Skip to main content

2022 | OriginalPaper | Buchkapitel

Smart Redevelopment of Existing Buildings. Use of BIM in Economic Value Judgments

verfasst von : Francesca Salvo, Manuela De Ruggiero, Daniela Tavano

Erschienen in: Urban Regeneration Through Valuation Systems for Innovation

Verlag: Springer International Publishing

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

Industry 4.0, digitalization, smart building, virtual reality: these are terms that are also entering into the common use of a traditional sector such as that of real estate, a sector that today is at the centre of a revolution of approaches, methods, and processes. There is a change in the way of understanding the building that goes from being a simple shell to an advanced technological object. The advantages of living in a smart home compared to a traditional home are clearly numerous both from an economic point of view and from a psychophysical point of view but the real challenge, Nowadays, it is to be able to redevelop in a smart key existing buildings or belonging to the historical real estate. The topic of smart building becomes more complex when we talk about existing buildings because the constraints of intervention are many and therefore the decision margins to promote redevelopment actions are significantly reduced. With a view to redesigning existing buildings to make them economically viable, the BIM technology is a particularly effective tool, embracing a philosophy that bears witness to the concept of digitalization of the built environment, Today, the foundation of innovation in the construction industry. The estimation of the costs to be incurred for different improvement scenarios can be conducted through the BIM automatically. This makes it possible to simplify the analysis of economic feasibility in the processes of transformation of a property by orienting more effectively the identification of the best use of the property.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Acampa G, Marino G, Ticali D (2019) Validation of infrastructures through BIM. AIP Conf Proc 2186:160011CrossRef Acampa G, Marino G, Ticali D (2019) Validation of infrastructures through BIM. AIP Conf Proc 2186:160011CrossRef
2.
Zurück zum Zitat Ashworth A (2004) Cost studies of building. Pearson Education Limited, Essex, UK Ashworth A (2004) Cost studies of building. Pearson Education Limited, Essex, UK
3.
Zurück zum Zitat Azhar S, Khalfan M, Maqsood T (2015) Building information modelling (BIM): now and beyond. Constr Econ Build 12:15–28CrossRef Azhar S, Khalfan M, Maqsood T (2015) Building information modelling (BIM): now and beyond. Constr Econ Build 12:15–28CrossRef
4.
Zurück zum Zitat Battisti F, Campo O (2019) A methodology for determining the profitability index of real estate initiatives involving public–private partnerships. a case study: the integrated intervention programs in Rome. Sustainability 11:1371 Battisti F, Campo O (2019) A methodology for determining the profitability index of real estate initiatives involving public–private partnerships. a case study: the integrated intervention programs in Rome. Sustainability 11:1371
5.
Zurück zum Zitat Begić H, Galić M (2021) A systematic review of construction 4.0 in the context of the BIM 4.0 premise. Buildings 11(8):337 Begić H, Galić M (2021) A systematic review of construction 4.0 in the context of the BIM 4.0 premise. Buildings 11(8):337
6.
Zurück zum Zitat Cartlidge D (2009) Quantity surveyor’s pocket book. Butterworth-Heinemann, Oxford, UKCrossRef Cartlidge D (2009) Quantity surveyor’s pocket book. Butterworth-Heinemann, Oxford, UKCrossRef
7.
Zurück zum Zitat Centre for Digital Built Britain (2018) Supporting BIM in the UK: University of Cambridge Centre for Digital Built Britain (2018) Supporting BIM in the UK: University of Cambridge
