Design of an efficient genetic algorithm for resource-constrained unrelated parallel machine scheduling problem with machine eligibility restrictions

verfasst von: Mojtaba Afzalirad, Masoud Shafipour

Erschienen in: Journal of Intelligent Manufacturing | Ausgabe 2/2018

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

This study addresses a resource-constrained unrelated parallel machine scheduling problem with machine eligibility restrictions. Majority of the traditional scheduling problems in parallel machine environment deal with machine as the only resource. However, other resources such as labors, tools, jigs, fixtures, pallets, dies, and industrial robots are not only required for processing jobs but also are often restricted. Considering other resources makes the scheduling problems more realistic and practical to implement in manufacturing environments. First, an integer mathematical programming model with the objective of minimizing makespan is developed for this problem. Noteworthy, due to NP-hardness of the considered problem, application of meta-heuristic is avoidable. Furthermore, two new genetic algorithms including a pure genetic algorithm and a genetic algorithm along with a heuristic procedure are proposed to tackle this problem. With regard to the fact that appropriate design of the parameters has a significant effect on the performance of algorithms, hence, we calibrate the parameters of these algorithms by using the response surface method. The performance of the proposed algorithms is evaluated by a number of numerical examples. The computational results demonstrated that the proposed genetic algorithm is an effective and appropriate approach for our investigated problem.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Anhänge
Nur mit Berechtigung zugänglich
Literatur
Zurück zum Zitat Alavidoost, M. H., Fazel Zarandi, M. H., Tarimoradi, M., & Nemati, Y. (2014). Modified genetic algorithm for simple straight and U-shaped assembly line balancing with fuzzy processing times. Journal of Intelligent Manufacturing. doi:10.1007/s10845-014-0978-4 Alavidoost, M. H., Fazel Zarandi, M. H., Tarimoradi, M., & Nemati, Y. (2014). Modified genetic algorithm for simple straight and U-shaped assembly line balancing with fuzzy processing times. Journal of Intelligent Manufacturing. doi:10.​1007/​s10845-014-0978-4
Zurück zum Zitat Alcan, P., & BaşLıGil, H. S. (2012). A genetic algorithm application using fuzzy processing times in non-identical parallel machine scheduling problem. Advances in Engineering Software, 45(1), 272–280.CrossRef Alcan, P., & BaşLıGil, H. S. (2012). A genetic algorithm application using fuzzy processing times in non-identical parallel machine scheduling problem. Advances in Engineering Software, 45(1), 272–280.CrossRef
Zurück zum Zitat Arnaout, J.-P., Musa, R., & Rabadi, G. (2014). A two-stage Ant Colony optimization algorithm to minimize the makespan on unrelated parallel machines—part II: Enhancements and experimentations. Journal of Intelligent Manufacturing, 25(1), 43–53.CrossRef Arnaout, J.-P., Musa, R., & Rabadi, G. (2014). A two-stage Ant Colony optimization algorithm to minimize the makespan on unrelated parallel machines—part II: Enhancements and experimentations. Journal of Intelligent Manufacturing, 25(1), 43–53.CrossRef
Zurück zum Zitat Bilyk, A., & Monch, L. (2012). A variable neighborhood search approach for planning and scheduling of jobs on unrelated parallel machines. Journal of Intelligent Manufacturing, 23(5), 1621–1635.CrossRef Bilyk, A., & Monch, L. (2012). A variable neighborhood search approach for planning and scheduling of jobs on unrelated parallel machines. Journal of Intelligent Manufacturing, 23(5), 1621–1635.CrossRef
Zurück zum Zitat Çakar, T., Köker, R., & Demir, Hİ. (2008). Parallel robot scheduling to minimize mean tardiness with precedence constraints using a genetic algorithm. Advances in Engineering Software, 39(1), 47–54.CrossRef Çakar, T., Köker, R., & Demir, Hİ. (2008). Parallel robot scheduling to minimize mean tardiness with precedence constraints using a genetic algorithm. Advances in Engineering Software, 39(1), 47–54.CrossRef
