Skip to main content

2013 | OriginalPaper | Buchkapitel

33. Estimation of Lead Time in the RFID-Enabled Real-Time Shopfloor Production with a Data Mining Model

verfasst von : Ray Y. Zhong, George Q. Huang, Qing-yun Dai, Tao Zhang

Erschienen in: The 19th International Conference on Industrial Engineering and Engineering Management

Verlag: Springer Berlin Heidelberg

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

Lead time estimation (LTE) is difficult to carry out, especially within the RFID-enabled real-time manufacturing shopfloor environment since large number of factors may greatly affect its precision. This paper proposes a data mining approach with four steps each of which is equipped with suitable mathematical models to analysis the LTE from a real-life case and then to quantitatively examine its key impact factors such as processing routine, batching strategy, scheduling rules and critical parameters of specification. Experiments are carried out for this purpose and results imply that batching strategy, scheduling rules and two specification parameters largely influence the LTE, while, processing routine has less impact in this case.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
Zurück zum Zitat Alexander MS (1980) Manufacturing lead time estimation and the implementation of a material requirements planning system: a computer simulation study. The University of Western Ontario, Canada Alexander MS (1980) Manufacturing lead time estimation and the implementation of a material requirements planning system: a computer simulation study. The University of Western Ontario, Canada
Zurück zum Zitat Chen JS, Prorok PC (1983) Lead time estimation in a controlled screening program. Am J Epidemiol 118(5):740 Chen JS, Prorok PC (1983) Lead time estimation in a controlled screening program. Am J Epidemiol 118(5):740
Zurück zum Zitat Choudhary A, Harding J, Tiwari M (2009) Data mining in manufacturing: a review based on the kind of knowledge. J Intell Manuf 20(5):501–521CrossRef Choudhary A, Harding J, Tiwari M (2009) Data mining in manufacturing: a review based on the kind of knowledge. J Intell Manuf 20(5):501–521CrossRef
Zurück zum Zitat Dai QY, Zhong RY et al (2012) Radio frequency identification-enabled real-time manufacturing execution system: a case study in an automotive part manufacturer. Int J Comput Integr Manuf 25(1):51–65CrossRef Dai QY, Zhong RY et al (2012) Radio frequency identification-enabled real-time manufacturing execution system: a case study in an automotive part manufacturer. Int J Comput Integr Manuf 25(1):51–65CrossRef
Zurück zum Zitat Erdirik-Dogan M, Grossmann IE (2008) Simultaneous planning and scheduling of single-stage multi-product continuous plants with parallel lines. Comput Chem Eng 32(11):2664–2683CrossRef Erdirik-Dogan M, Grossmann IE (2008) Simultaneous planning and scheduling of single-stage multi-product continuous plants with parallel lines. Comput Chem Eng 32(11):2664–2683CrossRef
Zurück zum Zitat Frank J (2007) Using data mining to enhance automated planning and scheduling. In: Proceedings of IEEE symposium on computational intelligence and data mining, IEEE, March 1–April 5, pp 251–260 Frank J (2007) Using data mining to enhance automated planning and scheduling. In: Proceedings of IEEE symposium on computational intelligence and data mining, IEEE, March 1–April 5, pp 251–260
Zurück zum Zitat Geladi P, Kowalski BR (1986) Partial least-squares regression: a tutorial. Anal Chim Acta 185:1–17CrossRef Geladi P, Kowalski BR (1986) Partial least-squares regression: a tutorial. Anal Chim Acta 185:1–17CrossRef
Zurück zum Zitat Graves SC (1999) Manufacturing planning and control. Handbook of applied optimization, Massachusetts Institute of Technology, MA, pp 728–746 Graves SC (1999) Manufacturing planning and control. Handbook of applied optimization, Massachusetts Institute of Technology, MA, pp 728–746
Zurück zum Zitat Han J, Kamber M, Pei J (2011) Data mining: concepts and techniques. Morgan Kaufmann, San Francisco Han J, Kamber M, Pei J (2011) Data mining: concepts and techniques. Morgan Kaufmann, San Francisco
Zurück zum Zitat Huang GQ, Fang J, Lv HL et al (2009) RFID-enabled real-time mass-customized production planning and scheduling. In: Proceedings of 19th international conference on flexible automation and intelligent manufacturing, 6–8 July, Teesside, UK Huang GQ, Fang J, Lv HL et al (2009) RFID-enabled real-time mass-customized production planning and scheduling. In: Proceedings of 19th international conference on flexible automation and intelligent manufacturing, 6–8 July, Teesside, UK
