Skip to main content

2015 | OriginalPaper | Buchkapitel

Implementing Lean in Engineer-to-Order Industry: A Case Study

verfasst von : Kristina Kjersem, Lise Lillebrygfjeld Halse, Peter Kiekebos, Jan Emblemsvåg

Erschienen in: Advances in Production Management Systems: Innovative Production Management Towards Sustainable Growth

Verlag: Springer International Publishing

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

There is generally agreed that lean pull production principles like Kanban, ConWIP or takt time are successful tools within repetitive production where with one-piece flow, where each job produces exactly what the next job needs, when it is needed and with no inventory in between the stations. To our knowledge, very little research is done on implementation of these concepts within Engineer-to-Order (ETO) environment. This paper presents a case study on implementing the three principles within a Norwegian company that builds complex and highly customized vessels for the offshore industry.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Little, D., Rollins, R., Peck, M., Porter, K.J.: Integrated planning and scheduling in the engineer-to-order sector. Int. J. Comput. Integr. Manuf. 13, 545–554 (2000)CrossRef Little, D., Rollins, R., Peck, M., Porter, K.J.: Integrated planning and scheduling in the engineer-to-order sector. Int. J. Comput. Integr. Manuf. 13, 545–554 (2000)CrossRef
2.
Zurück zum Zitat Ballard, G., Tommelein, I.D.: Lean management methods for complex projects. Eng. Proj. Organ. J. 2, 85–96 (2011)CrossRef Ballard, G., Tommelein, I.D.: Lean management methods for complex projects. Eng. Proj. Organ. J. 2, 85–96 (2011)CrossRef
3.
Zurück zum Zitat Powell, D.O.J., Strandhagen, J.O., Tommelein, I.D., Ballard, G.M., Rossi, M.: A new set of principles for pursuing the lean ideal in engineering-to-order manufacturers. In: CIRP Conference on Manufacturing Systems, Windsor, Ontario, Canada (2014) Powell, D.O.J., Strandhagen, J.O., Tommelein, I.D., Ballard, G.M., Rossi, M.: A new set of principles for pursuing the lean ideal in engineering-to-order manufacturers. In: CIRP Conference on Manufacturing Systems, Windsor, Ontario, Canada (2014)
4.
Zurück zum Zitat Emblemsvåg, J.: Lean project planning: using lean principles in project planning. Int. J. Constr. Proj. Manag. (2014) Emblemsvåg, J.: Lean project planning: using lean principles in project planning. Int. J. Constr. Proj. Manag. (2014)
5.
Zurück zum Zitat Elfving, J.A., Tommelein, I.D, Ballard, G.: Improving the delivery process for engineering-to-order products - lessons learned from power distribution equipment. In: IGLC-12, Elsinore, Denmark (2004) Elfving, J.A., Tommelein, I.D, Ballard, G.: Improving the delivery process for engineering-to-order products - lessons learned from power distribution equipment. In: IGLC-12, Elsinore, Denmark (2004)
6.
Zurück zum Zitat Haartveit, D.E., Semini, M., Alfnes, E.: Integration alternatives for ship designers and shipyards. In: Frick, J., Laugen, B.T. (eds.) Advances in Production Management Systems. IFIP AICT, vol. 384, pp. 309–316. Springer, Heidelberg (2012) Haartveit, D.E., Semini, M., Alfnes, E.: Integration alternatives for ship designers and shipyards. In: Frick, J., Laugen, B.T. (eds.) Advances in Production Management Systems. IFIP AICT, vol. 384, pp. 309–316. Springer, Heidelberg (2012)
7.
