1 Introduction
2 Determining wind power potential
NUTS-2 | Fed. State | Area [km2] | Potential [MW] |
---|---|---|---|
AT11 | Burgenland | 2062 | 1031 |
AT12 | Lower Austria | 10667 | 5333 |
AT13 | Vienna | 15 | 7 |
AT21 | Carinthia | 5449 | 2725 |
AT22 | Styria | 7122 | 3561 |
AT31 | Upper Austria | 8872 | 4436 |
AT32 | Salzburg | 3150 | 1575 |
AT33 | Tyrol | 3409 | 1704 |
AT34 | Vorarlberg | 856 | 428 |
AT | Austria | 41602 | 20801 |
3 Utilizing optimization for annual wind power expansion
4 Validation
5 Case study: 10 TWh top-down scenario
NUTS-3 | Cap. [MW] | NUTS-3 | Cap. [MW] |
---|---|---|---|
AT121 | 677,5 | AT224 | 119,0 |
AT122 | 402,7 | AT212 | 112,4 |
AT314 | 369,9 | AT127 | 111,0 |
AT223 | 313,9 | AT213 | 75,0 |
AT124 | 301,3 | AT226 | 75,0 |
AT111 | 197,3 | AT323 | 75,0 |
AT311 | 183,5 | AT222 | 66,5 |
AT312 | 180,6 | AT126 | 57,9 |
AT123 | 177,5 | AT225 | 37,1 |
AT112 | 159,1 | AT130 | 35,7 |
AT125 | 132,0 | AT322 | 10,8 |
AT221 | 129,2 |