Abstract

As the core of advanced digital management application technology, BIM is widely used in various infrastructure construction. Prefabricated assembly substation uses advanced, reliable and environmentally friendly intelligent modular units to form an intensive closed substation. It takes digitization, networking and standardization of information as its basic requirements. Compared with conventional substation, it occupies less space, has shorter construction period, lower cost, no noise and no detection. Radiation-free and maintenance-free environment-friendly intelligent substation. A real digital information model of the whole substation depth is established by combining the Internet, big data, IoT and the construction process. Decomposition is performed in accordance with construction management and control steps to achieve model construction growth, according to Gantt chart schedule. The corresponding mechanism between the 2D code scan and the model is established, and the relationship between the digital model and the real nodes in the construction process is implemented. The life cycle of power transmission and transformation projects is facilitated by establishing appropriate management and control platform and developing the functional modules of the app. The Building Information Modeling technology is used to accurately calculate project quantities, strengthen the management and control of material cost information, provide efficient engineering quantities calculation and reduce cost. Based on the prefabricated assembly substation of 110 kV Longhua Center, this paper gives the corresponding case introduction and promotion suggestions from the aspects of prefabricated component production, assembly construction, information management technology and so on, aiming at applying it to the construction management stage of the substation industrialization project.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Wang, Z., Zhou, Y., Zhang, Q., et al. (2012). Integrated BIM software for substation steel truss structures. Special Structures, 4, 7–13. Wang, Z., Zhou, Y., Zhang, Q., et al. (2012). Integrated BIM software for substation steel truss structures. Special Structures, 4, 7–13.
2.
Zurück zum Zitat Lindblad, H., & Vass, S. (2015). BIM implementation and organisational change: A case study of a large Swedish public client. Procedia Economics & Finance, 21, 178–184.CrossRef Lindblad, H., & Vass, S. (2015). BIM implementation and organisational change: A case study of a large Swedish public client. Procedia Economics & Finance, 21, 178–184.CrossRef
3.
Zurück zum Zitat Gokuc, Y. T., & Arditi, D. (2017). Adoption of BIM in architectural design firms. Architectural Science Review, 2, 483–492.CrossRef Gokuc, Y. T., & Arditi, D. (2017). Adoption of BIM in architectural design firms. Architectural Science Review, 2, 483–492.CrossRef
4.
Zurück zum Zitat Chevron, M.-P. (2014). A metacognitive tool: Theoretical and operational analysis of skills exercised in structured concept maps. Perspectives in Science. Chevron, M.-P. (2014). A metacognitive tool: Theoretical and operational analysis of skills exercised in structured concept maps. Perspectives in Science.
5.
Zurück zum Zitat Nahmens, I., Ikuma, L.H. (2012). Effects of lean construction on sustainability of modular building. Journal of Architectural Engineering, 18(4), 155–163. Nahmens, I., Ikuma, L.H. (2012). Effects of lean construction on sustainability of modular building. Journal of Architectural Engineering, 18(4), 155–163.
6.
Zurück zum Zitat Niu, Y., Lu, W., Chen, K., Huang, G. G., & Anumba, C. (2016). Smart construction objects. Journal of Computing in Civil Engineering, 30(4), 04015070.CrossRef Niu, Y., Lu, W., Chen, K., Huang, G. G., & Anumba, C. (2016). Smart construction objects. Journal of Computing in Civil Engineering, 30(4), 04015070.CrossRef
7.
Zurück zum Zitat Niu, Y., Lu, W., Liu, D., & Chen, K. (2016b). SCO-enabled process reengineering of construction logistics and supply chain management. Paper read at the 16th International Conference on Computing in Civil and Building Engineering. Niu, Y., Lu, W., Liu, D., & Chen, K. (2016b). SCO-enabled process reengineering of construction logistics and supply chain management. Paper read at the 16th International Conference on Computing in Civil and Building Engineering.
8.