Zurück zum Zitat Forrester, J.W.: Industrial dynamics-a major breakthrough for decision makers. Harvard Bus. Rev. 36, 37–66 (1958) Forrester, J.W.: Industrial dynamics-a major breakthrough for decision makers. Harvard Bus. Rev. 36, 37–66 (1958)
8.
Zurück zum Zitat Tenhiãla, A.: Contingency theory of capacity planning: the link between process types and planning methods. J. Oper. Manag. 29, 65–77 (2011)CrossRef Tenhiãla, A.: Contingency theory of capacity planning: the link between process types and planning methods. J. Oper. Manag. 29, 65–77 (2011)CrossRef
9.
Zurück zum Zitat Viana, D.D., Bulhões, I.R., Formoso, C.T.: Core requirements for the development of a planning and control model for engineer-to-order in the construction industry. In: ELAGEC: ENCUENTRO Latino Americano De Gestion Y Economia De La Construccion, Cancun Mexico (2013) Viana, D.D., Bulhões, I.R., Formoso, C.T.: Core requirements for the development of a planning and control model for engineer-to-order in the construction industry. In: ELAGEC: ENCUENTRO Latino Americano De Gestion Y Economia De La Construccion, Cancun Mexico (2013)
10.
Zurück zum Zitat Liker, J.K.: The Toyota Way - 14 Management Principles from the World’s Greatest Manufacturer. McGraw-Hill, USA (2004) Liker, J.K.: The Toyota Way - 14 Management Principles from the World’s Greatest Manufacturer. McGraw-Hill, USA (2004)
11.
Zurück zum Zitat Stevenson, M., Hendry, L.C., Kingsman, B.G.: A review of production planning and control: the applicability of key concepts in make-to-order industry. Int. J. Prod. Res. 43, 869–898 (2005)CrossRef Stevenson, M., Hendry, L.C., Kingsman, B.G.: A review of production planning and control: the applicability of key concepts in make-to-order industry. Int. J. Prod. Res. 43, 869–898 (2005)CrossRef
12.
Zurück zum Zitat Park, C.-W., Lee, H.-S.: Performance evaluation of a multi-product CONWIP assembly system with correlated external demands. Int. J. Prod. Econ. 144, 334–344 (2013)CrossRef Park, C.-W., Lee, H.-S.: Performance evaluation of a multi-product CONWIP assembly system with correlated external demands. Int. J. Prod. Econ. 144, 334–344 (2013)CrossRef
13.
Zurück zum Zitat Liker, J.K., Lamb, T.: Lean Manufacturing Principles Guide: A Guide to Lean Shipbuilding. The University of Michigan, Ann Arbor (2000) Liker, J.K., Lamb, T.: Lean Manufacturing Principles Guide: A Guide to Lean Shipbuilding. The University of Michigan, Ann Arbor (2000)
14.
Zurück zum Zitat Ivert, L.K., Dukovska-Popovska, I., Kaipia, R., Fredriksson, A., Dreyer, H.C., Johansson, M.I., Chabada, L., Damgaard, M., Tuomikangas, N.: Sales and operations planning: responding to the needs of industrial food producers. Prod. Plan. Control 26, 280–295 (2014) Ivert, L.K., Dukovska-Popovska, I., Kaipia, R., Fredriksson, A., Dreyer, H.C., Johansson, M.I., Chabada, L., Damgaard, M., Tuomikangas, N.: Sales and operations planning: responding to the needs of industrial food producers. Prod. Plan. Control 26, 280–295 (2014)
15.
Zurück zum Zitat Kiekebos, P.A.: Applying the lean approaches CONWIP and Takt Time on steel unit assembly. MSc, Marine Technology of Ship Production, Delft University of Technology (2013) Kiekebos, P.A.: Applying the lean approaches CONWIP and Takt Time on steel unit assembly. MSc, Marine Technology of Ship Production, Delft University of Technology (2013)
Metadaten
Titel
Implementing Lean in Engineer-to-Order Industry: A Case Study
verfasst von
Kristina Kjersem
Lise Lillebrygfjeld Halse
Peter Kiekebos
Jan Emblemsvåg
Copyright-Jahr
2015
DOI
https://doi.org/10.1007/978-3-319-22759-7_29

Premium Partner