Skip to main content
Erschienen in: Journal of Intelligent Manufacturing 1/2015

01.02.2015

Active scheduling for hybrid flowshop with family setup time and inconsistent family formation

verfasst von: Hao Luo, Abraham Zhang, George Q. Huang

Erschienen in: Journal of Intelligent Manufacturing | Ausgabe 1/2015

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

This research is motivated by a real-life hybrid flowshop scheduling problem where jobs are organized in families according to their machine settings and tools. This type of problem is common in the production process of standard metal components. The problem is complicated by the requirement of family setup time when a machine changes from processing one job family to another and the formation of job families varies in different stages. This problem has been previously solved with a non-delay scheduling heuristic in which no machine is kept idle. This research illustrates that inserting intentional idle time into a non-delay schedule can further reduce the total setup time as well as makespan. With the inserted idle time, the non-delay schedules are extended to active schedules. This paper presents a mechanism to determine the locations and lengths of intentional idle times in the efficient active schedules. Four active scheduling approaches are developed by integrating two types of waiting factor operators into two non-delay approaches. Computational experiments have been conducted to compare the proposed active scheduling approaches in terms of effectiveness and efficiency. The results have shown that the proposed active scheduling approaches are superior to non-delay scheduling. The analysis of variance has been applied on the factors related to scheduling environment, problem size and scheduling approach. The analysis has identified factors that are most influential on the scheduling result.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Anhänge
Nur mit Berechtigung zugänglich
Literatur
Zurück zum Zitat Allahverdi, A., Ng, C. T., Cheng, T. C. E., & Kovalyov, M. Y. (2008). A survey of scheduling problems with setup times or costs. European Journal of Operational Research, 187(3), 985–1032.CrossRef Allahverdi, A., Ng, C. T., Cheng, T. C. E., & Kovalyov, M. Y. (2008). A survey of scheduling problems with setup times or costs. European Journal of Operational Research, 187(3), 985–1032.CrossRef
Zurück zum Zitat Gen, M., & Cheng, R. (1997). Genetic algorithms and engineering design. New York: Wiley. Gen, M., & Cheng, R. (1997). Genetic algorithms and engineering design. New York: Wiley.
Zurück zum Zitat Goldgerg, D., & Lingle, R. (1985). Alleles, loci, and the traveling salesman problem. Hillsdale: Paper presented at the First international Conference on Genetic Algorithms and their Applications. Goldgerg, D., & Lingle, R. (1985). Alleles, loci, and the traveling salesman problem. Hillsdale: Paper presented at the First international Conference on Genetic Algorithms and their Applications.
Zurück zum Zitat Gupta, J. N. D., & Schaller, J. E. (2005). Minimizing flow time in a flow-line manufacturing cell with family setup times. Journal of the Operational Research Society, 57(2), 163–176. Gupta, J. N. D., & Schaller, J. E. (2005). Minimizing flow time in a flow-line manufacturing cell with family setup times. Journal of the Operational Research Society, 57(2), 163–176.
Zurück zum Zitat Kim, H.-W., & Lee, D.-H. (2009). Heuristic algorithms for re-entrant hybrid flow shop scheduling with unrelated parallel machines. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 223(4), 433–442.CrossRef Kim, H.-W., & Lee, D.-H. (2009). Heuristic algorithms for re-entrant hybrid flow shop scheduling with unrelated parallel machines. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 223(4), 433–442.CrossRef
Zurück zum Zitat Lin, B. M. T., & Cheng, T. C. E. (2005). Two-machine flowshop batching and scheduling. Annals of Operations Research, 133, 149–161.CrossRef Lin, B. M. T., & Cheng, T. C. E. (2005). Two-machine flowshop batching and scheduling. Annals of Operations Research, 133, 149–161.CrossRef
