Skip to main content
Erschienen in: The International Journal of Advanced Manufacturing Technology 9-12/2019

07.05.2019 | ORIGINAL ARTICLE

Process sequencing for a pick-and-place robot in a real-life flexible robotic cell

verfasst von: Mazyar Ghadiri Nejad, Seyed Mahdi Shavarani, Hüseyin Güden, Reza Vatankhah Barenji

Erschienen in: The International Journal of Advanced Manufacturing Technology | Ausgabe 9-12/2019

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

Robots are used in manufacturing cells for wide purposes including pick and place of the items from a location to a destination. As far as the authors’ knowledge in this context, the scheduling problem of a real-life flexible robotic cell (FRC) with intermediate buffers is missing in the literature. Therefore, in this study, the process-sequencing problem of a real-life FRC is considered, aiming to minimize the cyclic operation time of the cell. The problem is mathematically modeled and solved for a real case. Since computation times for solving the problems rise exponentially with increasing the number of machines in the FRC, a genetic, a simulated annealing, and a hybrid genetic algorithms are proposed to solve the large-sized problems. The objective function value of a given solution in metaheuristic algorithms is computed by solving a linear programming model. After tuning the parameters of the proposed algorithms, several numerical instances are solved, and the performance of these algorithms are evaluated and compared. The results show that the performance of the hybrid genetic algorithm was significantly better than both genetic and simulated annealing algorithms.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Barenji RV, Barenji AV, Hashemipour M (2014) A multi-agent RFID-enabled distributed control system for a flexible manufacturing shop. Int J Adv Manuf Technol 71(9–12):1773–1791CrossRef Barenji RV, Barenji AV, Hashemipour M (2014) A multi-agent RFID-enabled distributed control system for a flexible manufacturing shop. Int J Adv Manuf Technol 71(9–12):1773–1791CrossRef
2.
Zurück zum Zitat Barenji RV (2013, September) Towards a capability-based decision support system for a manufacturing shop. In: Working conference on virtual enterprises. Springer, Berlin, Heidelberg, pp 220–227 Barenji RV (2013, September) Towards a capability-based decision support system for a manufacturing shop. In: Working conference on virtual enterprises. Springer, Berlin, Heidelberg, pp 220–227
3.
Zurück zum Zitat Vatankhah Barenji R, Hashemipour M, Guerra-Zubiaga DA (2015) A framework for modelling enterprise competencies: from theory to practice in enterprise architecture. Int J Comput Integr Manuf 28(8):791–810CrossRef Vatankhah Barenji R, Hashemipour M, Guerra-Zubiaga DA (2015) A framework for modelling enterprise competencies: from theory to practice in enterprise architecture. Int J Comput Integr Manuf 28(8):791–810CrossRef
4.
Zurück zum Zitat Barenji RV, Hashemipour M, Guerra-Zubiaga DA (2013, April) Toward a modeling framework for organizational competency. In: Doctoral conference on computing, electrical and industrial systems. Springer, Berlin, Heidelberg, pp 142–151 Barenji RV, Hashemipour M, Guerra-Zubiaga DA (2013, April) Toward a modeling framework for organizational competency. In: Doctoral conference on computing, electrical and industrial systems. Springer, Berlin, Heidelberg, pp 142–151
5.
Zurück zum Zitat Ghadiri Nejad M, Güden H, Vizvári B, Vatankhah Barenji R (2018) A mathematical model and simulated annealing algorithm for solving the cyclic scheduling problem of a flexible robotic cell. Adv Mech Eng 10(1):1–12CrossRef Ghadiri Nejad M, Güden H, Vizvári B, Vatankhah Barenji R (2018) A mathematical model and simulated annealing algorithm for solving the cyclic scheduling problem of a flexible robotic cell. Adv Mech Eng 10(1):1–12CrossRef
6.