Zurück zum Zitat Centeno, G., & Armacost, R. L. (1997). Parallel machine scheduling with release time and machine eligibility restrictions. Computers and Industrial Engineering, 33(1–2), 273–276.CrossRef Centeno, G., & Armacost, R. L. (1997). Parallel machine scheduling with release time and machine eligibility restrictions. Computers and Industrial Engineering, 33(1–2), 273–276.CrossRef
Zurück zum Zitat Centeno, G., & Armacost, R. L. (2004). Minimizing makespan on parallel machines with release time and machine eligibility restrictions. International Journal of Production Research, 42(6), 1243–1256.CrossRef Centeno, G., & Armacost, R. L. (2004). Minimizing makespan on parallel machines with release time and machine eligibility restrictions. International Journal of Production Research, 42(6), 1243–1256.CrossRef
Zurück zum Zitat Chaudhry, I. A., & Drake, P. R. (2009). Minimizing total tardiness for the machine scheduling and worker assignment problems in identical parallel machines using genetic algorithms. International Journal of Advanced Manufacturing Technology, 42(5–6), 581–594.CrossRef Chaudhry, I. A., & Drake, P. R. (2009). Minimizing total tardiness for the machine scheduling and worker assignment problems in identical parallel machines using genetic algorithms. International Journal of Advanced Manufacturing Technology, 42(5–6), 581–594.CrossRef
Zurück zum Zitat Chen, J. F. (2005). Unrelated parallel machine scheduling with secondary resource constraints. International Journal of Advanced Manufacturing Technology, 26(3), 285–292.CrossRef Chen, J. F. (2005). Unrelated parallel machine scheduling with secondary resource constraints. International Journal of Advanced Manufacturing Technology, 26(3), 285–292.CrossRef
Zurück zum Zitat Chen, J. F., & Wu, T. H. (2006). Total tardiness minimization on unrelated parallel machine scheduling with auxiliary equipment constraints. Omega, 34(1), 81–89.CrossRef Chen, J. F., & Wu, T. H. (2006). Total tardiness minimization on unrelated parallel machine scheduling with auxiliary equipment constraints. Omega, 34(1), 81–89.CrossRef
Zurück zum Zitat Cheng, R., Gen, M., & Tozawa, T. (1995). Minmax earliness/tardiness scheduling in identical parallel machine system using genetic algorithm. Computers and Industrial Engineering, 29(1–4), 513–517. Cheng, R., Gen, M., & Tozawa, T. (1995). Minmax earliness/tardiness scheduling in identical parallel machine system using genetic algorithm. Computers and Industrial Engineering, 29(1–4), 513–517.
Zurück zum Zitat Cheng, R., & Gen, M. (1997). Parallel machine scheduling problems using memetic algorithms. Computers and Industrial Engineering, 33(3–4), 761–764.CrossRef Cheng, R., & Gen, M. (1997). Parallel machine scheduling problems using memetic algorithms. Computers and Industrial Engineering, 33(3–4), 761–764.CrossRef
Zurück zum Zitat Cho, D. W., Lee, Y. H., Lee, T. Y., & Gen, M. (2014). An adaptive genetic algorithm for the time dependent inventory routing problem. Journal of Intelligent Manufacturing, 25(5), 1025–1042.CrossRef Cho, D. W., Lee, Y. H., Lee, T. Y., & Gen, M. (2014). An adaptive genetic algorithm for the time dependent inventory routing problem. Journal of Intelligent Manufacturing, 25(5), 1025–1042.CrossRef
Zurück zum Zitat Cochran, J. K., Horng, S. M., & Fowler, J. W. (2003). A multi-population genetic algorithm to solve multi-objective scheduling problems for parallel machines. Computers and Operations Research, 30(7), 1087–1102.CrossRef Cochran, J. K., Horng, S. M., & Fowler, J. W. (2003). A multi-population genetic algorithm to solve multi-objective scheduling problems for parallel machines. Computers and Operations Research, 30(7), 1087–1102.CrossRef
