Skip to main content
Erschienen in: OR Spectrum 4/2016

01.10.2016 | Regular Article

Capacitated lot sizing with parallel machines, sequence-dependent setups, and a common setup operator

verfasst von: Horst Tempelmeier, Karina Copil

Erschienen in: OR Spectrum | Ausgabe 4/2016

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

In this paper, we consider a special variant of a capacitated dynamic lot sizing problem which, despite its practical relevance, has not been treated sufficiently in the literature. In addition to the significant complexity introduced by the sequence dependency of setup times, the problem is further complicated by the fact that there is only one single setup operator which is responsible for all setups on all machines. Hence, the multi-machine problem cannot be decomposed into multiple single machine problems, as the setup operations must be coordinated among the different machines. In addition, lots are produced in batches whereby the processing time of a lot is a step-wise function of the number of batches per lot. Due to perishability and quarantine issues, time windows for the production are given. We formulate a big-bucket lot sizing model and apply MIP-based heuristics to two industrial data sets.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Literatur
Zurück zum Zitat Almeder C, Almada-Lobo B (2011) Synchronisation of scarce resources for a parallel machine lotsizing problem. Int J Prod Res 49(24):7315–7335CrossRef Almeder C, Almada-Lobo B (2011) Synchronisation of scarce resources for a parallel machine lotsizing problem. Int J Prod Res 49(24):7315–7335CrossRef
Zurück zum Zitat Amorim P, Antunes CH, Almada-Lobo B (2011) Multi-objective lot-sizing and scheduling dealing with perishability issues. Ind Eng Chem Res 50(6):3371–3381CrossRef Amorim P, Antunes CH, Almada-Lobo B (2011) Multi-objective lot-sizing and scheduling dealing with perishability issues. Ind Eng Chem Res 50(6):3371–3381CrossRef
Zurück zum Zitat Brahimi N, Dauzère-Peres S, Najid NM (2006) Capacitated multi-item lot-sizing problems with time windows. Oper Res 54(5):951–967CrossRef Brahimi N, Dauzère-Peres S, Najid NM (2006) Capacitated multi-item lot-sizing problems with time windows. Oper Res 54(5):951–967CrossRef
Zurück zum Zitat Buschkühl L, Sahling F, Helber S, Tempelmeier H (2010) Dynamic capacitated lot-sizing problems: a classification and review of solution approaches. OR Spectr 32(2):231–261CrossRef Buschkühl L, Sahling F, Helber S, Tempelmeier H (2010) Dynamic capacitated lot-sizing problems: a classification and review of solution approaches. OR Spectr 32(2):231–261CrossRef
Zurück zum Zitat Clark A, Mahdieh M, Rangel S (2014) Production lot sizing and scheduling with non-triangular sequence-dependent setup times. Int J Prod Res 52(8):2490–2503CrossRef Clark A, Mahdieh M, Rangel S (2014) Production lot sizing and scheduling with non-triangular sequence-dependent setup times. Int J Prod Res 52(8):2490–2503CrossRef
Zurück zum Zitat Clark AR, Clark SJ (2000) Rolling-horizon lot-sizing when set-up times are sequence-dependent. Int J Prod Res 38(10):2287–2307CrossRef Clark AR, Clark SJ (2000) Rolling-horizon lot-sizing when set-up times are sequence-dependent. Int J Prod Res 38(10):2287–2307CrossRef
Zurück zum Zitat Dillenberger C, Escudero LF, Wollensak A, Zhang W (1994) On practical resource allocation for production planning and scheduling with period overlapping setups. Eur J Oper Res 75(2):275–286CrossRef Dillenberger C, Escudero LF, Wollensak A, Zhang W (1994) On practical resource allocation for production planning and scheduling with period overlapping setups. Eur J Oper Res 75(2):275–286CrossRef
Zurück zum Zitat Drexl A, Haase K (1995) Proportional lotsizing and scheduling. Int J Prod Econ 40(1):73–87CrossRef Drexl A, Haase K (1995) Proportional lotsizing and scheduling. Int J Prod Econ 40(1):73–87CrossRef