Zurück zum Zitat Erol S, Jäger A, Hold P, Ott K, Sihn W (2016) Tangible industry 4.0: a scenario-based approach to learning for the future of production. Procedia CiRp 54:13–18CrossRef Erol S, Jäger A, Hold P, Ott K, Sihn W (2016) Tangible industry 4.0: a scenario-based approach to learning for the future of production. Procedia CiRp 54:13–18CrossRef
7.
Zurück zum Zitat Gultekin H, Tula A, Akturk MS (2016) Automated robotic assembly line design with unavailability periods and tool changes. Eur J Ind Eng 10(4):499–526CrossRef Gultekin H, Tula A, Akturk MS (2016) Automated robotic assembly line design with unavailability periods and tool changes. Eur J Ind Eng 10(4):499–526CrossRef
8.
Zurück zum Zitat Lei W, Che A, Chu C (2014) Optimal cyclic scheduling of a robotic flowshop with multiple part types and flexible processing times. Eur J Ind Eng 8(2):143–167CrossRef Lei W, Che A, Chu C (2014) Optimal cyclic scheduling of a robotic flowshop with multiple part types and flexible processing times. Eur J Ind Eng 8(2):143–167CrossRef
9.
Zurück zum Zitat Huang KL, Ventura JA (2013) Two-machine flow shop scheduling with synchronous material movement. Int J Plann Sched 1(4):301–315CrossRef Huang KL, Ventura JA (2013) Two-machine flow shop scheduling with synchronous material movement. Int J Plann Sched 1(4):301–315CrossRef
10.
Zurück zum Zitat Foumani M, Smith-Miles K, Gunawan I (2017) Scheduling of two-machine robotic rework cells: in-process, post-process and in-line inspection scenarios. Robot Auton Syst 91:210–225CrossRef Foumani M, Smith-Miles K, Gunawan I (2017) Scheduling of two-machine robotic rework cells: in-process, post-process and in-line inspection scenarios. Robot Auton Syst 91:210–225CrossRef
11.
Zurück zum Zitat Vizvari B, Guden H, Ghadiri Nejad M (2019) Local search based meta-heuristic algorithms for optimizing the cyclic flexible manufacturing cell problem. Ann Optim Theory and Pract 1(3):15–32 Vizvari B, Guden H, Ghadiri Nejad M (2019) Local search based meta-heuristic algorithms for optimizing the cyclic flexible manufacturing cell problem. Ann Optim Theory and Pract 1(3):15–32
12.
Zurück zum Zitat Akturk MS, Gultekin H, Karasan OE (2005) Robotic cell scheduling with operational flexibility. Discret Appl Math 145(3):334–348MathSciNetMATHCrossRef Akturk MS, Gultekin H, Karasan OE (2005) Robotic cell scheduling with operational flexibility. Discret Appl Math 145(3):334–348MathSciNetMATHCrossRef
13.
Zurück zum Zitat Gultekin H, Akturk MS, Karasan OE (2006) Cyclic scheduling of a 2-machine robotic cell with tooling constraints. Eur J Oper Res 174(2):777–796MathSciNetMATHCrossRef Gultekin H, Akturk MS, Karasan OE (2006) Cyclic scheduling of a 2-machine robotic cell with tooling constraints. Eur J Oper Res 174(2):777–796MathSciNetMATHCrossRef
14.
Zurück zum Zitat Gultekin H, Akturk MS, Karasan OE (2007) Scheduling in a three-machine robotic flexible manufacturing cell. Comput Oper Res 34(8):2463–2477MATHCrossRef Gultekin H, Akturk MS, Karasan OE (2007) Scheduling in a three-machine robotic flexible manufacturing cell. Comput Oper Res 34(8):2463–2477MATHCrossRef
15.
Zurück zum Zitat Gultekin H, Akturk MS, Karasan OE (2008) Scheduling in robotic cells: process flexibility and cell layout. Int J Prod Res 46(8):2105–2121MATHCrossRef Gultekin H, Akturk MS, Karasan OE (2008) Scheduling in robotic cells: process flexibility and cell layout. Int J Prod Res 46(8):2105–2121MATHCrossRef
17.
Zurück zum Zitat Rajapakshe T, Dawande M, Sriskandarajah C (2011) Quantifying the impact of layout on productivity: an analysis from robotic-cell manufacturing. Oper Res 59(2):440–454MathSciNetMATHCrossRef Rajapakshe T, Dawande M, Sriskandarajah C (2011) Quantifying the impact of layout on productivity: an analysis from robotic-cell manufacturing. Oper Res 59(2):440–454MathSciNetMATHCrossRef
18.
Zurück zum Zitat Yildiz S, Karasan OE, Akturk MS (2012) An analysis of cyclic scheduling problems in robot centered cells. Comput Oper Res 39(6):1290–1299MathSciNetMATHCrossRef Yildiz S, Karasan OE, Akturk MS (2012) An analysis of cyclic scheduling problems in robot centered cells. Comput Oper Res 39(6):1290–1299MathSciNetMATHCrossRef
19.
