Numerical analysis of gas-liquid two-phase flow after water inrush from the working face during tunnel excavation in a karst region

verfasst von: J. Wu, S. C. Li, Z. H. Xu

Erschienen in: Bulletin of Engineering Geology and the Environment | Ausgabe 4/2019

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

Increasingly, deep tunnels are under construction, which greatly promotes the development of tunnelling technology. Complex geological conditions and frequent geological disasters have become great challenges during tunnel excavation. Among them, casualties and economic losses caused by water inrush are on the top levels in all types of tunnel geological disasters. In the present study, numerical simulation of the gas-liquid two-phase flow is carried out by using the FLUENT software to probe water flow characteristics after water inrush. Three common cases of water inrush from the working face during double-line tunnel excavation are researched. The variation rules of velocity, pressure and water volume fraction in the tunnels after water inrush are analyzed. The water movement laws under the conditions of different excavation situations and different water inrush positions are further discussed by comparing the three case studies. When water inrush occurs on the left tunnel working face, the following conclusions are drawn: (1) The velocity is smaller at the lower location of the left and right tunnels. In the width direction of the cross passage, the velocity is smaller on the left and right sides of the section, and in the height direction, the velocity is smaller on the upper end and lower end of the cross passage. (2) The pressure decreases gradually with the increase of height in the left tunnel and the cross passage. In the vicinity of the cross passage, the pressure on one side of the left and right tunnels close to the cross passage is the minimum, and then it gradually increases towards the other side. (3) The water volume fraction decreases gradually with the increase of height. (4) The velocity, pressure and water volume fraction changes greatly at the intersection of the cross passage and tunnels. In addition, the velocity nearby the working face without water inrush is very small.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Literatur
Zurück zum Zitat Golob R, Stokelj T, Grgic D (1998) Neural-network-based water inflow forecasting. Control Eng Pract 6(5):593–600CrossRef Golob R, Stokelj T, Grgic D (1998) Neural-network-based water inflow forecasting. Control Eng Pract 6(5):593–600CrossRef
Zurück zum Zitat Heuer RE (1995) Estimating rock tunnel water inflow. In Proceedings of the rapid excavation and tunneling conference. Society for mining, metal logy and exploration, inc. pp. 41–60 Heuer RE (1995) Estimating rock tunnel water inflow. In Proceedings of the rapid excavation and tunneling conference. Society for mining, metal logy and exploration, inc. pp. 41–60
Zurück zum Zitat Huang CH, Feng T, Wang WJ, Liu H (2010) Mine water inrush prediction based on fractal and support vector machines. J Chin Coal Soc 35(5):806–810 Huang CH, Feng T, Wang WJ, Liu H (2010) Mine water inrush prediction based on fractal and support vector machines. J Chin Coal Soc 35(5):806–810
Zurück zum Zitat Huang HF, Mao XB, Yao BH, Pu H (2012) Numerical simulation on fault water-inrush based on fluid-solid coupling theory. J Coal Sci Eng 18(3):291–296CrossRef Huang HF, Mao XB, Yao BH, Pu H (2012) Numerical simulation on fault water-inrush based on fluid-solid coupling theory. J Coal Sci Eng 18(3):291–296CrossRef
Zurück zum Zitat Islam MR, Islam MS (2005) Water inrush hazard in Barapukuria coal mine, Dinajpur District, Bangladesh. Bangl J Geol 24(1):1–17 Islam MR, Islam MS (2005) Water inrush hazard in Barapukuria coal mine, Dinajpur District, Bangladesh. Bangl J Geol 24(1):1–17
Zurück zum Zitat Ivars DM (2006) Water inflow into excavations in fractured rock — a three-dimensional hydro-mechanical numerical study. Int J Rock Mech Min Sci 43(5):705–725CrossRef Ivars DM (2006) Water inflow into excavations in fractured rock — a three-dimensional hydro-mechanical numerical study. Int J Rock Mech Min Sci 43(5):705–725CrossRef