Zurück zum Zitat Pang, L. Y., Zhong, R. Y., Fang, J., & Huang, G. Q. (2015). Data-source interoperability service for heterogeneous information integration in ubiquitous enterprises. Advanced Engineering Informatics, 29(3), 549–561.CrossRef Pang, L. Y., Zhong, R. Y., Fang, J., & Huang, G. Q. (2015). Data-source interoperability service for heterogeneous information integration in ubiquitous enterprises. Advanced Engineering Informatics, 29(3), 549–561.CrossRef
9.
Zurück zum Zitat Reyes, P. M., Li, S., & Visich, J. K. (2016). Determinants of RFID adoption stage and perceived benefits. European Journal of Operational Research, 254(3), 801–812.CrossRef Reyes, P. M., Li, S., & Visich, J. K. (2016). Determinants of RFID adoption stage and perceived benefits. European Journal of Operational Research, 254(3), 801–812.CrossRef
10.
Zurück zum Zitat Tam, V. W. Y., Fung, I. W. H., Sing, M. C. P., & Ogunlana, S. O. (2015). Best practice of prefabrication implementation in the Hong Kong public and private sectors. Journal of Cleaner Production, 109, 216–231.CrossRef Tam, V. W. Y., Fung, I. W. H., Sing, M. C. P., & Ogunlana, S. O. (2015). Best practice of prefabrication implementation in the Hong Kong public and private sectors. Journal of Cleaner Production, 109, 216–231.CrossRef
11.
Zurück zum Zitat Hong, J., Shen, G. Q., Mao, C., Li, Z., & Li, K. (2016). Life-cycle energy analysis of prefabricated building components: An input–output-based hybrid model. Journal of Cleaner Production, 112, 2198–2207.CrossRef Hong, J., Shen, G. Q., Mao, C., Li, Z., & Li, K. (2016). Life-cycle energy analysis of prefabricated building components: An input–output-based hybrid model. Journal of Cleaner Production, 112, 2198–2207.CrossRef
12.
Zurück zum Zitat Li, C. Z., Hong, J., Xue, F., Shen, G. Q., Xu, X., & Luo, L. (2016). SWOT analysis and Internet of Things-enabled platform for prefabrication housing production in Hong Kong. Habitat International, 57, 74–87.CrossRef Li, C. Z., Hong, J., Xue, F., Shen, G. Q., Xu, X., & Luo, L. (2016). SWOT analysis and Internet of Things-enabled platform for prefabrication housing production in Hong Kong. Habitat International, 57, 74–87.CrossRef
13.
Zurück zum Zitat Wang, Z., Wang, G., & Tong, J. (2016). Key management method for smart substations. Automation of Electric Power System, 40(13), 121–127 Wang, Z., Wang, G., & Tong, J. (2016). Key management method for smart substations. Automation of Electric Power System, 40(13), 121–127
14.
Zurück zum Zitat Xiang, G. (2008). Digital substation application technology (p. 1). China Electric Power Press, Beijing. Xiang, G. (2008). Digital substation application technology (p. 1). China Electric Power Press, Beijing.
15.
Zurück zum Zitat Du, Z., Gu, C, Wang Z., et al. (2016). BIM technology in Guodian Xingyang 2×660MW ultra-low emissions transform, the application of Standard unit. China Standardization, 15, 205–206. Du, Z., Gu, C, Wang Z., et al. (2016). BIM technology in Guodian Xingyang 2×660MW ultra-low emissions transform, the application of Standard unit. China Standardization, 15, 205–206.
16.
Zurück zum Zitat Liu, Z., Han, Z., Zhang, Y., et al. (2017). Numerical simulation of prefabricated wind power tower based on BIM technology. Architecture Technology, 48(11), 1131–1134. Liu, Z., Han, Z., Zhang, Y., et al. (2017). Numerical simulation of prefabricated wind power tower based on BIM technology. Architecture Technology, 48(11), 1131–1134.
17.
Zurück zum Zitat Li. (2017). China’s manufacturing locus in 2025: With a comparison of “Made-in-China 2025” and “Industry 4.0”. Technological Forecasting and Social Change. Li. (2017). China’s manufacturing locus in 2025: With a comparison of “Made-in-China 2025” and “Industry 4.0”. Technological Forecasting and Social Change.