Zurück zum Zitat Damodaran, P., Hirani, N. S., & Velez-Gallego, M. C. (2009). Scheduling identical parallel batch processing machines to minimise makespan using genetic algorithms. European Journal of Industrial Engineering, 3(2), 187–206.CrossRef Damodaran, P., Hirani, N. S., & Velez-Gallego, M. C. (2009). Scheduling identical parallel batch processing machines to minimise makespan using genetic algorithms. European Journal of Industrial Engineering, 3(2), 187–206.CrossRef
Zurück zum Zitat Edis, E. B., & Ozkarahan, I. (2012). Solution approaches for a real-life resource-constrained parallel machine scheduling problem. International Journal of Advanced Manufacturing Technology, 58(9–12), 1141–1153.CrossRef Edis, E. B., & Ozkarahan, I. (2012). Solution approaches for a real-life resource-constrained parallel machine scheduling problem. International Journal of Advanced Manufacturing Technology, 58(9–12), 1141–1153.CrossRef
Zurück zum Zitat Edis, E. B., Oguz, C., & Ozkarahan, I. (2013). Parallel machine scheduling with additional resources: Notation, classification, models and solution methods. European Journal of Operational Research, 230, 449–463.CrossRef Edis, E. B., Oguz, C., & Ozkarahan, I. (2013). Parallel machine scheduling with additional resources: Notation, classification, models and solution methods. European Journal of Operational Research, 230, 449–463.CrossRef
Zurück zum Zitat Fazel Zarandi, M.H., Khorshidian, H., & Akbarpour Shirazi, M. (2014). A constraint programming model for the scheduling of JIT cross-docking systems with preemption. Journal of Intelligent Manufacturing. doi:10.1007/s10845-013-0860-9 Fazel Zarandi, M.H., Khorshidian, H., & Akbarpour Shirazi, M. (2014). A constraint programming model for the scheduling of JIT cross-docking systems with preemption. Journal of Intelligent Manufacturing. doi:10.​1007/​s10845-013-0860-9
Zurück zum Zitat Gen, M., & Cheng, R. (2000). Genetic algorithms and engineering optimization. New York: Wiley. Gen, M., & Cheng, R. (2000). Genetic algorithms and engineering optimization. New York: Wiley.
Zurück zum Zitat Gen, M., Cheng, R., & Lin, L. (2008). Network models and optimization: Multiobjective genetic algorithm approach. London: Springer. Gen, M., Cheng, R., & Lin, L. (2008). Network models and optimization: Multiobjective genetic algorithm approach. London: Springer.
Zurück zum Zitat Chang, P. C., & Cheng, S. H. (2011). Integrating dominance properties with genetic algorithms for parallel machine scheduling problems with setup times. Applied Soft Computing, 11(1), 1263–1274.CrossRef Chang, P. C., & Cheng, S. H. (2011). Integrating dominance properties with genetic algorithms for parallel machine scheduling problems with setup times. Applied Soft Computing, 11(1), 1263–1274.CrossRef
Zurück zum Zitat Gokhale, R., & Mathirajan, M. (2012). Scheduling identical parallel machines with machine eligibility restrictions to minimize total weighted flowtime in automobile gear manufacturing. International Journal of Advanced Manufacturing Technology, 60(9–12), 1099–1110.CrossRef Gokhale, R., & Mathirajan, M. (2012). Scheduling identical parallel machines with machine eligibility restrictions to minimize total weighted flowtime in automobile gear manufacturing. International Journal of Advanced Manufacturing Technology, 60(9–12), 1099–1110.CrossRef
Zurück zum Zitat Graham, R. L., Lawler, E. L., Lenstra, J. K., & Kan, A. H. G. (1979). Optimization and approximation in deterministic sequencing and scheduling: A survey. Annals of Discrete Mathematics, 5, 287–326.CrossRef Graham, R. L., Lawler, E. L., Lenstra, J. K., & Kan, A. H. G. (1979). Optimization and approximation in deterministic sequencing and scheduling: A survey. Annals of Discrete Mathematics, 5, 287–326.CrossRef
Zurück zum Zitat Holland, H. J. (1975). Adaptation in natural and artificial systems. Ann Arbor, Michigan: The University of Michigan Press. Holland, H. J. (1975). Adaptation in natural and artificial systems. Ann Arbor, Michigan: The University of Michigan Press.