Zurück zum Zitat Jin H, Shi LQ, Yu XG, Wei JC, Li SC (2009) Mechanism of mine water-inrush through a fault from the floor. Min Sci Tech 19(3):276–281 Jin H, Shi LQ, Yu XG, Wei JC, Li SC (2009) Mechanism of mine water-inrush through a fault from the floor. Min Sci Tech 19(3):276–281
Zurück zum Zitat Li XP, Li YN (2014) Research on risk assessment system for water inrush in the karst tunnel construction based on GIS: case study on the diversion tunnel groups of the Jinping II Hydropower Station. Tunn Undergr Sp Tech 40:182–191CrossRef Li XP, Li YN (2014) Research on risk assessment system for water inrush in the karst tunnel construction based on GIS: case study on the diversion tunnel groups of the Jinping II Hydropower Station. Tunn Undergr Sp Tech 40:182–191CrossRef
Zurück zum Zitat Li LJ, Qian MG, Li SG (1996) Mechanism of water-inrush through fault. J China Coal Soc 21(2):119–123 Li LJ, Qian MG, Li SG (1996) Mechanism of water-inrush through fault. J China Coal Soc 21(2):119–123
Zurück zum Zitat Li SC, Xue YG, Zhang QS, Li SC, Li LP, Sun KG, Ge YH, Su MX, Zhong SH, Li X (2008) Key technology study on comprehensive prediction and early-warning of geological hazards during construction in high-risk karst areas. Chin J. Rock Mech Eng 27(7):1297–1307 Li SC, Xue YG, Zhang QS, Li SC, Li LP, Sun KG, Ge YH, Su MX, Zhong SH, Li X (2008) Key technology study on comprehensive prediction and early-warning of geological hazards during construction in high-risk karst areas. Chin J. Rock Mech Eng 27(7):1297–1307
Zurück zum Zitat Li QF, Wang WJ, Zhu CQ, Peng WQ (2009) Analysis of fault water-inrush mechanism based on the principle of water-resistant key strata. J Min Safe Eng 26(1):87–90 Li QF, Wang WJ, Zhu CQ, Peng WQ (2009) Analysis of fault water-inrush mechanism based on the principle of water-resistant key strata. J Min Safe Eng 26(1):87–90
Zurück zum Zitat Li LP, Li SC, Zhang QS (2010a) Study of mechanism of water inrush induced by hydraulic fracturing in karst tunnels. Rock Soil Mech 31(2):523–528 Li LP, Li SC, Zhang QS (2010a) Study of mechanism of water inrush induced by hydraulic fracturing in karst tunnels. Rock Soil Mech 31(2):523–528
Zurück zum Zitat Li SC, Li SC, Zhang QS, Xue YG, Liu B, Su MX, Wang ZC, Wang SG (2010b) Predicting geological hazards during tunnel construction. J Rock Mech Geotech Eng 2(3):232–242CrossRef Li SC, Li SC, Zhang QS, Xue YG, Liu B, Su MX, Wang ZC, Wang SG (2010b) Predicting geological hazards during tunnel construction. J Rock Mech Geotech Eng 2(3):232–242CrossRef
Zurück zum Zitat Li SC, Wu J, Xu ZH, Li LP (2017) Unascertained measure model of water and mud inrush risk evaluation in karst tunnels and its engineering application. KSCE J Civ Eng 21(4):1170–1182CrossRef Li SC, Wu J, Xu ZH, Li LP (2017) Unascertained measure model of water and mud inrush risk evaluation in karst tunnels and its engineering application. KSCE J Civ Eng 21(4):1170–1182CrossRef
Zurück zum Zitat Liang DX, Jiang ZQ, Zhu SY, Sun Q, Qian ZW (2016) Experimental research on water inrush in tunnel construction. Nat Hazards 81(1):467–480CrossRef Liang DX, Jiang ZQ, Zhu SY, Sun Q, Qian ZW (2016) Experimental research on water inrush in tunnel construction. Nat Hazards 81(1):467–480CrossRef
Zurück zum Zitat Liu HL, Yang TH, Yu QL, Chen SK, Wei CH (2010) Numerical analysis on the process of water inrush from the floor of seam 12 in Fangezhuang coal mine. Coal Geol Explor 38(3):27–31 Liu HL, Yang TH, Yu QL, Chen SK, Wei CH (2010) Numerical analysis on the process of water inrush from the floor of seam 12 in Fangezhuang coal mine. Coal Geol Explor 38(3):27–31
Zurück zum Zitat Liu Z, Jin D, Liu Q (2011) Prediction of water inrush through coal floors based on data mining classification technique. Proc Earth Planet Sci 3:166–174CrossRef Liu Z, Jin D, Liu Q (2011) Prediction of water inrush through coal floors based on data mining classification technique. Proc Earth Planet Sci 3:166–174CrossRef
Zurück zum Zitat Marinelli F, Niccoli WL (2000) Simple analytical equations for estimating ground water inflow to a mine pit. Groundwater 38(2):311–314CrossRef Marinelli F, Niccoli WL (2000) Simple analytical equations for estimating ground water inflow to a mine pit. Groundwater 38(2):311–314CrossRef
