Skip to main content
Erschienen in: Production Engineering 2-3/2010

01.05.2010 | Production Management

Earliness-tardiness-lost sales dynamic job-shop scheduling

verfasst von: S. M. T. Fatemi Ghomi, Mehdi Iranpoor

Erschienen in: Production Engineering | Ausgabe 2-3/2010

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

In the real world production environment, the decision about the acceptance or rejection of new orders is made by both the sale department and the production department, cooperatively. However, as far as we searched, no published paper has considered this fact so far. Job-shop scheduling is one of the most complex problems in scheduling. In job-shop environment, there are some production stations, and every job (order; In this paper job and order are used in the same meaning) has a specific production sequence which is not necessarily the same as the other jobs’ sequences. This paper studies the earliness-tardiness-lost sales dynamic job-shop scheduling problem. In this problem, whenever some new orders arrive, a decision is made about the acceptance or the rejection of each of these orders. In this way, all of the alternatives, including the acceptance or rejection of each new order, should be compared. If at least one new order is accepted, the new schedule which includes the accepted order(s) will be generated. By defining some variables, this comparison is done by the developed models. Because of NP-hardness of this problem, exact methods can not be used to solve it in large or medium scales. So, in this paper a hybrid metaheuristic algorithm is developed, which is composed of a genetic algorithm to determine the sequence of the operations and a simulated annealing algorithm to achieve a near-optimal schedule based on this sequence. Finally, the efficiency and effectiveness of the algorithm is evaluated using some numerical results.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Su L-H, Chang P-C (1998) A heuristic for scheduling general job shops to minimize maximum lateness. Math Comput Model 27(1):1–15CrossRefMathSciNet Su L-H, Chang P-C (1998) A heuristic for scheduling general job shops to minimize maximum lateness. Math Comput Model 27(1):1–15CrossRefMathSciNet
2.
Zurück zum Zitat Baker RK (1974) Introduction to sequencing and scheduling. John Wiley, New York Baker RK (1974) Introduction to sequencing and scheduling. John Wiley, New York
4.
Zurück zum Zitat Dileep RS (1997) Industrial scheduling. PWS Publishing Company, BostonMATH Dileep RS (1997) Industrial scheduling. PWS Publishing Company, BostonMATH
5.
6.
Zurück zum Zitat Van Laarhooven PJM, Aarts EHL, Lenstra JK (1992) Job shop scheduling by simulated annealing. Oper Res 40(1):113–125CrossRefMathSciNet Van Laarhooven PJM, Aarts EHL, Lenstra JK (1992) Job shop scheduling by simulated annealing. Oper Res 40(1):113–125CrossRefMathSciNet
7.
Zurück zum Zitat He Z, Yang T, Tiger A (1996) An exchange heuristic embedded with simulated annealing for due-dates job-shop scheduling. Eur J Oper Res 91:99–117MATHCrossRef He Z, Yang T, Tiger A (1996) An exchange heuristic embedded with simulated annealing for due-dates job-shop scheduling. Eur J Oper Res 91:99–117MATHCrossRef
8.
Zurück zum Zitat Emin Aydin, Terence M, Fogarty C (2004) A simulated annealing algorithm for multi-agent systems: a job-shop scheduling application. J Intell Manuf 15:805–814CrossRef Emin Aydin, Terence M, Fogarty C (2004) A simulated annealing algorithm for multi-agent systems: a job-shop scheduling application. J Intell Manuf 15:805–814CrossRef
9.
Zurück zum Zitat El-Bouri A, Azizi N, Zolfaghari S (2007) A comparative study of a new heuristic based on adaptive memory and simulated annealing: The case of job shop scheduling. Eur J Oper Res 177(3):1894–1910MATHCrossRef El-Bouri A, Azizi N, Zolfaghari S (2007) A comparative study of a new heuristic based on adaptive memory and simulated annealing: The case of job shop scheduling. Eur J Oper Res 177(3):1894–1910MATHCrossRef
10.
Zurück zum Zitat Nakano R, Yamada T (1991). In: Kenneth MK, BookerLB (ed) Proceedings of International Conference on Genetic Algorithms. San Diego: ICGA, pp 474–479 Nakano R, Yamada T (1991). In: Kenneth MK, BookerLB (ed) Proceedings of International Conference on Genetic Algorithms. San Diego: ICGA, pp 474–479
11.
Zurück zum Zitat Yamada T, Nakano R (1997) Job-shop scheduling. In: Zalzala AMS and Fleming PJ (ed) Genetic algorithms in engineering systems (control engineering series 55). IEE, London, pp 134–160 Yamada T, Nakano R (1997) Job-shop scheduling. In: Zalzala AMS and Fleming PJ (ed) Genetic algorithms in engineering systems (control engineering series 55). IEE, London, pp 134–160
12.
Zurück zum Zitat Norman BA, Bean J (1997) Random keys genetic algorithm for job-shop scheduling. Eng Des Autom 3:145–156 Norman BA, Bean J (1997) Random keys genetic algorithm for job-shop scheduling. Eng Des Autom 3:145–156
13.
Zurück zum Zitat Wang L, Zheng DZ (2001) An effective hybrid optimization strategy for job-shop scheduling problems. Comput Oper Res 28:585–596MATHCrossRefMathSciNet Wang L, Zheng DZ (2001) An effective hybrid optimization strategy for job-shop scheduling problems. Comput Oper Res 28:585–596MATHCrossRefMathSciNet
14.
Zurück zum Zitat Holloway CA, Nelson RT (1974) Job shop scheduling with due dates and variable processing times. Manage Sci 20(9):1264–1275MATHCrossRef Holloway CA, Nelson RT (1974) Job shop scheduling with due dates and variable processing times. Manage Sci 20(9):1264–1275MATHCrossRef
15.
Zurück zum Zitat Liu SQ, Ong HL, Ng KM (2005) Metaheuristics for minimizing the makespan of the dynamic shop scheduling problem. Adv Eng Softw 36:199–205MATHCrossRef Liu SQ, Ong HL, Ng KM (2005) Metaheuristics for minimizing the makespan of the dynamic shop scheduling problem. Adv Eng Softw 36:199–205MATHCrossRef
16.
Zurück zum Zitat Thiagarajan S, Rajendran C (2005) Scheduling in dynamic assembly job-shop to minimize the sum of weighted earliness, weighted tardiness and weighted flow time of jobs. Comput Ind Eng 49:463–503CrossRef Thiagarajan S, Rajendran C (2005) Scheduling in dynamic assembly job-shop to minimize the sum of weighted earliness, weighted tardiness and weighted flow time of jobs. Comput Ind Eng 49:463–503CrossRef
Metadaten
Titel
Earliness-tardiness-lost sales dynamic job-shop scheduling
verfasst von
S. M. T. Fatemi Ghomi
Mehdi Iranpoor
Publikationsdatum
01.05.2010
Verlag
Springer-Verlag
Erschienen in
Production Engineering / Ausgabe 2-3/2010
Print ISSN: 0944-6524
Elektronische ISSN: 1863-7353
DOI
https://doi.org/10.1007/s11740-010-0211-z

Weitere Artikel der Ausgabe 2-3/2010

Production Engineering 2-3/2010 Zur Ausgabe

    Marktübersichten

    Die im Laufe eines Jahres in der „adhäsion“ veröffentlichten Marktübersichten helfen Anwendern verschiedenster Branchen, sich einen gezielten Überblick über Lieferantenangebote zu verschaffen.