Skip to main content
Erschienen in: Production Engineering 4/2008

01.12.2008 | Production Management

Valuation of changeable production systems

verfasst von: J. Milberg, N. Möller

Erschienen in: Production Engineering | Ausgabe 4/2008

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

The introduction of changeable production systems increases the adaptability of factories in an uncertain environment. This paper analyzes the valuation of the economic efficiency of such systems using the real options theory. The developed approach proposes a structured valuation process for selecting options related to production engineering and factory planning. Based on a classification of possible modifications of a production system, options profiles are derived. Considering the existing uncertainty of a company’s environment these profiles may be utilized to identify real options which ought to be included when valuating a technical production system design.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Kinkel S (2005) Anforderungen an die Fertigungstechnik von morgen. PI-Mitteilung No. 37, Fraunhofer Institute for Systems and Innovation Research, Karlsruhe Kinkel S (2005) Anforderungen an die Fertigungstechnik von morgen. PI-Mitteilung No. 37, Fraunhofer Institute for Systems and Innovation Research, Karlsruhe
2.
Zurück zum Zitat Nottbeck B (2004) Fabrik der Zukunft—Eine Herausforderung für den Standort Deutschland. In: Lindemann U (ed) Marktnahe Produktion individualisierter Produkte. Utz, Munich Nottbeck B (2004) Fabrik der Zukunft—Eine Herausforderung für den Standort Deutschland. In: Lindemann U (ed) Marktnahe Produktion individualisierter Produkte. Utz, Munich
3.
Zurück zum Zitat Dove R (2001) Agile production: design principles for highly adaptable systems. In: Zandin KB (ed) Maynard’s industrial engineering handbook, 5th edn. McGraw-Hill, New York Dove R (2001) Agile production: design principles for highly adaptable systems. In: Zandin KB (ed) Maynard’s industrial engineering handbook, 5th edn. McGraw-Hill, New York
4.
Zurück zum Zitat Nyhuis P, Heinen T, Reinhart G et al (2008) Wandlungsfähige Produktionssysteme. wt Werkstattstechnik 98(1–2):85–91 Nyhuis P, Heinen T, Reinhart G et al (2008) Wandlungsfähige Produktionssysteme. wt Werkstattstechnik 98(1–2):85–91
5.
Zurück zum Zitat Zaeh MF, Mueller N, Rimpau C (2005) A holistic framework for enhancing the changeability of production systems. In: Zaeh MF et al (eds) CARV 2005. Utz, Munich Zaeh MF, Mueller N, Rimpau C (2005) A holistic framework for enhancing the changeability of production systems. In: Zaeh MF et al (eds) CARV 2005. Utz, Munich
6.
Zurück zum Zitat Zaeh MF, Moeller N, Vogl W (2005) Symbiosis of changeable and virtual production. In: Zaeh MF et al (eds) CARV 2005. Utz, Munich Zaeh MF, Moeller N, Vogl W (2005) Symbiosis of changeable and virtual production. In: Zaeh MF et al (eds) CARV 2005. Utz, Munich
7.
Zurück zum Zitat Wiendahl H-P, Heger CL (2003) Justifying changeability—a methodical approach to achieving cost effectiveness. CIRP 2nd International Conference on Reconfigurable Manufacturing, Ann Arbor, MI, USA, August 2003 Wiendahl H-P, Heger CL (2003) Justifying changeability—a methodical approach to achieving cost effectiveness. CIRP 2nd International Conference on Reconfigurable Manufacturing, Ann Arbor, MI, USA, August 2003
8.
Zurück zum Zitat ElMaraghy HA (2006) Flexible and reconfigurable manufacturing systems paradigms. Int J Flexible Manuf Syst 17(4):261–276MATHCrossRef ElMaraghy HA (2006) Flexible and reconfigurable manufacturing systems paradigms. Int J Flexible Manuf Syst 17(4):261–276MATHCrossRef
9.