Zurück zum Zitat Foumani M, Jenab K (2012) Cycle time analysis in reentrant robotic cells with swap ability. Int J Prod Res 50(22):6372–6387CrossRef Foumani M, Jenab K (2012) Cycle time analysis in reentrant robotic cells with swap ability. Int J Prod Res 50(22):6372–6387CrossRef
20.
Zurück zum Zitat Kim H, Kim HJ, Lee JH, Lee TE (2013) Scheduling dual-armed cluster tools with cleaning processes. Int J Prod Res 51(12):3671–3687CrossRef Kim H, Kim HJ, Lee JH, Lee TE (2013) Scheduling dual-armed cluster tools with cleaning processes. Int J Prod Res 51(12):3671–3687CrossRef
21.
Zurück zum Zitat Jiang Y, Zhang Q, Hu J, Dong J, Ji M (2015) Single-server parallel-machine scheduling with loading and unloading times. J Comb Optim 30(2):201–213MathSciNetMATHCrossRef Jiang Y, Zhang Q, Hu J, Dong J, Ji M (2015) Single-server parallel-machine scheduling with loading and unloading times. J Comb Optim 30(2):201–213MathSciNetMATHCrossRef
22.
Zurück zum Zitat Batur GD, Erol S, Karasan OE (2016) Robot move sequence determining and multiple part-type scheduling in hybrid flexible flow shop robotic cells. Comput Ind Eng 100:72–87CrossRef Batur GD, Erol S, Karasan OE (2016) Robot move sequence determining and multiple part-type scheduling in hybrid flexible flow shop robotic cells. Comput Ind Eng 100:72–87CrossRef
23.
Zurück zum Zitat Gultekin H, Dalgıç ÖO, Akturk MS (2017) Pure cycles in two-machine dual-gripper robotic cells. Robot Comput Integr Manuf 48:121–131CrossRef Gultekin H, Dalgıç ÖO, Akturk MS (2017) Pure cycles in two-machine dual-gripper robotic cells. Robot Comput Integr Manuf 48:121–131CrossRef
24.
Zurück zum Zitat Nejad MG, Kovács G, Vizvári B, Barenji RV (2018) An optimization model for cyclic scheduling problem in flexible robotic cells. Int J Adv Manuf Technol 95(9–12):3863–3873CrossRef Nejad MG, Kovács G, Vizvári B, Barenji RV (2018) An optimization model for cyclic scheduling problem in flexible robotic cells. Int J Adv Manuf Technol 95(9–12):3863–3873CrossRef
25.
Zurück zum Zitat Nejad MG, Shavarani SM, Vizvári B, Barenji RV (2018) Trade-off between process scheduling and production cost in cyclic flexible robotic cells. Int J Adv Manuf Technol 96(1–4):1081–1091CrossRef Nejad MG, Shavarani SM, Vizvári B, Barenji RV (2018) Trade-off between process scheduling and production cost in cyclic flexible robotic cells. Int J Adv Manuf Technol 96(1–4):1081–1091CrossRef
26.
Zurück zum Zitat Behjat S, Salmasi N (2017) Total completion time minimisation of no-wait flowshop group scheduling problem with sequence dependent setup times. Eur J Ind Eng 11(1):22–48CrossRef Behjat S, Salmasi N (2017) Total completion time minimisation of no-wait flowshop group scheduling problem with sequence dependent setup times. Eur J Ind Eng 11(1):22–48CrossRef
27.
Zurück zum Zitat Nestic S, Stefanovic M, Djordjevic A, Arsovski S, Tadic D (2015) A model of the assessment and optimisation of production process quality using the fuzzy sets and genetic algorithm approach. Eur J Ind Eng 9(1):77–99CrossRef Nestic S, Stefanovic M, Djordjevic A, Arsovski S, Tadic D (2015) A model of the assessment and optimisation of production process quality using the fuzzy sets and genetic algorithm approach. Eur J Ind Eng 9(1):77–99CrossRef
28.
Zurück zum Zitat Mosallaeipour S, Nejad MG, Shavarani SM, Nazerian R (2018) Mobile robot scheduling for cycle time optimization in flow-shop cells, a case study. Prod Eng 12(1):83–94CrossRef Mosallaeipour S, Nejad MG, Shavarani SM, Nazerian R (2018) Mobile robot scheduling for cycle time optimization in flow-shop cells, a case study. Prod Eng 12(1):83–94CrossRef
29.
Zurück zum Zitat Liu Q, Xu J, Zhang Z (2015) Construction supply chain-based dynamic optimisation for the purchasing and inventory in a large scale construction project. Eur J Ind Eng 9(6):839–865CrossRef Liu Q, Xu J, Zhang Z (2015) Construction supply chain-based dynamic optimisation for the purchasing and inventory in a large scale construction project. Eur J Ind Eng 9(6):839–865CrossRef
30.
