Skip to main content
Erschienen in: Rock Mechanics and Rock Engineering 4/2024

13.01.2024 | Original Paper

Research on the Control Technology and Key Parameters of External Anchor-Internal Unloading of Surrounding Rock During Gob-Side Entry Driving Under Severe Mining of 1000-m-Deep Mine

verfasst von: Shengrong Xie, Hui Li, Dongdong Chen, Shaohua Feng, Junhui Yang, Xiang Ma, Zaisheng Jiang, Shikun Xing

Erschienen in: Rock Mechanics and Rock Engineering | Ausgabe 4/2024

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

The continuous large deformation of the surrounding rock during gob-side entry driving in a 1000-m-deep mine requires frequent renovation of the mining roadway, seriously restricting the normal mining operations at the coal face. Taking 11,216 headgate of a coal mine as the engineering background, this paper expounds that the large deformation factors of the gob-side entry driving of a 1000-m-deep mine are stress-field factors dominated by high in-situ stress, side abutment pressure, front abutment pressure and tectonic stress, and stress-related factors dominated by coal body crushing, unreasonable support, large section size and broken narrow coal pillar. The two-stage pressurization of the surrounding rock of the section roadway of the mine is governed by the following fundamental law: After pressurization, the peak area of the original abutment pressure of the roadway transfers to the lower parts of the surrounding rock, resulting in an increased stress in the surrounding rock at the side of the roadway. A targeted cooperative control involving external anchor-internal unloading of the surrounding rock of the roadway during gob-side entry driving is proposed, and the pressure relief mechanism in the surrounding rock during the static and dynamic pressure stages of the hole-making process is elucidated: the hole-making space transfers the peak stress to the deep during the static pressure stage, and it transfers the high stress to the deep during the dynamic pressure stage. The pressure relief laws of the surrounding rock were analyzed for different hole-making parameters during the static and dynamic pressure stages of deep gob-side entry driving, the hole-making parameters of the 11,216 headgate were as follows: the hole-making depth, length, and spacing were 8, 4, and 3.2 m. A “four-in-one” double space monitoring method was developed to evaluate the control effect of the support structure on the surrounding rock. The results indicated that the surrounding rock deformation remained within a controllable range, the support structure did not experience any breakage or detachment throughout the service period, and the hole-making space played a pressure relief role. The successful application of this technology to control the large deformations in the surrounding rock of coal roadways in deep mines via gob-side entry driving is of great scientific significance.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literatur
Metadaten
Titel
Research on the Control Technology and Key Parameters of External Anchor-Internal Unloading of Surrounding Rock During Gob-Side Entry Driving Under Severe Mining of 1000-m-Deep Mine
verfasst von
Shengrong Xie
Hui Li
Dongdong Chen
Shaohua Feng
Junhui Yang
Xiang Ma
Zaisheng Jiang
Shikun Xing
Publikationsdatum
13.01.2024
Verlag
Springer Vienna
Erschienen in
Rock Mechanics and Rock Engineering / Ausgabe 4/2024
Print ISSN: 0723-2632
Elektronische ISSN: 1434-453X
DOI
https://doi.org/10.1007/s00603-023-03722-4

Weitere Artikel der Ausgabe 4/2024

Rock Mechanics and Rock Engineering 4/2024 Zur Ausgabe