Zurück zum Zitat Zaeh MF, Moeller N, Sudhoff W (2005) A framework for the valuation of changeable manufacturing systems. CIRP 3rd International Conference on Reconfigurable Manufacturing Systems, Ann Arbor, MI, USA, May 2005 Zaeh MF, Moeller N, Sudhoff W (2005) A framework for the valuation of changeable manufacturing systems. CIRP 3rd International Conference on Reconfigurable Manufacturing Systems, Ann Arbor, MI, USA, May 2005
10.
Zurück zum Zitat Wiendahl H-P, ElMaraghy HA, Zäh MF et al (2007) Changeable manufacturing: classification, design, operation. Ann CIRP 56(2):783–809CrossRef Wiendahl H-P, ElMaraghy HA, Zäh MF et al (2007) Changeable manufacturing: classification, design, operation. Ann CIRP 56(2):783–809CrossRef
11.
Zurück zum Zitat (1998) Visionary manufacturing challenges for 2020. National Academy Press, Washington DC (1998) Visionary manufacturing challenges for 2020. National Academy Press, Washington DC
12.
Zurück zum Zitat Dreher C (ed) (2005) Manufacturing visions policy summary and recommendations. ManVis Report No. 6, Fraunhofer Institute for System and Innovation Research, Karlsruhe Dreher C (ed) (2005) Manufacturing visions policy summary and recommendations. ManVis Report No. 6, Fraunhofer Institute for System and Innovation Research, Karlsruhe
13.
Zurück zum Zitat Schuh G, Wemhöner N, Friedrich C (2005) Lifecycle oriented evaluation of automotive body shop flexibility. In: Zaeh MF et al (eds) CARV 2005. Utz, Munich Schuh G, Wemhöner N, Friedrich C (2005) Lifecycle oriented evaluation of automotive body shop flexibility. In: Zaeh MF et al (eds) CARV 2005. Utz, Munich
14.
Zurück zum Zitat Shi D, Daniels RL (2003) A survey of manufacturing flexibility: Implications for e-business flexibility. IBM Syst J 42(3):414–427 Shi D, Daniels RL (2003) A survey of manufacturing flexibility: Implications for e-business flexibility. IBM Syst J 42(3):414–427
15.
Zurück zum Zitat Hill T, Chambers S (1991) Flexibility—a manufacturing conundrum. Int J Oper Prod Manag 11(2):5–13CrossRef Hill T, Chambers S (1991) Flexibility—a manufacturing conundrum. Int J Oper Prod Manag 11(2):5–13CrossRef
16.
Zurück zum Zitat Koren Y, Heisel U, Jovane F et al (1999) Reconfigurable manufacturing systems. Ann CIRP 48(2):527–540CrossRef Koren Y, Heisel U, Jovane F et al (1999) Reconfigurable manufacturing systems. Ann CIRP 48(2):527–540CrossRef
17.
Zurück zum Zitat Milberg J, Dürrschmidt S (2002) Planning methodology for changeable logistics systems. Prod Eng 9(1):63–68 Milberg J, Dürrschmidt S (2002) Planning methodology for changeable logistics systems. Prod Eng 9(1):63–68
18.
Zurück zum Zitat Nyhuis P, Kolakowski M, Heger CL (2006) Evaluation of factory transformability—a systematic approach. Prod Eng 13(1):147–152 Nyhuis P, Kolakowski M, Heger CL (2006) Evaluation of factory transformability—a systematic approach. Prod Eng 13(1):147–152
19.
Zurück zum Zitat Nofen D, Klussmann J, Loellmann F (2003) Transformability by modular facility structures. CIRP 2nd International Conference on Reconfigurable Manufacturing, CIRP, Ann Arbor, MI, August 2003 Nofen D, Klussmann J, Loellmann F (2003) Transformability by modular facility structures. CIRP 2nd International Conference on Reconfigurable Manufacturing, CIRP, Ann Arbor, MI, August 2003
20.
Zurück zum Zitat Schuh G, Harre J, Gottschalk S et al (2004) Design für Changeability (DFC). wt Werkstattstechnik 94(4):100–106 Schuh G, Harre J, Gottschalk S et al (2004) Design für Changeability (DFC). wt Werkstattstechnik 94(4):100–106
21.
Zurück zum Zitat SAE M–110.2 (2. Ed.) (1999) Reliability and maintainability guideline for manufacturing machinery and equipment, Society of Automotive Engineers, Warrendale SAE M–110.2 (2. Ed.) (1999) Reliability and maintainability guideline for manufacturing machinery and equipment, Society of Automotive Engineers, Warrendale