8.
Zurück zum Zitat Charef R, Alaka H, Emmitt S (2018) Beyond the third dimension of BIM: a systematic review of literature and assessment of professional views. J Build Eng 19:242–257CrossRef Charef R, Alaka H, Emmitt S (2018) Beyond the third dimension of BIM: a systematic review of literature and assessment of professional views. J Build Eng 19:242–257CrossRef
9.
Zurück zum Zitat De Lange P, Bähre B, Finetti-Imhof C, Klamma R, Koch A, Oppermann L (2017) Socio-technical challenges in the digital gap between building information modeling and industry 4.0. In: Proceedings of the STPIS@ CAiSE, Essen, Germany, 13 June, pp 33–46 De Lange P, Bähre B, Finetti-Imhof C, Klamma R, Koch A, Oppermann L (2017) Socio-technical challenges in the digital gap between building information modeling and industry 4.0. In: Proceedings of the STPIS@ CAiSE, Essen, Germany, 13 June, pp 33–46
10.
Zurück zum Zitat Dotzour M, Grissom T, Liu C, Pearson T (1990) Highest and best use: the evolving paradigm. J Real Estate Res 5:17–32CrossRef Dotzour M, Grissom T, Liu C, Pearson T (1990) Highest and best use: the evolving paradigm. J Real Estate Res 5:17–32CrossRef
11.
Zurück zum Zitat Eastman C, Teicholz P, Sacks R, Liston K (2011) BIM handbook: a guide to building information modeling. John Wiley & Sons, Hoboken, NJ, USA Eastman C, Teicholz P, Sacks R, Liston K (2011) BIM handbook: a guide to building information modeling. John Wiley & Sons, Hoboken, NJ, USA
12.
Zurück zum Zitat El Yamani S, Ettarid M, Hajji R (2019) Building information modeling potential for an enhanced real estate valuation approach based on the hedonic method. Wit Trans Built Environ 192:305–316CrossRef El Yamani S, Ettarid M, Hajji R (2019) Building information modeling potential for an enhanced real estate valuation approach based on the hedonic method. Wit Trans Built Environ 192:305–316CrossRef
13.
Zurück zum Zitat Forte C (1968) Elementi di Estimo Urbano. Etas Kompass, Milan, Italy Forte C (1968) Elementi di Estimo Urbano. Etas Kompass, Milan, Italy
14.
Zurück zum Zitat Geltner D, Miller NG, Clayton J, Eichholtz P (2001) Commercial real estate analysis and investments. South-Western Educational Pub: Cincinnati, OH, USA, vol 1, p 642 Geltner D, Miller NG, Clayton J, Eichholtz P (2001) Commercial real estate analysis and investments. South-Western Educational Pub: Cincinnati, OH, USA, vol 1, p 642
15.
Zurück zum Zitat Hardin B, McCool D (2009) BIM and construction management: proven tools, methods, and workflows. John Wiley & Sons: Hoboken, NJ, USA Hardin B, McCool D (2009) BIM and construction management: proven tools, methods, and workflows. John Wiley & Sons: Hoboken, NJ, USA
16.
Zurück zum Zitat Isikdag U, Underwood J (2010) Two design patterns for facilitating building information model-based synchronous collaboration. Autom Constr 19:544–553CrossRef Isikdag U, Underwood J (2010) Two design patterns for facilitating building information model-based synchronous collaboration. Autom Constr 19:544–553CrossRef
17.
Zurück zum Zitat Jiang X (2011) Developments in cost estimating and scheduling in BIM technology. Master’s Thesis, Northeastern University, Boston, MA, USA Jiang X (2011) Developments in cost estimating and scheduling in BIM technology. Master’s Thesis, Northeastern University, Boston, MA, USA
18.
Zurück zum Zitat Kehily D, Underwood J (2017) Embedding life cycle costing in 5D BIM. J Inf Technol Constr 22:145–167 Kehily D, Underwood J (2017) Embedding life cycle costing in 5D BIM. J Inf Technol Constr 22:145–167
19.
Zurück zum Zitat Lu W, Fung A, Peng Y, Liang C, Rowlinson S (2014) Cost-benefit analysis of Building Information Modeling implementation in building projects through demystification of time-effort distribution curves. Build Environ 82:317–327CrossRef Lu W, Fung A, Peng Y, Liang C, Rowlinson S (2014) Cost-benefit analysis of Building Information Modeling implementation in building projects through demystification of time-effort distribution curves. Build Environ 82:317–327CrossRef