18.
Zurück zum Zitat Li, G.Q. Shen, X. Xue, Critical review of the research on the management of prefabricated construction, Habitat Int. 43 (2014) 240–249. Li, G.Q. Shen, X. Xue, Critical review of the research on the management of prefabricated construction, Habitat Int. 43 (2014) 240–249.
19.
Zurück zum Zitat Zhong, Y., Peng, Y., Xue, F., Fang, J., Zou, W., Luo, H., et al. (2017). Prefabricated construction enabled by the Internet-of-Things. Automation in Construction, 76, 59–70.CrossRef Zhong, Y., Peng, Y., Xue, F., Fang, J., Zou, W., Luo, H., et al. (2017). Prefabricated construction enabled by the Internet-of-Things. Automation in Construction, 76, 59–70.CrossRef
20.
Zurück zum Zitat Deng, J. C. P., & Cheng, C. (2016). Anumba, mapping between BIM and 3D GIS in different levels of detail using schema mediation and instance comparison. Automation in Construction, 67, 1–21.CrossRef Deng, J. C. P., & Cheng, C. (2016). Anumba, mapping between BIM and 3D GIS in different levels of detail using schema mediation and instance comparison. Automation in Construction, 67, 1–21.CrossRef
21.
Zurück zum Zitat Xu, G., Li, M., Luo, L., Chen, C.-H., Huang, G.Q. (2018). Cloud-based fleet management for prefabrication transportation. Enterprise Information System, 1–20. Xu, G., Li, M., Luo, L., Chen, C.-H., Huang, G.Q. (2018). Cloud-based fleet management for prefabrication transportation. Enterprise Information System, 1–20.
22.
Zurück zum Zitat Zhai, P. M., Goodrum, C. T., & Haas, C. H. (2009). Caldas, relationship between automation and integration of construction information systems and labor productivity. Journal of Construction Engineering & Management, 135(8), 746–753.CrossRef Zhai, P. M., Goodrum, C. T., & Haas, C. H. (2009). Caldas, relationship between automation and integration of construction information systems and labor productivity. Journal of Construction Engineering & Management, 135(8), 746–753.CrossRef
23.
Zurück zum Zitat Perumal, A. R., Ramli, C. Y., Leong, K., & Samsudin, S. (2010). Mansor, Middleware for heterogeneous subsystems interoperability in intelligent buildings. Automation in Construction, 19(2), 160–168.CrossRef Perumal, A. R., Ramli, C. Y., Leong, K., & Samsudin, S. (2010). Mansor, Middleware for heterogeneous subsystems interoperability in intelligent buildings. Automation in Construction, 19(2), 160–168.CrossRef
24.
Zurück zum Zitat Xu, J. Wang, G.Q. Huang, C.H. Chen, Data-driven resilient fleet management for cloud asset-enabled urban flood control. IEEE Transactions on Intelligent Transportation Systems. Xu, J. Wang, G.Q. Huang, C.H. Chen, Data-driven resilient fleet management for cloud asset-enabled urban flood control. IEEE Transactions on Intelligent Transportation Systems.
25.
Zurück zum Zitat Xu, B., Xu, L. D., Cai, H., Xie, C., Hu, J., & Bu, F. (2014). Ubiquitous data accessing method in IoT-based information system for emergency medical services. IEEE Transactions on Industrial Electronics, 10(2), 1578–1586.CrossRef Xu, B., Xu, L. D., Cai, H., Xie, C., Hu, J., & Bu, F. (2014). Ubiquitous data accessing method in IoT-based information system for emergency medical services. IEEE Transactions on Industrial Electronics, 10(2), 1578–1586.CrossRef
Metadaten
Titel
Design and Application of Prefabricated Substation Based on BIM Technology
verfasst von
Clyde Zhengdao Li
Zhe Chen
Yiyu Zhao
Meizhuan Zhou
Limei Zhang
Copyright-Jahr
2021
Verlag
Springer Singapore
DOI
https://doi.org/10.1007/978-981-15-8892-1_132

Premium Partner