Ausgabe 4/2016
Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA) 2013-Part 2
Inhalt (9 Artikel)
A memetic algorithm to solve an unrelated parallel machine scheduling problem with auxiliary resources in semiconductor manufacturing
Abdoul Bitar, Stéphane Dauzère-Pérès, Claude Yugma, Renaud Roussel
Dynamic patient admission scheduling with operating room constraints, flexible horizons, and patient delays
Sara Ceschia, Andrea Schaerf
Lawler’s minmax cost algorithm: optimality conditions and uncertainty
Nadia Brauner, Gerd Finke, Yakov Shafransky, Dzmitry Sledneu
A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations
Patricio Lamas, Erik Demeulemeester
Configuration and the advantages of the shifting bottleneck procedure for optimizing the job shop total weighted tardiness scheduling problem
Yi Tan, Torsten Hildebrandt, Bernd Scholz-Reiter
Late acceptance hill-climbing for high school timetabling
George H. G. Fonseca, Haroldo G. Santos, Eduardo G. Carrano
Open Access
A Step Counting Hill Climbing Algorithm applied to University Examination Timetabling
Yuri Bykov, Sanja Petrovic