zurück zum Zitat Lv W, Wang W (2011) Modelling preventive maintenance based on the delay time concept in the context of a case study. Eksploatacja i Niezawodnosc Maint Reliab 3:5–11 Lv W, Wang W (2011) Modelling preventive maintenance based on the delay time concept in the context of a case study. Eksploatacja i Niezawodnosc Maint Reliab 3:5–11
78.
Zurück zum Zitat Ma X, Wang W, Liu X, Peng R (2017) Optimal inspection and replacement strategy for systems subject to two types of failures with adjustable inspection intervals. J Shanghai Jiao Tong Univ 22(6):752–755CrossRef Ma X, Wang W, Liu X, Peng R (2017) Optimal inspection and replacement strategy for systems subject to two types of failures with adjustable inspection intervals. J Shanghai Jiao Tong Univ 22(6):752–755CrossRef
79.
Zurück zum Zitat Mahfoud H, El Barkany A, El Biyaali A (2016) Cost effectiveness of healthcare maintenance policy: a new proportional delay time model. Int J Perform Eng 12(5):433–450 Mahfoud H, El Barkany A, El Biyaali A (2016) Cost effectiveness of healthcare maintenance policy: a new proportional delay time model. Int J Perform Eng 12(5):433–450
82.
Zurück zum Zitat Mazzuchi TA, Van Noortwijk JM, Kallen MJ (2007) Maintenance optimization. Technical Report, TR-2007-9 Mazzuchi TA, Van Noortwijk JM, Kallen MJ (2007) Maintenance optimization. Technical Report, TR-2007-9
86.
Zurück zum Zitat Nowakowski T, Werbińska-Wojciechowska S (2012) Means of transport maintenance processes performance: decision support system. In: Proceedings of carpathian logistics congress CLC’ 2012, Jesenik, Czech Republic, Tanger, Ostrava, 7–9 Nov 2012, pp 1–6 Nowakowski T, Werbińska-Wojciechowska S (2012) Means of transport maintenance processes performance: decision support system. In: Proceedings of carpathian logistics congress CLC’ 2012, Jesenik, Czech Republic, Tanger, Ostrava, 7–9 Nov 2012, pp 1–6
87.
Zurück zum Zitat Nowakowski T, Werbińska-Wojciechowska S (2011) Developments of time dependencies modelling concept. In: Berenguer T, Grall A, Guedes-Soares A (eds) Advances in safety, reliability and risk management—proceedings of European safety and reliability conference ESREL 2011, Taylor and Francis Group, LondonCrossRef Nowakowski T, Werbińska-Wojciechowska S (2011) Developments of time dependencies modelling concept. In: Berenguer T, Grall A, Guedes-Soares A (eds) Advances in safety, reliability and risk management—proceedings of European safety and reliability conference ESREL 2011, Taylor and Francis Group, LondonCrossRef
88.
Zurück zum Zitat Okumura S (1997) An inspection policy for deteriorating processes using delay-time concept. Int Trans Oper Res 4(5–6):365–375MATHCrossRef Okumura S (1997) An inspection policy for deteriorating processes using delay-time concept. Int Trans Oper Res 4(5–6):365–375MATHCrossRef
89.
Zurück zum Zitat Okumura S, Jardine AKS, Yamashina H (1996) An inspection policy for a deteriorating single-unit system characterized by a delay-time model. Int J Prod Res 34(9):2441–2460MATHCrossRef Okumura S, Jardine AKS, Yamashina H (1996) An inspection policy for a deteriorating single-unit system characterized by a delay-time model. Int J Prod Res 34(9):2441–2460MATHCrossRef
91.
Zurück zum Zitat Pierskalla WP, Voelker JA (1976) A survey of maintenance models: the control and surveillance of deteriorating systems. Naval Res Logist Q 23:353–388MathSciNetMATHCrossRef Pierskalla WP, Voelker JA (1976) A survey of maintenance models: the control and surveillance of deteriorating systems. Naval Res Logist Q 23:353–388MathSciNetMATHCrossRef
92.
Zurück zum Zitat Pillay A, Wang J, Wall AD (2001) A maintenance study of fishing vessel equipment using delay-time analysis. J Qual Maint Eng 7(2):118–127CrossRef Pillay A, Wang J, Wall AD (2001) A maintenance study of fishing vessel equipment using delay-time analysis. J Qual Maint Eng 7(2):118–127CrossRef
93.