Zurück zum Zitat Fleischmann B, Henneberg T (1993) A decision support system for determining the flexibility and service level of a JIT production. In: Advanced in production management systems, pp 349–356 Fleischmann B, Henneberg T (1993) A decision support system for determining the flexibility and service level of a JIT production. In: Advanced in production management systems, pp 349–356
Zurück zum Zitat Helber S, Sahling F (2010) A fix-and-optimize approach for the multi-level capacitated lot sizing problem. Int J Prod Econ 123(2):247–256CrossRef Helber S, Sahling F (2010) A fix-and-optimize approach for the multi-level capacitated lot sizing problem. Int J Prod Econ 123(2):247–256CrossRef
Zurück zum Zitat James RJ, Almada-Lobo B (2011) Single and parallel machine capacitated lotsizing and scheduling: new iterative MIP-based neighborhood search heuristics. Comput Oper Res 38(12):1816–1825CrossRef James RJ, Almada-Lobo B (2011) Single and parallel machine capacitated lotsizing and scheduling: new iterative MIP-based neighborhood search heuristics. Comput Oper Res 38(12):1816–1825CrossRef
Zurück zum Zitat Jans R, Degraeve Z (2007) Meta-heuristics for dynamic lot sizing: a review and comparison of solution approaches. Eur J Oper Res 177(3):1855–1875CrossRef Jans R, Degraeve Z (2007) Meta-heuristics for dynamic lot sizing: a review and comparison of solution approaches. Eur J Oper Res 177(3):1855–1875CrossRef
Zurück zum Zitat Mateus GR, Ravetti MG, de Souza MC, Valeriano TM (2010) Capacitated lot sizing and sequence dependent setup scheduling: an iterative approach for integration. J Sched 13(3):245–259CrossRef Mateus GR, Ravetti MG, de Souza MC, Valeriano TM (2010) Capacitated lot sizing and sequence dependent setup scheduling: an iterative approach for integration. J Sched 13(3):245–259CrossRef
Zurück zum Zitat Meyr H (1999) Simultane Losgrößen- und Reihenfolgeplanung für kontinuierliche Produktionslinien. Gabler Edition Wissenschaft: Produktion und Logistik. Gabler, WiesbadenCrossRef Meyr H (1999) Simultane Losgrößen- und Reihenfolgeplanung für kontinuierliche Produktionslinien. Gabler Edition Wissenschaft: Produktion und Logistik. Gabler, WiesbadenCrossRef
Zurück zum Zitat Meyr H (2002) Simultaneous lotsizing and scheduling on parallel machines. Eur J Oper Res 139(2):277–292CrossRef Meyr H (2002) Simultaneous lotsizing and scheduling on parallel machines. Eur J Oper Res 139(2):277–292CrossRef
Zurück zum Zitat Pahl J, Voß S (2014) Integrating deterioration and lifetime constraints in production and supply chain planning: a survey. Eur J Oper Res 238(3):654–674CrossRef Pahl J, Voß S (2014) Integrating deterioration and lifetime constraints in production and supply chain planning: a survey. Eur J Oper Res 238(3):654–674CrossRef
Zurück zum Zitat Quadt D, Kuhn H (2008) Capacitated lot-sizing with extensions: a review. 4OR 6(1):61–83CrossRef Quadt D, Kuhn H (2008) Capacitated lot-sizing with extensions: a review. 4OR 6(1):61–83CrossRef
Zurück zum Zitat Stadtler H (2003) Multilevel lot sizing with setup times and multiple constrained resources: internally rolling schedules with lot-sizing windows. Oper Res 51(3):487–502CrossRef Stadtler H (2003) Multilevel lot sizing with setup times and multiple constrained resources: internally rolling schedules with lot-sizing windows. Oper Res 51(3):487–502CrossRef
Zurück zum Zitat Tempelmeier H, Buschkühl L (2008) Dynamic multi-machine lotsizing and sequencing with simultaneous scheduling of a common setup resource. Int J Prod Econ 113(1):401–412CrossRef Tempelmeier H, Buschkühl L (2008) Dynamic multi-machine lotsizing and sequencing with simultaneous scheduling of a common setup resource. Int J Prod Econ 113(1):401–412CrossRef
Metadaten
Titel
Capacitated lot sizing with parallel machines, sequence-dependent setups, and a common setup operator
verfasst von
Horst Tempelmeier
Karina Copil
Publikationsdatum
01.10.2016
Verlag
Springer Berlin Heidelberg
Erschienen in
OR Spectrum / Ausgabe 4/2016
Print ISSN: 0171-6468
Elektronische ISSN: 1436-6304
DOI
https://doi.org/10.1007/s00291-015-0410-2

Weitere Artikel der Ausgabe 4/2016

OR Spectrum 4/2016 Zur Ausgabe