22.
Zurück zum Zitat AIR 1939 (1986) Aircraft engine life cycle costs. Society of Automotive Engineers, Warrendale AIR 1939 (1986) Aircraft engine life cycle costs. Society of Automotive Engineers, Warrendale
23.
Zurück zum Zitat IEC 60300-3-3 (2005) Dependability management—part 3-3: application guide—life cycle costing. Beuth, Berlin IEC 60300-3-3 (2005) Dependability management—part 3-3: application guide—life cycle costing. Beuth, Berlin
24.
Zurück zum Zitat VDI 2884 (2005) Purchase, operating and maintenance of production equipment using life cycle costing (LCC). Beuth, Berlin VDI 2884 (2005) Purchase, operating and maintenance of production equipment using life cycle costing (LCC). Beuth, Berlin
25.
Zurück zum Zitat Fabrycky WJ, Blanchard BS (1991) Life-cycle cost and economic analysis. Prentice Hall, Englewood Cliffs Fabrycky WJ, Blanchard BS (1991) Life-cycle cost and economic analysis. Prentice Hall, Englewood Cliffs
26.
Zurück zum Zitat Friese M, Bihlmaier R, Bürkner S (2005) Planning of flexible production networks in the automotive industry. In: Zaeh MF et al (eds) CARV 2005. Utz, Munich Friese M, Bihlmaier R, Bürkner S (2005) Planning of flexible production networks in the automotive industry. In: Zaeh MF et al (eds) CARV 2005. Utz, Munich
27.
Zurück zum Zitat Bürkner S, Roscher J, Schmitt M et al (2005) Methods for flexibility evaluation in the automotive industry. In: Zaeh MF et al (eds) CARV 2005. Utz, Munich Bürkner S, Roscher J, Schmitt M et al (2005) Methods for flexibility evaluation in the automotive industry. In: Zaeh MF et al (eds) CARV 2005. Utz, Munich
28.
Zurück zum Zitat Urbani A, Beccaris M (2005) Life cycle cost technique for investment evaluation: application to an automotive plant. CIRP 3rd International Conference on Reconfigurable Manufacturing, Ann Arbor, MI, May 2005 Urbani A, Beccaris M (2005) Life cycle cost technique for investment evaluation: application to an automotive plant. CIRP 3rd International Conference on Reconfigurable Manufacturing, Ann Arbor, MI, May 2005
29.
Zurück zum Zitat Trigeorgis L (1996) Real options–managerial flexibility and strategy in resource allocation. MIT Press, Cambridge Trigeorgis L (1996) Real options–managerial flexibility and strategy in resource allocation. MIT Press, Cambridge
30.
Zurück zum Zitat Copeland TE (2001) Antikarov V real options. Texere, New York Copeland TE (2001) Antikarov V real options. Texere, New York
31.
Zurück zum Zitat Baecker P, Hommel U (2004) 25 years real options approach to investment valuation: review and assessment. In: Dangl T et al (eds) Real options. Gabler, Wiesbaden Baecker P, Hommel U (2004) 25 years real options approach to investment valuation: review and assessment. In: Dangl T et al (eds) Real options. Gabler, Wiesbaden
32.
Zurück zum Zitat Abele E, Liebeck T, Wörn A (2006) Measuring flexibility in investment decisions for manufacturing systems. Ann CIRP 55(1):433–436CrossRef Abele E, Liebeck T, Wörn A (2006) Measuring flexibility in investment decisions for manufacturing systems. Ann CIRP 55(1):433–436CrossRef
33.
Zurück zum Zitat Amico M, Asl FM, Pasek Z et al (2006) Real options: an application to RMS investment evaluation. In: Dashchenko AI (ed) Reconfigurable manufacturing systems and transformable factories. Springer, Berlin Amico M, Asl FM, Pasek Z et al (2006) Real options: an application to RMS investment evaluation. In: Dashchenko AI (ed) Reconfigurable manufacturing systems and transformable factories. Springer, Berlin
34.