Zurück zum Zitat Hu, X., Bao, J. S., & Jin, Y. (2010). Minimising makespan on parallel machines with precedence constraints and machine eligibility restrictions. International Journal of Production Research, 48(6), 1639–1651.CrossRef Hu, X., Bao, J. S., & Jin, Y. (2010). Minimising makespan on parallel machines with precedence constraints and machine eligibility restrictions. International Journal of Production Research, 48(6), 1639–1651.CrossRef
Zurück zum Zitat Husseinzadeh Kashan, A., Karimi, B., & Jenabi, M. (2008). A hybrid genetic heuristic for scheduling parallel batch processing machines with arbitrary job sizes. Computers and Operations Research, 35(4), 1084–1098.CrossRef Husseinzadeh Kashan, A., Karimi, B., & Jenabi, M. (2008). A hybrid genetic heuristic for scheduling parallel batch processing machines with arbitrary job sizes. Computers and Operations Research, 35(4), 1084–1098.CrossRef
Zurück zum Zitat Joo, C. M., & Kim, B. S. (2012). Parallel machine scheduling problem with ready times, due times and sequence-dependent setup times using meta-heuristic algorithms. Engineering Optimization, 44(9), 1021–1034.CrossRef Joo, C. M., & Kim, B. S. (2012). Parallel machine scheduling problem with ready times, due times and sequence-dependent setup times using meta-heuristic algorithms. Engineering Optimization, 44(9), 1021–1034.CrossRef
Zurück zum Zitat Kim, D. W., Kim, K. H., Jang, W., & Frank Chen, F. (2002). Unrelated parallel machine scheduling with setup times using simulated annealing. Robotics and Computer Integrated Manufacturing, 18(3–4), 223–231.CrossRef Kim, D. W., Kim, K. H., Jang, W., & Frank Chen, F. (2002). Unrelated parallel machine scheduling with setup times using simulated annealing. Robotics and Computer Integrated Manufacturing, 18(3–4), 223–231.CrossRef
Zurück zum Zitat Li, D., Meng, X., Liang, Q., & Zhao, J. (2014). A heuristic-search genetic algorithm for multi-stage hybrid flow shop scheduling with single processing machines and batch processing machines. Journal of Intelligent Manufacturing. doi:10.1007/s10845-014-0874-y Li, D., Meng, X., Liang, Q., & Zhao, J. (2014). A heuristic-search genetic algorithm for multi-stage hybrid flow shop scheduling with single processing machines and batch processing machines. Journal of Intelligent Manufacturing. doi:10.​1007/​s10845-014-0874-y
Zurück zum Zitat Li, K., Shi, Y., Yang, S. L., & Cheng, B. Y. (2011). Parallel machine scheduling problem to minimize the makespan with resource dependent processing times. Applied Soft Computing, 11(8), 5551–5557.CrossRef Li, K., Shi, Y., Yang, S. L., & Cheng, B. Y. (2011). Parallel machine scheduling problem to minimize the makespan with resource dependent processing times. Applied Soft Computing, 11(8), 5551–5557.CrossRef
Zurück zum Zitat Liang, C. J., Chen, M., Gen, M., & Jo, J. (2014). A multi-objective genetic algorithm for yard crane scheduling problem with multiple work lines. Journal of Intelligent Manufacturing, 25(5), 1013–1024.CrossRef Liang, C. J., Chen, M., Gen, M., & Jo, J. (2014). A multi-objective genetic algorithm for yard crane scheduling problem with multiple work lines. Journal of Intelligent Manufacturing, 25(5), 1013–1024.CrossRef
Zurück zum Zitat Liao, L. W., & Sheen, G. J. (2008). Parallel machine scheduling with machine availability and eligibility constraints. European Journal of Operational Research, 184(2), 458–467.CrossRef Liao, L. W., & Sheen, G. J. (2008). Parallel machine scheduling with machine availability and eligibility constraints. European Journal of Operational Research, 184(2), 458–467.CrossRef
Zurück zum Zitat Malve, S., & Uzsoy, R. (2007). A genetic algorithm for minimizing maximum lateness on parallel identical batch processing machines with dynamic job arrivals and incompatible job families. Computers and Operations Research, 34(10), 3016–3028.CrossRef Malve, S., & Uzsoy, R. (2007). A genetic algorithm for minimizing maximum lateness on parallel identical batch processing machines with dynamic job arrivals and incompatible job families. Computers and Operations Research, 34(10), 3016–3028.CrossRef
Zurück zum Zitat Mehravaran, Y., & Logendran, R. (2013). Non-permutation flowshop scheduling with dual resources. Expert Systems with Applications, 40(13), 5061–5076.CrossRef Mehravaran, Y., & Logendran, R. (2013). Non-permutation flowshop scheduling with dual resources. Expert Systems with Applications, 40(13), 5061–5076.CrossRef
Zurück zum Zitat Montgomery, D. C. (1991). Design and analysis of experiments (3rd ed.). New York: Wiley. Montgomery, D. C. (1991). Design and analysis of experiments (3rd ed.). New York: Wiley.