20.
Zurück zum Zitat Ma X, Xiong F, Olawumi TO, Dong N, Chan APC (2018) Conceptual framework and roadmap approach for integrating BIM into lifecycle project management. J Manag Eng 34:05018011CrossRef Ma X, Xiong F, Olawumi TO, Dong N, Chan APC (2018) Conceptual framework and roadmap approach for integrating BIM into lifecycle project management. J Manag Eng 34:05018011CrossRef
21.
Zurück zum Zitat Martinez-Aires M, López-Alonso M, Rojas MM (2018) Building information modeling and safety management: a systematic review. Saf Sci 101:11–18CrossRef Martinez-Aires M, López-Alonso M, Rojas MM (2018) Building information modeling and safety management: a systematic review. Saf Sci 101:11–18CrossRef
22.
Zurück zum Zitat Marzouk M, Azab S, Metawie M (2018) BIM-based approach for optimizing life cycle costs of sustainable buildings. J Clean Prod 188:217–226CrossRef Marzouk M, Azab S, Metawie M (2018) BIM-based approach for optimizing life cycle costs of sustainable buildings. J Clean Prod 188:217–226CrossRef
23.
Zurück zum Zitat Maskuriy R, Selamat A, Ali KN, Maresova P, Krejcar O (2019) Industry 4.0 for the construction industry—how ready is the industry? Appl. Sci. 9. Maskuriy R, Selamat A, Ali KN, Maresova P, Krejcar O (2019) Industry 4.0 for the construction industry—how ready is the industry? Appl. Sci. 9.
24.
Zurück zum Zitat Mayouf M, Gerges M, Cox S (2019) Design, technology. 5D BIM: an investigation into the integration of quantity surveyors within the BIM process. J Eng Des Technol 17:537–553 Mayouf M, Gerges M, Cox S (2019) Design, technology. 5D BIM: an investigation into the integration of quantity surveyors within the BIM process. J Eng Des Technol 17:537–553
25.
Zurück zum Zitat Nour M, Hosny O, Elhakeem A (2012) A BIM based energy and lifecycle cost analysis/optimization approach. Int J Eng Res Appl 2:411–418 Nour M, Hosny O, Elhakeem A (2012) A BIM based energy and lifecycle cost analysis/optimization approach. Int J Eng Res Appl 2:411–418
26.
Zurück zum Zitat Oesterreich TD, Teuteberg F (2016) Understanding the implications of digitization and automation in the context of Industry 4.0: a triangulation approach and elements of a research agenda for the construction industry. Comput Ind 83:121–139CrossRef Oesterreich TD, Teuteberg F (2016) Understanding the implications of digitization and automation in the context of Industry 4.0: a triangulation approach and elements of a research agenda for the construction industry. Comput Ind 83:121–139CrossRef
27.
Zurück zum Zitat Olatunji OA, Sher WD, Ogunsemi DR (2010) The impact of building information modelling on construction cost estimation. In Proceedings of the 18th CIB World Building Congress, Salford, UK, 10–13 May 2010 Olatunji OA, Sher WD, Ogunsemi DR (2010) The impact of building information modelling on construction cost estimation. In Proceedings of the 18th CIB World Building Congress, Salford, UK, 10–13 May 2010
28.
Zurück zum Zitat Olbina S, Elliott JW (2019) Contributing project characteristics and realized benefits of successful BIM implementation: a comparison of complex and simple buildings. Buildings 9:175CrossRef Olbina S, Elliott JW (2019) Contributing project characteristics and realized benefits of successful BIM implementation: a comparison of complex and simple buildings. Buildings 9:175CrossRef
29.
Zurück zum Zitat Park J (2017) Dynamic multi-dimensional BIM for total construction as-built documentation. Purdue University: West Lafayette, IN, USA Park J (2017) Dynamic multi-dimensional BIM for total construction as-built documentation. Purdue University: West Lafayette, IN, USA
30.