Zurück zum Zitat Meng ZP, Li GQ, Xie XT (2012) A geological assessment method of floor water inrush risk and its application. Eng Geol 143:51–60CrossRef Meng ZP, Li GQ, Xie XT (2012) A geological assessment method of floor water inrush risk and its application. Eng Geol 143:51–60CrossRef
Zurück zum Zitat Nawel B, Salah M (2015) Numerical modeling of two parallel tunnels interaction using three-dimensional finite elements method. Geomech. Eng. 9(6):775–791CrossRef Nawel B, Salah M (2015) Numerical modeling of two parallel tunnels interaction using three-dimensional finite elements method. Geomech. Eng. 9(6):775–791CrossRef
Zurück zum Zitat Qian QH (2012) Challenges faced by underground projects construction safety and countermeasures. J Rock Mech Eng 31(10):1945–1956 Qian QH (2012) Challenges faced by underground projects construction safety and countermeasures. J Rock Mech Eng 31(10):1945–1956
Zurück zum Zitat Rao JY, Xie T, Liu YM (2016) Fuzzy evaluation model for in-service karst highway tunnel structural safety. KSCE J Civ Eng 20(4):1242–1249CrossRef Rao JY, Xie T, Liu YM (2016) Fuzzy evaluation model for in-service karst highway tunnel structural safety. KSCE J Civ Eng 20(4):1242–1249CrossRef
Zurück zum Zitat Shang YJ, Yang ZF, Zeng QL, Sun YC, Shi YY, Yuan GX (2007) Retrospective analysis of TBM accidents from its poor flexibility to complicated geological conditions. J. Rock Mech Eng 26(12):2404–2411 Shang YJ, Yang ZF, Zeng QL, Sun YC, Shi YY, Yuan GX (2007) Retrospective analysis of TBM accidents from its poor flexibility to complicated geological conditions. J. Rock Mech Eng 26(12):2404–2411
Zurück zum Zitat Shi LQ, Singh RN (2001) Study of mine water inrush from floor strata through faults. Min Water Environ 20(3):140–147CrossRef Shi LQ, Singh RN (2001) Study of mine water inrush from floor strata through faults. Min Water Environ 20(3):140–147CrossRef
Zurück zum Zitat Shin YJ, Kim DH, Lee IM (2014) Numerical simulation of seepage-induced behavior of tunnel for analyzing deformation characteristic and estimating geotechnical parameters. KSCE J Civ Eng 18(2):659–671CrossRef Shin YJ, Kim DH, Lee IM (2014) Numerical simulation of seepage-induced behavior of tunnel for analyzing deformation characteristic and estimating geotechnical parameters. KSCE J Civ Eng 18(2):659–671CrossRef
Zurück zum Zitat Wang JH, Lu CC (2007) A semi-analytical method for analyzing the tunnel water inflow. Tunn Undergr Sp Tech 22(1):39–46CrossRef Wang JH, Lu CC (2007) A semi-analytical method for analyzing the tunnel water inflow. Tunn Undergr Sp Tech 22(1):39–46CrossRef
Zurück zum Zitat Wang LG, Song Y, Miao XX (2003) Study on prediction of water-inrush from coal floor based on cusp catastrophic model. Chinese J. Rock. Mech Eng 22(4):573–577 Wang LG, Song Y, Miao XX (2003) Study on prediction of water-inrush from coal floor based on cusp catastrophic model. Chinese J. Rock. Mech Eng 22(4):573–577
Zurück zum Zitat Wang TT, Wang WL, Lin ML (2004) Harnessing the catastrophic inrush of water into new Yungchuen tunnel in Taiwan. Tunn Undergr Sp Tech 19(4–5):418 Wang TT, Wang WL, Lin ML (2004) Harnessing the catastrophic inrush of water into new Yungchuen tunnel in Taiwan. Tunn Undergr Sp Tech 19(4–5):418
Zurück zum Zitat Wang YC, Jing HW, Yu LY, Su HJ, Luo N (2017) Set pair analysis for risk assessment of water inrush in karst tunnels. B Eng Geol Environ 76(3):1199–1207CrossRef Wang YC, Jing HW, Yu LY, Su HJ, Luo N (2017) Set pair analysis for risk assessment of water inrush in karst tunnels. B Eng Geol Environ 76(3):1199–1207CrossRef
Zurück zum Zitat Wu Q, Liu Y, Liu D, Zhou W (2011) Prediction of floor water inrush: the application of GIS-based AHP vulnerable index method to Donghuantuo coal mine. China Rock Mech Rock Eng 44(5):591–600CrossRef Wu Q, Liu Y, Liu D, Zhou W (2011) Prediction of floor water inrush: the application of GIS-based AHP vulnerable index method to Donghuantuo coal mine. China Rock Mech Rock Eng 44(5):591–600CrossRef
Zurück zum Zitat Wu J, Li SC, Xu ZH, Huang X, Xue YG, Wang ZC, Li LP (2017) Flow characteristics and escape-route optimization after water inrush in a backward-excavated karst tunnel. Int J Geomech 17(4):1–16. 04016096 Wu J, Li SC, Xu ZH, Huang X, Xue YG, Wang ZC, Li LP (2017) Flow characteristics and escape-route optimization after water inrush in a backward-excavated karst tunnel. Int J Geomech 17(4):1–16. 04016096