Zurück zum Zitat Naderi, B., & Ruiz, R. (2010). The distributed permutation flow shop scheduling problem. Computers and Operations Research, 37(4), 754–768.CrossRef Naderi, B., & Ruiz, R. (2010). The distributed permutation flow shop scheduling problem. Computers and Operations Research, 37(4), 754–768.CrossRef
Zurück zum Zitat Pan, Q. K., Wang, L., Mao, K., Zhao, J. H., & Zhang, M. (2013). An effective artificial bee colony algorithm for a real-world hybrid flowshop problem in steelmaking process. IEEE Transactions on Automation Science and Engineering, 10(2), 307–322.CrossRef Pan, Q. K., Wang, L., Mao, K., Zhao, J. H., & Zhang, M. (2013). An effective artificial bee colony algorithm for a real-world hybrid flowshop problem in steelmaking process. IEEE Transactions on Automation Science and Engineering, 10(2), 307–322.CrossRef
Zurück zum Zitat Pinedo, M. (1995). Scheduling theory, algorithms and systems. Upper Saddle River: Prentice Hall. Pinedo, M. (1995). Scheduling theory, algorithms and systems. Upper Saddle River: Prentice Hall.
Zurück zum Zitat Rajakumar, S., Arunachalam, V. P., & Selladurai, V. (2006). Workflow balancing in parallel machine scheduling with precedence constraints using genetic algorithm. Journal of Manufacturing Technology Management, 17(2), 239–254.CrossRef Rajakumar, S., Arunachalam, V. P., & Selladurai, V. (2006). Workflow balancing in parallel machine scheduling with precedence constraints using genetic algorithm. Journal of Manufacturing Technology Management, 17(2), 239–254.CrossRef
Zurück zum Zitat Sheen, G. J., Liao, L. W., & Lin, C. F. (2008). Optimal parallel machines scheduling with machine availability and eligibility constraints. International Journal of Advanced Manufacturing Technology, 36(1–2), 132–139. Sheen, G. J., Liao, L. W., & Lin, C. F. (2008). Optimal parallel machines scheduling with machine availability and eligibility constraints. International Journal of Advanced Manufacturing Technology, 36(1–2), 132–139.
Zurück zum Zitat Silva, C., & Magalhaes, J. M. (2006). Heuristic lot size scheduling on unrelated parallel machines with applications in the textile industry. Computer and Industrial Engineering, 50(1–2), 76–89.CrossRef Silva, C., & Magalhaes, J. M. (2006). Heuristic lot size scheduling on unrelated parallel machines with applications in the textile industry. Computer and Industrial Engineering, 50(1–2), 76–89.CrossRef
Zurück zum Zitat Sivrikaya-Şerifoglu, F., & Ulusoy, G. (1999). Parallel machine scheduling with earliness and tardiness penalties. Computers and Operations Research, 26(8), 773–787.CrossRef Sivrikaya-Şerifoglu, F., & Ulusoy, G. (1999). Parallel machine scheduling with earliness and tardiness penalties. Computers and Operations Research, 26(8), 773–787.CrossRef
Zurück zum Zitat Takeyasu, K., & Kainosho, M. (2014). Optimization technique by genetic algorithms for international logistics. Journal of Intelligent Manufacturing, 25(5), 1043–1049.CrossRef Takeyasu, K., & Kainosho, M. (2014). Optimization technique by genetic algorithms for international logistics. Journal of Intelligent Manufacturing, 25(5), 1043–1049.CrossRef
Zurück zum Zitat Tavakkoli-Moghaddam, R., Taheri, F., Bazzazi, M., Izadi, M., & Sassani, F. (2009). Design of a genetic algorithm for bi objective unrelated parallel machines scheduling with sequence dependent setup times and precedence constraints. Computers and Operations Research, 36(12), 3224–3230. Tavakkoli-Moghaddam, R., Taheri, F., Bazzazi, M., Izadi, M., & Sassani, F. (2009). Design of a genetic algorithm for bi objective unrelated parallel machines scheduling with sequence dependent setup times and precedence constraints. Computers and Operations Research, 36(12), 3224–3230.