Zurück zum Zitat Redmond A, Hore AV, West R (2011) Developing a cloud integrated life cycle costing analysis model through BIM. In Proceedings of the computer knowledge building, Sophia Antipolis, France, 26–28 October 2011 Redmond A, Hore AV, West R (2011) Developing a cloud integrated life cycle costing analysis model through BIM. In Proceedings of the computer knowledge building, Sophia Antipolis, France, 26–28 October 2011
31.
Zurück zum Zitat Saeed ZO, Almukhtar A, Abanda H, Tah J (2021) BIM applications in post-conflict contexts: the reconstruction of Mosul City. Buildings 11:351CrossRef Saeed ZO, Almukhtar A, Abanda H, Tah J (2021) BIM applications in post-conflict contexts: the reconstruction of Mosul City. Buildings 11:351CrossRef
32.
Zurück zum Zitat Shi A, Shirowzhan S, Sepasgozar SM, Kaboli A (2020) 5D BIM applications in quantity surveying: dynamo and 3D printing technologies. Smart Cities Constr 139 Shi A, Shirowzhan S, Sepasgozar SM, Kaboli A (2020) 5D BIM applications in quantity surveying: dynamo and 3D printing technologies. Smart Cities Constr 139
33.
Zurück zum Zitat Simonotti M (1995) La logica estimativa del valore di trasformazione. Aestimum 33:15–33 Simonotti M (1995) La logica estimativa del valore di trasformazione. Aestimum 33:15–33
34.
Zurück zum Zitat Smith P (2014) BIM & the 5D project cost manager. Proc Soc Behav Sci 119:475–484CrossRef Smith P (2014) BIM & the 5D project cost manager. Proc Soc Behav Sci 119:475–484CrossRef
35.
Zurück zum Zitat Soust-Verdaguer B, Llatas C, García-Martínez A (2017) Critical review of bim-based LCA method to buildings. Energy Build 136:110–120CrossRef Soust-Verdaguer B, Llatas C, García-Martínez A (2017) Critical review of bim-based LCA method to buildings. Energy Build 136:110–120CrossRef
36.
Zurück zum Zitat Viklund Tallgren M, Roupé M, Johansson M, Bosch-Sijtsema P (2020) BIM-tool development enhancing collaborative scheduling for pre-construction. J Inf Technol Constr 25:374–397 Viklund Tallgren M, Roupé M, Johansson M, Bosch-Sijtsema P (2020) BIM-tool development enhancing collaborative scheduling for pre-construction. J Inf Technol Constr 25:374–397
37.
Zurück zum Zitat Wildenauer AA (2020) Critical assessment of the existing definitions of BIM dimensions on the example of Switzerland. Terminology 23:24 Wildenauer AA (2020) Critical assessment of the existing definitions of BIM dimensions on the example of Switzerland. Terminology 23:24
38.
Zurück zum Zitat Wu S, Wood G, Ginige K, Jong SW (2014) A technical review of BIM based cost estimating in UK quantity surveying practice, standards and tools. J Inf Technol Constr 19:534–562 Wu S, Wood G, Ginige K, Jong SW (2014) A technical review of BIM based cost estimating in UK quantity surveying practice, standards and tools. J Inf Technol Constr 19:534–562
39.
Zurück zum Zitat You Z, Feng L (2020) Integration of industry 4.0 related technologies in construction industry: a framework of cyber-physical system. IEEE Access 8:122908–122922CrossRef You Z, Feng L (2020) Integration of industry 4.0 related technologies in construction industry: a framework of cyber-physical system. IEEE Access 8:122908–122922CrossRef
40.
Zurück zum Zitat Yu H, Liu Y (2016) Integrating geographic information system and building information model for real estate valuation. In: Proceedings of the FIG working week 2016, Christchurch, New Zealand, 2–6 May 2016 Yu H, Liu Y (2016) Integrating geographic information system and building information model for real estate valuation. In: Proceedings of the FIG working week 2016, Christchurch, New Zealand, 2–6 May 2016
Metadaten
Titel
Smart Redevelopment of Existing Buildings. Use of BIM in Economic Value Judgments
verfasst von
Francesca Salvo
Manuela De Ruggiero
Daniela Tavano
Copyright-Jahr
2022
DOI
https://doi.org/10.1007/978-3-031-12814-1_18