Zurück zum Zitat Wu J, Li SC, Xu ZH, Pan DD, He SJ (2018) Flow characteristics after water inrush from the working face in karst tunneling. Geomech Eng 14(5):407–419 Wu J, Li SC, Xu ZH, Pan DD, He SJ (2018) Flow characteristics after water inrush from the working face in karst tunneling. Geomech Eng 14(5):407–419
Zurück zum Zitat Yang XL, Yan RM (2015) Collapse mechanism for deep tunnel subjected to seepage force in layered soils. Geomech Eng 8(5):741–756CrossRef Yang XL, Yan RM (2015) Collapse mechanism for deep tunnel subjected to seepage force in layered soils. Geomech Eng 8(5):741–756CrossRef
Zurück zum Zitat Yin SX, Zhang JC, Liu DM (2015) A study of mine water inrushes by measurements of in situ stress and rock failures. Nat Hazards 79(3):1961–1979CrossRef Yin SX, Zhang JC, Liu DM (2015) A study of mine water inrushes by measurements of in situ stress and rock failures. Nat Hazards 79(3):1961–1979CrossRef
Zurück zum Zitat Zarei HR, Uromeily A, Sharifzadeh M (2012) Identifying geological hazards related to tunneling in carbonate karstic rocks - Zagros, Iran. Arba J Geosci 5(3):457–464CrossRef Zarei HR, Uromeily A, Sharifzadeh M (2012) Identifying geological hazards related to tunneling in carbonate karstic rocks - Zagros, Iran. Arba J Geosci 5(3):457–464CrossRef
Zurück zum Zitat Zhang JC (2005) Investigations of water inrushes from aquifers under coal seams. Int J Rock Mech Min Sci 42(3):350–360CrossRef Zhang JC (2005) Investigations of water inrushes from aquifers under coal seams. Int J Rock Mech Min Sci 42(3):350–360CrossRef
Zurück zum Zitat Zhang HS, Xue GW, Shi XW, Liu HF, Hu YQ (2009) Prediction of water inrush from coal seam floor confined based on geo-information composite overlay analysis. J China Coal Soc 34(8):1100–1104 Zhang HS, Xue GW, Shi XW, Liu HF, Hu YQ (2009) Prediction of water inrush from coal seam floor confined based on geo-information composite overlay analysis. J China Coal Soc 34(8):1100–1104
Zurück zum Zitat Zhang GM, Zhang K, Wang LJ, Wu Y (2015) Mechanism of water inrush and quicksand movement induced by a borehole and measures for prevention and remediation. B Eng Geol Environ 74(4):1395–1405CrossRef Zhang GM, Zhang K, Wang LJ, Wu Y (2015) Mechanism of water inrush and quicksand movement induced by a borehole and measures for prevention and remediation. B Eng Geol Environ 74(4):1395–1405CrossRef
Zurück zum Zitat Zhao Y, Li PF, Tian SM (2013) Prevention and treatment technologies of railway tunnel water inrush and mud gushing in China. J Rock Mech Geotech Eng 5(6):468–477CrossRef Zhao Y, Li PF, Tian SM (2013) Prevention and treatment technologies of railway tunnel water inrush and mud gushing in China. J Rock Mech Geotech Eng 5(6):468–477CrossRef
Zurück zum Zitat Zhou ZQ, Li SC, Li LP, Shi SS, Xu ZH (2015) An optimal classification method for risk assessment of water inrush in karst tunnels based on the grey system. Geomech Eng 8(5):631–647CrossRef Zhou ZQ, Li SC, Li LP, Shi SS, Xu ZH (2015) An optimal classification method for risk assessment of water inrush in karst tunnels based on the grey system. Geomech Eng 8(5):631–647CrossRef
Zurück zum Zitat Zhu WC, Wei CH (2011) Numerical simulation on mining-induced water inrushes related to geologic structures using a damage-based hydro mechanical model. Environ Earth Sci 62(1):43–54CrossRef Zhu WC, Wei CH (2011) Numerical simulation on mining-induced water inrushes related to geologic structures using a damage-based hydro mechanical model. Environ Earth Sci 62(1):43–54CrossRef
Metadaten
Titel
Numerical analysis of gas-liquid two-phase flow after water inrush from the working face during tunnel excavation in a karst region
verfasst von
J. Wu
S. C. Li
Z. H. Xu
Publikationsdatum
08.06.2018
Verlag
Springer Berlin Heidelberg
Erschienen in
Bulletin of Engineering Geology and the Environment / Ausgabe 4/2019
Print ISSN: 1435-9529
Elektronische ISSN: 1435-9537
DOI
https://doi.org/10.1007/s10064-018-1312-8

Weitere Artikel der Ausgabe 4/2019

Bulletin of Engineering Geology and the Environment 4/2019 Zur Ausgabe