Zurück zum Zitat Torabi, S. A., Sahebjamnia, N., Mansouri, S. A., & Aramon Bajestani, M. (2013). A particle swarm optimization for a fuzzy multi-objective unrelated parallel machines scheduling problem. Applied Soft Computing, 13(12), 4750–4762.CrossRef Torabi, S. A., Sahebjamnia, N., Mansouri, S. A., & Aramon Bajestani, M. (2013). A particle swarm optimization for a fuzzy multi-objective unrelated parallel machines scheduling problem. Applied Soft Computing, 13(12), 4750–4762.CrossRef
Zurück zum Zitat Vallada, E., & Ruiz, R. (2011). A genetic algorithm for the unrelated parallel machine scheduling problem with sequence dependent setup times. European Journal of Operational Research, 211(3), 612–622.CrossRef Vallada, E., & Ruiz, R. (2011). A genetic algorithm for the unrelated parallel machine scheduling problem with sequence dependent setup times. European Journal of Operational Research, 211(3), 612–622.CrossRef
Zurück zum Zitat Ventura, J. A., & Kim, D. (2000). Parallel machine scheduling about an unrestricted due date and additional resource constraints. IIE Transactions, 32(2), 147–153. Ventura, J. A., & Kim, D. (2000). Parallel machine scheduling about an unrestricted due date and additional resource constraints. IIE Transactions, 32(2), 147–153.
Zurück zum Zitat Ventura, J. A., & Kim, D. (2003). Parallel machine scheduling with earliness-tardiness penalties and additional resource constraints. Computers and Operations Research, 30(13), 1945–1958.CrossRef Ventura, J. A., & Kim, D. (2003). Parallel machine scheduling with earliness-tardiness penalties and additional resource constraints. Computers and Operations Research, 30(13), 1945–1958.CrossRef
Zurück zum Zitat Wang, I. L., Wang, Y. C., & Chen, C. W. (2013). Scheduling unrelated parallel machines in semiconductor manufacturing by problem reduction and local search heuristics. Flexible Services and Manufacturing Journal, 25(35), 343–366.CrossRef Wang, I. L., Wang, Y. C., & Chen, C. W. (2013). Scheduling unrelated parallel machines in semiconductor manufacturing by problem reduction and local search heuristics. Flexible Services and Manufacturing Journal, 25(35), 343–366.CrossRef
Zurück zum Zitat Yi, Y., & Wang, D. W. (2003). Soft computing for scheduling for with batch setup times and earliness-tardiness penalties on parallel machines. Journal of Intelligent Manufacturing, 14, 311–322.CrossRef Yi, Y., & Wang, D. W. (2003). Soft computing for scheduling for with batch setup times and earliness-tardiness penalties on parallel machines. Journal of Intelligent Manufacturing, 14, 311–322.CrossRef
Zurück zum Zitat Yilmaz Eroglu, D., Ozmutlu, H. C., & Ozmutlu, S. (2014). Genetic algorithm with local search for the unrelated parallel machine scheduling problem with sequence-dependent set-up times. International Journal of Production Research, 52(19), 5841–5856.CrossRef Yilmaz Eroglu, D., Ozmutlu, H. C., & Ozmutlu, S. (2014). Genetic algorithm with local search for the unrelated parallel machine scheduling problem with sequence-dependent set-up times. International Journal of Production Research, 52(19), 5841–5856.CrossRef
Zurück zum Zitat Yu, L., Shih, H. M., Pfund, M., Carlyle, W. M., & Fowler, J. W. (2002). Scheduling of unrelated parallel machines: An application to PWB manufacturing. IIE Transactions, 34(11), 921–931. Yu, L., Shih, H. M., Pfund, M., Carlyle, W. M., & Fowler, J. W. (2002). Scheduling of unrelated parallel machines: An application to PWB manufacturing. IIE Transactions, 34(11), 921–931.
Metadaten
Titel
Design of an efficient genetic algorithm for resource-constrained unrelated parallel machine scheduling problem with machine eligibility restrictions
verfasst von
Mojtaba Afzalirad
Masoud Shafipour
Publikationsdatum
24.06.2015
Verlag
Springer US
Erschienen in
Journal of Intelligent Manufacturing / Ausgabe 2/2018
Print ISSN: 0956-5515
Elektronische ISSN: 1572-8145
DOI
https://doi.org/10.1007/s10845-015-1117-6

Weitere Artikel der Ausgabe 2/2018

Journal of Intelligent Manufacturing 2/2018 Zur Ausgabe

    Marktübersichten

    Die im Laufe eines Jahres in der „adhäsion“ veröffentlichten Marktübersichten helfen Anwendern verschiedenster Branchen, sich einen gezielten Überblick über Lieferantenangebote zu verschaffen.