Zurück zum Zitat Redmond DF (1997) Delay time analysis in maintenance. Ph.D. thesis, University of Salford, Salford Redmond DF (1997) Delay time analysis in maintenance. Ph.D. thesis, University of Salford, Salford
94.
Zurück zum Zitat Scarf PA (1997) On the application of mathematical models in maintenance. Eur J Oper Res 99:493–506MATHCrossRef Scarf PA (1997) On the application of mathematical models in maintenance. Eur J Oper Res 99:493–506MATHCrossRef
98.
Zurück zum Zitat Scarf PA, Majid HA (2010) Modelling warranty extensions: a case study in the automotive industry. Salford business school working paper series, paper no. 339/10 Scarf PA, Majid HA (2010) Modelling warranty extensions: a case study in the automotive industry. Salford business school working paper series, paper no. 339/10
99.
Zurück zum Zitat Senegupta B (1980) Inspection procedures when failure symptoms are delayed. Oper Res 28(3/2):768–776MATHCrossRef Senegupta B (1980) Inspection procedures when failure symptoms are delayed. Oper Res 28(3/2):768–776MATHCrossRef
100.
Zurück zum Zitat Tang T (2012) Failure finding interval optimization for periodically inspected repairable systems. Ph.D. thesis, University of Toronto Tang T (2012) Failure finding interval optimization for periodically inspected repairable systems. Ph.D. thesis, University of Toronto
101.
Zurück zum Zitat Tang Y, Jing JJ, Yang Y, Xie C (2015) Parameter estimation of a delay time model of wearing parts based on objective data. Math Probl Eng, Article ID 419280:1–8 Tang Y, Jing JJ, Yang Y, Xie C (2015) Parameter estimation of a delay time model of wearing parts based on objective data. Math Probl Eng, Article ID 419280:1–8
102.
Zurück zum Zitat Thomas LC, Gaver DP, Jacobs PA (1991) Inspection models and their application. IMA J Math Appl Bus Ind 3:283–303 Thomas LC, Gaver DP, Jacobs PA (1991) Inspection models and their application. IMA J Math Appl Bus Ind 3:283–303
103.
Zurück zum Zitat Valdez-Flores C, Feldman R (1989) A survey of preventive maintenance models for stochastically deteriorating single-unit systems. Naval Res Logist 36:419–446MathSciNetMATHCrossRef Valdez-Flores C, Feldman R (1989) A survey of preventive maintenance models for stochastically deteriorating single-unit systems. Naval Res Logist 36:419–446MathSciNetMATHCrossRef
112.
Zurück zum Zitat Wang W (2010) Modeling planned maintenance with non-homogeneous defect arrivals and variable probability of defect identification. Eksploatacja i Niezawodnosc- Maint Reliab 2:73–78 Wang W (2010) Modeling planned maintenance with non-homogeneous defect arrivals and variable probability of defect identification. Eksploatacja i Niezawodnosc- Maint Reliab 2:73–78
114.
Zurück zum Zitat Wang W (2009) Delay time modelling for optimized inspection intervals of production plant. In: Ben-Daya M, Duffuaa SO, Raouf A, Knezevic J, Ait-Kadi D (eds) Handbook of maintenance management and engineering, Springer Wang W (2009) Delay time modelling for optimized inspection intervals of production plant. In: Ben-Daya M, Duffuaa SO, Raouf A, Knezevic J, Ait-Kadi D (eds) Handbook of maintenance management and engineering, Springer
116.
Zurück zum Zitat Wang W (2008) Delay time modelling. In: Kobbacy AH, Prabhakar Murthy DN (eds) Complex system maintenance handbook. Springer, London Wang W (2008) Delay time modelling. In: Kobbacy AH, Prabhakar Murthy DN (eds) Complex system maintenance handbook. Springer, London
120.
Zurück zum Zitat Wang W (1992) Modelling condition monitoring inspection using the delay-time concept. Ph.D. thesis, Salford, University of Salford, Salford Wang W (1992) Modelling condition monitoring inspection using the delay-time concept. Ph.D. thesis, Salford, University of Salford, Salford
123.