Zurück zum Zitat Jeffery SR, Garofalakis M, Franklin MJ (2006) Adaptive cleaning for RFID data streams. In: Proceedings of the 32nd international conference on very large databases. VLDB Endowment, pp 163–174 Jeffery SR, Garofalakis M, Franklin MJ (2006) Adaptive cleaning for RFID data streams. In: Proceedings of the 32nd international conference on very large databases. VLDB Endowment, pp 163–174
Zurück zum Zitat Joachims T (1999) Making large-scale SVM learning practical. MIT Press, Cambridge Joachims T (1999) Making large-scale SVM learning practical. MIT Press, Cambridge
Zurück zum Zitat Jun HB, Park JY, Suh HW (2006) Lead time estimation method for complex product development process. Concurr Eng 14(4):313–328CrossRef Jun HB, Park JY, Suh HW (2006) Lead time estimation method for complex product development process. Concurr Eng 14(4):313–328CrossRef
Zurück zum Zitat Maravelias CT, Sung C (2009) Integration of production planning and scheduling: overview, challenges and opportunities. Comput Chem Eng 33(12):1919–1930CrossRef Maravelias CT, Sung C (2009) Integration of production planning and scheduling: overview, challenges and opportunities. Comput Chem Eng 33(12):1919–1930CrossRef
Zurück zum Zitat Ozturk A, Kayaligil S, Ozdemirel NE (2006) Manufacturing lead time estimation using data mining. Eur J Oper Res 173(2):683–700CrossRef Ozturk A, Kayaligil S, Ozdemirel NE (2006) Manufacturing lead time estimation using data mining. Eur J Oper Res 173(2):683–700CrossRef
Zurück zum Zitat Rao J, Doraiswamy S, Thakkar H, Colby LS (2006) A deferred cleansing method for RFID data analytics. In: Proceedings of the 32nd international conference on very large databases, pp 175–186 Rao J, Doraiswamy S, Thakkar H, Colby LS (2006) A deferred cleansing method for RFID data analytics. In: Proceedings of the 32nd international conference on very large databases, pp 175–186
Zurück zum Zitat Ruben RA, Mahmoodi F (2000) Lead time prediction in unbalanced production systems. Int J Prod Res 38(7):1711–1729CrossRef Ruben RA, Mahmoodi F (2000) Lead time prediction in unbalanced production systems. Int J Prod Res 38(7):1711–1729CrossRef
Zurück zum Zitat Sudiarso A, Putranto RA (2010) Lead time estimation of a production system using fuzzy logic approach for various batch sizes. Proc World Congr Eng 3:1–3 Sudiarso A, Putranto RA (2010) Lead time estimation of a production system using fuzzy logic approach for various batch sizes. Proc World Congr Eng 3:1–3
Zurück zum Zitat Wang K (2007) Applying data mining to manufacturing: the nature and implications. J Intell Manuf 18(4):487–495CrossRef Wang K (2007) Applying data mining to manufacturing: the nature and implications. J Intell Manuf 18(4):487–495CrossRef
Zurück zum Zitat Wang Y, Wong J, Miner A (2004) Anomaly intrusion detection using one class SVM. In: Proceedings of the 5th annual IEEE SMC information assurance workshop. IEEE, pp 358–364 Wang Y, Wong J, Miner A (2004) Anomaly intrusion detection using one class SVM. In: Proceedings of the 5th annual IEEE SMC information assurance workshop. IEEE, pp 358–364
Zurück zum Zitat Wang W, Chang CP, Huang CT, Wang BS (2009) A RFID-enabled with data mining model for exhibition industry. In: Proceedings of the 6th international conference on service systems and service management. IEEE, Xiamen, China, 8–10 June, pp 664–668 Wang W, Chang CP, Huang CT, Wang BS (2009) A RFID-enabled with data mining model for exhibition industry. In: Proceedings of the 6th international conference on service systems and service management. IEEE, Xiamen, China, 8–10 June, pp 664–668
Zurück zum Zitat Ward MN (1998) Diagnosis and short-lead time prediction of summer rainfall in tropical North Africa at interannual and multidecadal timescales. J Clim 11(12):3167–3191CrossRef Ward MN (1998) Diagnosis and short-lead time prediction of summer rainfall in tropical North Africa at interannual and multidecadal timescales. J Clim 11(12):3167–3191CrossRef
Metadaten
Titel
Estimation of Lead Time in the RFID-Enabled Real-Time Shopfloor Production with a Data Mining Model
verfasst von
Ray Y. Zhong
George Q. Huang
Qing-yun Dai
Tao Zhang
Copyright-Jahr
2013
Verlag
Springer Berlin Heidelberg
DOI
https://doi.org/10.1007/978-3-642-38391-5_33

Premium Partner