Zurück zum Zitat Logendran, R., Carson, S., & Hanson, E. (2005). Group scheduling in flexible flow shops. International Journal of Production Economics, 96(2), 143–155.CrossRef Logendran, R., Carson, S., & Hanson, E. (2005). Group scheduling in flexible flow shops. International Journal of Production Economics, 96(2), 143–155.CrossRef
Zurück zum Zitat Logendran, R., deSzoeke, P., & Barnard, F. (2006). Sequence-dependent group scheduling problems in flexible flow shops. International Journal of Production Economics, 102(1), 66–86. Logendran, R., deSzoeke, P., & Barnard, F. (2006). Sequence-dependent group scheduling problems in flexible flow shops. International Journal of Production Economics, 102(1), 66–86.
Zurück zum Zitat Luo, H., Huang, G. Q., Shi, Y., Qu, T., & Zhang, Y. (2012). Hybrid flowshop scheduling with family setup time and inconsistent family formation. International Journal of Production Research, 50(6), 1457–1475. Luo, H., Huang, G. Q., Shi, Y., Qu, T., & Zhang, Y. (2012). Hybrid flowshop scheduling with family setup time and inconsistent family formation. International Journal of Production Research, 50(6), 1457–1475.
Zurück zum Zitat Mendes, J. J. M., Gonçalves, J. F., & Resende, M. G. C. (2009). A random key based genetic algorithm for the resource constrained project scheduling problem. Computers & Operations Research, 36(1), 92–109.CrossRef Mendes, J. J. M., Gonçalves, J. F., & Resende, M. G. C. (2009). A random key based genetic algorithm for the resource constrained project scheduling problem. Computers & Operations Research, 36(1), 92–109.CrossRef
Zurück zum Zitat Michalewicz, Z. (1996). Genetic algorithms+data structures=evolution programs. Berlin: Springer.CrossRef Michalewicz, Z. (1996). Genetic algorithms+data structures=evolution programs. Berlin: Springer.CrossRef
Zurück zum Zitat Mirsanei, H., Zandieh, M., Moayed, M., & Khabbazi, M. (2011). A simulated annealing algorithm approach to hybrid flow shop scheduling with sequence-dependent setup times. Journal of Intelligent Manufacturing, 22(6), 965–978.CrossRef Mirsanei, H., Zandieh, M., Moayed, M., & Khabbazi, M. (2011). A simulated annealing algorithm approach to hybrid flow shop scheduling with sequence-dependent setup times. Journal of Intelligent Manufacturing, 22(6), 965–978.CrossRef
Zurück zum Zitat Pinedo, M. L. (2008). Scheduling: Theory, algorithms, and systems (3rd ed.). Berlin: Springer. Pinedo, M. L. (2008). Scheduling: Theory, algorithms, and systems (3rd ed.). Berlin: Springer.
Zurück zum Zitat Salmasi, N., Logendran, R., & Skandari, M. (2011). Makespan minimization of a flowshop sequence-dependent group scheduling problem. The International Journal of Advanced Manufacturing Technology, 56(5), 699–710.CrossRef Salmasi, N., Logendran, R., & Skandari, M. (2011). Makespan minimization of a flowshop sequence-dependent group scheduling problem. The International Journal of Advanced Manufacturing Technology, 56(5), 699–710.CrossRef
Zurück zum Zitat Sprecher, A., Kolisch, R., & Drexl, A. (1995). Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem. European Journal of Operational Research, 80(1), 94–102.CrossRef Sprecher, A., Kolisch, R., & Drexl, A. (1995). Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem. European Journal of Operational Research, 80(1), 94–102.CrossRef
Zurück zum Zitat Zandieh, M., Mozaffari, E., & Gholami, M. (2010). A robust genetic algorithm for scheduling realistic hybrid flexible flow line problems. Journal of Intelligent Manufacturing, 21(6), 731–743.CrossRef Zandieh, M., Mozaffari, E., & Gholami, M. (2010). A robust genetic algorithm for scheduling realistic hybrid flexible flow line problems. Journal of Intelligent Manufacturing, 21(6), 731–743.CrossRef
Metadaten
Titel
Active scheduling for hybrid flowshop with family setup time and inconsistent family formation
verfasst von
Hao Luo
Abraham Zhang
George Q. Huang
Publikationsdatum
01.02.2015
Verlag
Springer US
Erschienen in
Journal of Intelligent Manufacturing / Ausgabe 1/2015
Print ISSN: 0956-5515
Elektronische ISSN: 1572-8145
DOI
https://doi.org/10.1007/s10845-013-0771-9

Weitere Artikel der Ausgabe 1/2015

Journal of Intelligent Manufacturing 1/2015 Zur Ausgabe

    Marktübersichten

    Die im Laufe eines Jahres in der „adhäsion“ veröffentlichten Marktübersichten helfen Anwendern verschiedenster Branchen, sich einen gezielten Überblick über Lieferantenangebote zu verschaffen.