Zurück zum Zitat Wang W, Carr J, Chow TWS (2012) A two-level inspection model with technological insertions. IEEE Trans Reliab 61(2):479–490CrossRef Wang W, Carr J, Chow TWS (2012) A two-level inspection model with technological insertions. IEEE Trans Reliab 61(2):479–490CrossRef
126.
Zurück zum Zitat Wang W, Liu X, Peng R, Guo L (2013) A delay-time-based inspection model for a two-component parallel system. In: Proceedings of 2013 international conference on quality, reliability, risk, maintenance, and safety engineering (QR2MSE), Chengdu, China, 15–18 July 2013 Wang W, Liu X, Peng R, Guo L (2013) A delay-time-based inspection model for a two-component parallel system. In: Proceedings of 2013 international conference on quality, reliability, risk, maintenance, and safety engineering (QR2MSE), Chengdu, China, 15–18 July 2013
129.
Zurück zum Zitat Wen-Yuan LV, Wang W (2006) Modelling preventive maintenance of production plant given estimated PM data and actual failure times. In: Proceedings of international conference on management science and engineering, 2006 ICMSE ‘06, IEEE, pp 387–390. https://doi.org/10.1109/icmse.2006.313857 Wen-Yuan LV, Wang W (2006) Modelling preventive maintenance of production plant given estimated PM data and actual failure times. In: Proceedings of international conference on management science and engineering, 2006 ICMSE ‘06, IEEE, pp 387–390. https://​doi.​org/​10.​1109/​icmse.​2006.​313857
130.
Zurück zum Zitat Werbinska-Wojciechowska S, Zajac P (2015) Use of delay-time concept in modelling process of technical and logistics systems maintenance performance. Case study. Eksploatacja i Niezawodnosc Maint Reliab 17(2):174–185CrossRef Werbinska-Wojciechowska S, Zajac P (2015) Use of delay-time concept in modelling process of technical and logistics systems maintenance performance. Case study. Eksploatacja i Niezawodnosc Maint Reliab 17(2):174–185CrossRef
131.
Zurück zum Zitat Werbinska-Wojciechowska S (2013) Time resource problem in logistics systems dependability modelling. Eksploatacja i Niezawodnosc Maint Reliab 15(4):427–433 Werbinska-Wojciechowska S (2013) Time resource problem in logistics systems dependability modelling. Eksploatacja i Niezawodnosc Maint Reliab 15(4):427–433
132.
Zurück zum Zitat Williams GB, Hirani RS (1997) A delay time multi-level on-condition preventive maintenance inspection model based on constant base interval risk—when inspection detects pending failure. Int J Mach Tools Manuf 37(6):823–836CrossRef Williams GB, Hirani RS (1997) A delay time multi-level on-condition preventive maintenance inspection model based on constant base interval risk—when inspection detects pending failure. Int J Mach Tools Manuf 37(6):823–836CrossRef
133.
Zurück zum Zitat Yamashina H, Otani S (2001) Cost-optimized maintenance of the elevator—single unit case. J Qual Maint Eng 7(1):49–70CrossRef Yamashina H, Otani S (2001) Cost-optimized maintenance of the elevator—single unit case. J Qual Maint Eng 7(1):49–70CrossRef
136.
Zurück zum Zitat Yang R, Zhao F, Kang J, Zhang X (2014) An inspection optimization model based on a three-stage failure process. Int J Perform Eng 10(7):775–779 Yang R, Zhao F, Kang J, Zhang X (2014) An inspection optimization model based on a three-stage failure process. Int J Perform Eng 10(7):775–779
137.
Zurück zum Zitat Zhang X, Chen M, Zhou D (2012) Inspection models considering the overlapping of inspection span and failure downtime. Chin J Chem Eng 20(6):1167–1173CrossRef Zhang X, Chen M, Zhou D (2012) Inspection models considering the overlapping of inspection span and failure downtime. Chin J Chem Eng 20(6):1167–1173CrossRef
Metadaten
Titel
Delay-Time Maintenance Models for Technical Systems
verfasst von
Sylwia Werbińska-Wojciechowska
Copyright-Jahr
2019
DOI
https://doi.org/10.1007/978-3-030-10788-8_4

Neuer Inhalt