Skip to main content
Erschienen in: Soft Computing 22/2021

24.08.2021 | Optimization

A resource flow-based branch-and-bound algorithm to solve fuzzy stochastic resource-constrained project scheduling problem

verfasst von: Yaghoub Alipouri

Erschienen in: Soft Computing | Ausgabe 22/2021

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

In this paper, a resource flow-based branch-and-bound procedure is designed to solve the well-known resource-constrained project scheduling problem under the mixed uncertainty of fuzziness and randomness (FS-RCPSP). The objective is to minimize the expected makespan of the project subject to precedence and resource constraints. The proposed branch-and-bound can be employed to obtain optimal solutions and also can be truncated in order to find promising near optimal solutions. The depth-first strategy is utilized for constructing the search tree, and earliest start time (EST) concept is adopted for selecting a node for further branching while traversing the tree down to the leaves. The performance of developed branch-and-bound is benchmarked against CPLEX and SADESP across an extensive set of 960 problems. The results returned by the proposed algorithm show experimentally its effectiveness to solve the FS-RCPSP.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literatur
Zurück zum Zitat Atli O, Kahraman C (2013) The MinSlack and Kangaroo algorithm heuristic for fuzzy resource-constrained project scheduling problems. J Mult Valued Logic Soft Comput 20(1–2):189–219MathSciNet Atli O, Kahraman C (2013) The MinSlack and Kangaroo algorithm heuristic for fuzzy resource-constrained project scheduling problems. J Mult Valued Logic Soft Comput 20(1–2):189–219MathSciNet
Zurück zum Zitat Demeulemeester EL, Herroelen WS (2002) Project scheduling: a research handbook. International series in operations research and management science vol 49, Kluwer Academic Publishers (now Springer). https://doi.org/10.1007/b101924 Demeulemeester EL, Herroelen WS (2002) Project scheduling: a research handbook. International series in operations research and management science vol 49, Kluwer Academic Publishers (now Springer). https://​doi.​org/​10.​1007/​b101924
Zurück zum Zitat Huang W, Ding L, Wen B, Cao B (2009) Project scheduling problem for software development with random fuzzy activity duration times. In: Yu W, He H, Zhang N (eds) Advances in neural networks – ISNN 2009. ISNN 2009. Lecture Notes in Computer Science, vol 5552. Springer, Berlin. https://doi.org/10.1007/978-3-642-01510-6_8 Huang W, Ding L, Wen B, Cao B (2009) Project scheduling problem for software development with random fuzzy activity duration times. In: Yu W, He H, Zhang N (eds) Advances in neural networks – ISNN 2009. ISNN 2009. Lecture Notes in Computer Science, vol 5552. Springer, Berlin. https://​doi.​org/​10.​1007/​978-3-642-01510-6_​8
Zurück zum Zitat Lawler EL (1976) Combinatorial optimization: networks and matroids. Holt, Rinehart and Winston, New YorkMATH Lawler EL (1976) Combinatorial optimization: networks and matroids. Holt, Rinehart and Winston, New YorkMATH
Zurück zum Zitat Nematian J, Eshghi K, Eshragh-Jahromi A (2010) A resource-constrained project scheduling problem with fuzzy random duration. J Uncertain Syst 4(2):123–132 Nematian J, Eshghi K, Eshragh-Jahromi A (2010) A resource-constrained project scheduling problem with fuzzy random duration. J Uncertain Syst 4(2):123–132
Zurück zum Zitat Sadeh N, Otsuka S, Schelback R (1993) Predictive and reactive scheduling with the microboss production scheduling and control system. In: Proceedings of the IJCAI-93. workshop on knowledge-based production planning, scheduling and control, pp 293–306 Sadeh N, Otsuka S, Schelback R (1993) Predictive and reactive scheduling with the microboss production scheduling and control system. In: Proceedings of the IJCAI-93. workshop on knowledge-based production planning, scheduling and control, pp 293–306
Metadaten
Titel
A resource flow-based branch-and-bound algorithm to solve fuzzy stochastic resource-constrained project scheduling problem
verfasst von
Yaghoub Alipouri
Publikationsdatum
24.08.2021
Verlag
Springer Berlin Heidelberg
Erschienen in
Soft Computing / Ausgabe 22/2021
Print ISSN: 1432-7643
Elektronische ISSN: 1433-7479
DOI
https://doi.org/10.1007/s00500-021-06147-9

Weitere Artikel der Ausgabe 22/2021

Soft Computing 22/2021 Zur Ausgabe

Premium Partner