Zurück zum Zitat Benaroch M (2002) Managing information technology investment risk. J Manag Inf Syst 19(2):43–84 Benaroch M (2002) Managing information technology investment risk. J Manag Inf Syst 19(2):43–84
35.
Zurück zum Zitat Bräutigam J, Esche C, Mehler-Bicher A (2003) Uncertainty as a key value driver of real options. 7th Annual Real Options Conference, Washington DC, July 2003 Bräutigam J, Esche C, Mehler-Bicher A (2003) Uncertainty as a key value driver of real options. 7th Annual Real Options Conference, Washington DC, July 2003
36.
Zurück zum Zitat Adner R, Levinthal DA (2004) What is not a real option: considering boundaries for the application of real options to business strategy. Acad Manag Rev 1(29):74–85CrossRef Adner R, Levinthal DA (2004) What is not a real option: considering boundaries for the application of real options to business strategy. Acad Manag Rev 1(29):74–85CrossRef
37.
Zurück zum Zitat Heger CL (2007) Bewertung der Wandlungsfähigkeit von Fabrikobjekten, Diss. Universität Hannover (2006), PZH, Garbsen Heger CL (2007) Bewertung der Wandlungsfähigkeit von Fabrikobjekten, Diss. Universität Hannover (2006), PZH, Garbsen
38.
Zurück zum Zitat Triantis A, Borison A (2001) Real options: state of the practice. J Appl Corp Finance 14(2):8–24CrossRef Triantis A, Borison A (2001) Real options: state of the practice. J Appl Corp Finance 14(2):8–24CrossRef
39.
Zurück zum Zitat de Neufville R (2001) Real options: dealing with uncertainty in systems planning and design, 5. International Conference on Technology, policy and innovation, Delft, NL, June 2001 de Neufville R (2001) Real options: dealing with uncertainty in systems planning and design, 5. International Conference on Technology, policy and innovation, Delft, NL, June 2001
40.
Zurück zum Zitat Zaeh MF, Moeller N, Muessig B et al (2006) Life cycle oriented valuation of manufacturing flexibility, in Duflou JR et al (eds), 13th CIRP International Conference on Life Cycle Engineering, Katholieke Universiteit Leuven, Leuven, BE, 2006 Zaeh MF, Moeller N, Muessig B et al (2006) Life cycle oriented valuation of manufacturing flexibility, in Duflou JR et al (eds), 13th CIRP International Conference on Life Cycle Engineering, Katholieke Universiteit Leuven, Leuven, BE, 2006
41.
Zurück zum Zitat Courtney H (2001) 20/20 foresight: crafting strategy in an uncertain world. Harvard Business School Press, Boston Courtney H (2001) 20/20 foresight: crafting strategy in an uncertain world. Harvard Business School Press, Boston
42.
Zurück zum Zitat Möller N (2008) Bestimmung der Wirtschaftlichkeit wandlungsfähiger Produktionssysteme. Diss. Technische Universität München, Utz, Munich Möller N (2008) Bestimmung der Wirtschaftlichkeit wandlungsfähiger Produktionssysteme. Diss. Technische Universität München, Utz, Munich
43.
Zurück zum Zitat DIN EN 60812 (2006) Analysis techniques for system reliabilities—procedure for failure mode and effects analysis (FMEA), Beuth, Berlin DIN EN 60812 (2006) Analysis techniques for system reliabilities—procedure for failure mode and effects analysis (FMEA), Beuth, Berlin
Metadaten
Titel
Valuation of changeable production systems
verfasst von
J. Milberg
N. Möller
Publikationsdatum
01.12.2008
Verlag
Springer-Verlag
Erschienen in
Production Engineering / Ausgabe 4/2008
Print ISSN: 0944-6524
Elektronische ISSN: 1863-7353
DOI
https://doi.org/10.1007/s11740-008-0133-1

Weitere Artikel der Ausgabe 4/2008

Production Engineering 4/2008 Zur Ausgabe

Production Process

Categories of size effects

    Marktübersichten

    Die im Laufe eines Jahres in der „adhäsion“ veröffentlichten Marktübersichten helfen Anwendern verschiedenster Branchen, sich einen gezielten Überblick über Lieferantenangebote zu verschaffen.