Zurück zum Zitat Jiang D, Li H, Yang T, Li D (2016) Genetic algorithm for inventory positioning problem with general acyclic supply chain networks. Eur J Ind Eng 10(3):367–384CrossRef Jiang D, Li H, Yang T, Li D (2016) Genetic algorithm for inventory positioning problem with general acyclic supply chain networks. Eur J Ind Eng 10(3):367–384CrossRef
31.
Zurück zum Zitat Shavarani SM, Nejad MG, Rismanchian F, Izbirak G (2018) Application of hierarchical facility location problem for optimization of a drone delivery system: a case study of Amazon prime air in the city of San Francisco. Int J Adv Manuf Technol 95(9–12):3141–3153CrossRef Shavarani SM, Nejad MG, Rismanchian F, Izbirak G (2018) Application of hierarchical facility location problem for optimization of a drone delivery system: a case study of Amazon prime air in the city of San Francisco. Int J Adv Manuf Technol 95(9–12):3141–3153CrossRef
32.
Zurück zum Zitat Ghadiri Nejad M, Banar M (2018) Emergency response time minimization by incorporating ground and aerial transportation. Ann Optim Theory Pract 1(1):43–57 Ghadiri Nejad M, Banar M (2018) Emergency response time minimization by incorporating ground and aerial transportation. Ann Optim Theory Pract 1(1):43–57
33.
Zurück zum Zitat Güden H, Meral S (2016) An adaptive simulated annealing algorithm-based approach for assembly line balancing and a real-life case study. Int J Adv Manuf Technol 84(5–8):1539–1559 Güden H, Meral S (2016) An adaptive simulated annealing algorithm-based approach for assembly line balancing and a real-life case study. Int J Adv Manuf Technol 84(5–8):1539–1559
34.
Zurück zum Zitat Nejad MG, Kashan AH, Shavarani SM (2018) A novel competitive hybrid approach based on grouping evolution strategy algorithm for solving U-shaped assembly line balancing problems. Prod Eng 12(5):555–566CrossRef Nejad MG, Kashan AH, Shavarani SM (2018) A novel competitive hybrid approach based on grouping evolution strategy algorithm for solving U-shaped assembly line balancing problems. Prod Eng 12(5):555–566CrossRef
35.
Zurück zum Zitat Al-Araidah O, Dalalah D, Azeez MEAA, Khasawneh MT (2017) A heuristic for clustering and picking small items considering safe reach of the order picker. Eur J Ind Eng 11(2):256–269CrossRef Al-Araidah O, Dalalah D, Azeez MEAA, Khasawneh MT (2017) A heuristic for clustering and picking small items considering safe reach of the order picker. Eur J Ind Eng 11(2):256–269CrossRef
36.
Zurück zum Zitat Lee MC, Wee HM, Wu S, Wang CE, Chung RL (2015) A bi-level inventory replenishment strategy using clustering genetic algorithm. Eur J Ind Eng 9(6):774–793CrossRef Lee MC, Wee HM, Wu S, Wang CE, Chung RL (2015) A bi-level inventory replenishment strategy using clustering genetic algorithm. Eur J Ind Eng 9(6):774–793CrossRef
37.
Zurück zum Zitat Vatankhah Barenji R, Ghadiri Nejad M, Asghari I (2018) Optimally sized design of a wind/photovoltaic/fuel cell off-grid hybrid energy system by modified-gray wolf optimization algorithm. Energy Environ 29(6):1053–1070CrossRef Vatankhah Barenji R, Ghadiri Nejad M, Asghari I (2018) Optimally sized design of a wind/photovoltaic/fuel cell off-grid hybrid energy system by modified-gray wolf optimization algorithm. Energy Environ 29(6):1053–1070CrossRef
Metadaten
Titel
Process sequencing for a pick-and-place robot in a real-life flexible robotic cell
verfasst von
Mazyar Ghadiri Nejad
Seyed Mahdi Shavarani
Hüseyin Güden
Reza Vatankhah Barenji
Publikationsdatum
07.05.2019
Verlag
Springer London
Erschienen in
The International Journal of Advanced Manufacturing Technology / Ausgabe 9-12/2019
Print ISSN: 0268-3768
Elektronische ISSN: 1433-3015
DOI
https://doi.org/10.1007/s00170-019-03739-6

Weitere Artikel der Ausgabe 9-12/2019

The International Journal of Advanced Manufacturing Technology 9-12/2019 Zur Ausgabe

    Marktübersichten

    Die im Laufe eines Jahres in der „adhäsion“ veröffentlichten Marktübersichten helfen Anwendern verschiedenster Branchen, sich einen gezielten Überblick über Lieferantenangebote zu verschaffen.